Engineering earthwork contract model


Party A: _________ ID:

Party B: _________ ID card:

The following agreement was reached through friendly consultations between the two parties:

Party A guarantees the smooth flow of roads, soil borrowing, loading and unloading during construction.

Party B is responsible for transportation: Transportation place: Party B is required to: Vehicle; the length of the car is 5.3 meters, the width of the car is 2.3 meters, and the height of the car is 1.4 meters. Shipping distance: kilometer freight: yuan/settlement method: settlement by train, 24 hours settlement

The parties agree that the construction vehicles will be arranged in the _______ ___ ___ day on the _______ year ___ ___ day, and the Party B will pay the rent.

Party A shall arrange for Party B to collect reasonable management fees for the project: __% breach of contract for the total cost of the project: If Party B arrives at the agreed time, Party A shall have 500 yuan per day for each party if there is no project arrangement. Party B’s team did not arrive at the construction site and construction as agreed, and the defaulting party pays Party A a breach of contract of 500 yuan/day.

This agreement shall have the same legal effect after being signed by both parties in duplicate.

Party A: __________________________ Party B: __________________________ Representative: ________________________ Representative: _________________________ Earthwork Transport Contract Example 2 Contractor: ___________________________ Contractor: ___________________________According to the Economic Contract Law of the People's Republic of China and the Building Law of the People's Republic of China And other relevant laws, administrative regulations, equality, voluntariness, fairness and good faith, the two parties have reached this agreement on the construction project.

First, the project overview:

Project Name: ___________________________ Project Location: ___________________________ II. Project Contracting Scope:

The foundation pit is transported by earth.

Third, the contract period:

___________________________ IV. Engineering Quality Standards:

The quality standard of this project is comprehensive and excellent according to the current national excavation acceptance specification.

5. Calculation method of unit price and price of contract and engineering quantity:

The total unit price of the project remarks indicates that the earthwork outbound yuan/square meter is multiplied by the actual number of squares and the unit price of the earthwork is calculated by the real party;

2 The unit price includes the cost of mechanical machinery and the cost of foreign transportation and loading;

3 The unit price includes the cleaning cost of the outbound mud tail site;

4 The unit price includes all the costs of Party B's machinery entering and exiting.

Sixth, payment method:

1. Settlement on a monthly basis, 80% of the actual completion amount per month, and deduct the relevant fines and related expenses at the time of settlement and pay to Party B;

2. Pay 95% of the completed work volume within three months after the completion of the main foundation pit;

3. All earthworks and hand-tail work will be paid within 5% within six months after completion.

1. Handling construction permit, residual mud emission certificate, etc.;