Summary of Year-end Work of Reservoir Irrigation District Management Office
Over the past year, with the correct leadership and strong support of the Water Affairs Bureau, we have adhered to Deng Xiaoping Theory and the important thinking of "xxxx" and the scientific development concept, and conscientiously studied and implemented the spirit of the Fourth and Fifth Plenary Sessions of the Party’s XX and xx sessions. In-depth development of the first-class competition for the main line, in accordance with the "hard work, standing in Shaanxi, leading the development, innovation, and be the leader of the South", the spirit of the water conservancy work conference at all levels, in all directions Serve the economic and social development as the purpose, comprehensively improve the comprehensive benefits of the reservoir project as the core, in accordance with the "unified thinking, firm confidence, start from me, steady development" work ideas. Strengthen project management and internal management; increase urban industrial water supply; speed up the pace of water price reform; comprehensively do a good job in reservoir flood control and water source protection; properly handle various internal contradictions within the unit. Strengthening party building and spiritual civilization construction, through the joint efforts of all cadres and workers, successfully completed all the tasks of the year. The work of the year is now reported as follows:
I. Achievements achieved
At the beginning of the year, in the case of severe water shortage in the reservoir, we actively coordinated the water use contradiction between the three parties in the principle of “first city water supply, re-industrial water use, post-agricultural irrigation”, scientifically allocate, save water, and improve water resource utilization. We have done a good job in industrial and agricultural and urban water supply. Completed this year's various economic income tasks, including the completion of urban water supply fee income of 2.47 million yuan; industrial water supply fee income of 840,000 yuan; agricultural irrigation fee income of 31,700 yuan; other income of 161,000 yuan. In the whole year, the total economic income was 3.52 million yuan. The annual task indicators were exceeded.
The flood prevention work is in place to ensure the safety of the three reservoirs.
First, although there have been few waters in the drought and less rain in recent years, the pressure on flood control is not great, but we have no numbness. By the end of March, the plans for the three reservoirs of Xuefeng, Southwest and Zhaojiapo and the emergency plans for prevention, looting and evacuation were completed, which provided a systematic scientific basis for the flood control work of the reservoir. Second, the establishment of a flood prevention organization to fully implement the reservoir responsibility. The implementation of the reservoir flood control responsibility system with the main leaders of the municipal party committee, the municipal government, the people's congress, the CPPCC, the Water Affairs Bureau and other departments as the flood control administrative responsibility person, the establishment of the flood control headquarters, the headquarters is commanded by the head of the unit, and other leaders are divided into specific divisions. Unified leadership, responsible for grading. At the same time, a clear division of labor is carried out for the internal personnel of the unit, which are divided into six flood prevention teams, such as rescue team members, observation and forecasting, engineering monitoring, communication, and logistics supply. The third is to improve and implement the system of duty and management in the flood season, and implement leadership to strengthen the flood control force. The computer room management system, the duty system, and the specification of the report program were formulated to ensure timely and accurate transmission of public opinion, and the leadership system was always adhered to. The fourth is to carry out pre-mortem inspections to eliminate hidden dangers. The water gauge was refreshed and replaced, various communication facilities were commissioned, and various purchase and sale contracts for anti-mite materials were signed with the relevant stores, and the factories and mines were contacted to implement the flood prevention and rescue team. Warning signs were set up in the dangerous areas under the jurisdiction, the guardrails were built, and the protection scope of the channels and buildings was clarified. There was no unsafe accident in the past year.
Strengthen the maintenance of dry branch canal to ensure smooth water supply.
Over the years, due to financial constraints, the dry branch can not be well maintained, especially since this year, China National Petroleum and Natural Gas drilled in the Banqiaoshan section, causing many channels to collapse and blockage. In some channels, the siltation is full and cannot be delivered normally. Affect the normal operation of irrigation work. This year, we realized that the safe and smooth channel is an important guarantee for the unit to improve economic efficiency. According to the research of the management department, a thorough dredging was carried out on all the main canals in the Nangan Canal and the irrigation district. Finally, the labor slogan of “Dagan 100 Days” was put forward. During this period, the cadres and workers of each station fought in the dredging without holidays. The first line, all the leaders of the management department and all the comrades of the agency, in the spare time of their work, insist on working collectively for two days at each station every week. In the labor, the leaders lead by example, not afraid of dirty, not afraid of tired and working with everyone at the most In a bitter place, eat at the canal. All the employees of the project work on their own, and the employees have always firmly established the policy of “a hundred years of planning and quality first”, overcoming difficulties such as many points of work and long battle lines, taking cold, rushing time, grasping construction, ensuring quality, and completing dredging of channels ahead of schedule. The maintenance work is based on the spirit of the water conservancy industry of “dedication, responsibility and truth-seeking”. The construction of various projects is completed on schedule. After inspection, the repaired engineering integrity rate reaches 95%, and the unit saves engineering maintenance costs of 300,000 yuan. The capacity of the North Dry Water Transfer is 2.1m3/s, the utilization coefficient is 0.85, the water capacity of the South Dry Water is 3.0m3/s, and the utilization coefficient is 0.76. Ensure that the main canal is safely transported, ensuring the normal operation of industrial and agricultural and urban water supply, providing effective protection for water supply work and laying a solid foundation for generating income for the unit economy. The normal operation of the irrigation facilities is guaranteed. A total of 11 key projects were completed throughout the year, including: 512m3 masonry stone, 320m3 砼, 1XX m3 dredging, 200 m3 of joint surface, 260 m3 of broken stone, and an investment of 800,000 yuan.
Strengthen irrigation management to ensure unit economic income.
Over the years, due to years of persistent dry weather and less rainfall, the reservoir has been seriously deficient in water storage, the land in the irrigation area has not been effectively irrigated, the crops have been reduced, the income of farmers has decreased, and the public has complained that this year’s favorable situation is in the face of this year’s favorable situation. The management department attached great importance and meticulous organization, and completed the winter irrigation work this year. The specific characteristics are as follows: First, start early, mobilize early, and actively carry out winter irrigation propaganda. Since the end of October this year, the effective rainfall in our city has been significantly less, and the temperature is obviously higher than in previous years. The soil moisture content has dropped significantly. The management office seized the opportunity to arrange the deployment of winter irrigation propaganda. First, the winter irrigation propaganda was broadcasted on Hancheng TV station. Yufei subtitles, followed by organizing personnel into the field, adopting oral propaganda and other methods to guide the people to change their concepts, improve the awareness of winter irrigation in the irrigation districts, and clarify the importance of winter irrigation work to increase crop yields and income. Second, it is short-lived, consumes less energy, and safely and efficiently delivers water through channels. The winter irrigation began on December 1, 2019 and ended on December 26, lasting 26 days. During the winter irrigation, the management office adopted various measures to unify the deployment, consolidate responsibilities, clarify responsibilities, strengthen management, and pay attention to water use order and channel safety. Operation, greatly improving the water use coefficient. According to statistics, the utilization factor of the channel in the Nanganshan section of the winter irrigation has increased from 50% to more than 75%. The winter irrigation period is short, the channel utilization coefficient is high, the area of the mu area, and the water fee income are all record highs.
The internal management reform of the unit and the reform of the water management system achieved initial results.
In the past year, we have always placed the internal management of the unit in the first place, and continued to work hard to do the daily management of the unit and the reform of the water system. In light of the actual work done by the Department, we have formulated a series of reform measures. The first is to re-edit the "Xuefeng Reservoir Irrigation District Management Office holiday and purchase and sales management system", and improve the attendance, health and other systems. Second, according to the needs of the work, the departments were set up reasonably, and the functions of each department were separately divided and the responsibilities were clarified. The third is to make reasonable adjustments to the wages and benefits of internally departing and long-term leavers. The fourth is to set up a staff canteen in the government to solve the problem of employees eating on duty. The fifth is to strengthen the management of the grassroots stations and implement the system of fixed posts and attendance, and implement monthly salary calculations in accordance with attendance. Through these measures, the enthusiasm and consciousness of the employees have been greatly mobilized, laying a solid foundation for the further development of the unit. At the same time, we always take the work of creating and maintaining peace and security as an important task of the whole office, and regard the maintenance of stability as the premise of the smooth progress of all work. Therefore, the leadership of the management department attaches great importance to the maintenance of stability and strengthens the work of maintaining stability. The leading group led by the main person in charge and the heads of various departments have a specific division of labor. In accordance with the principle of "who is in charge and who is responsible", we will improve the organization, do a good job in the investigation and mediation of contradictions and disputes, analyze the "hot spots" and "difficulties" of the research units, conscientiously do a good job in the investigation of contradictions and disputes, and lay the foundation for stability. Throughout the year, our office received a total of more than 50 visits from the people and letters, and effectively resolved the contradictions and disputes in the internal and grassroots levels and resolved them in the bud.
The reservoir water source protection work and the environmental management work along the water supply have achieved practical results.
In accordance with the requirements of the municipal government on water source protection work, we concentrated on the comprehensive rectification of the surrounding environment of the reservoir, mainly doing three aspects of work: 1. Establishing a patrol team, insisting on 24-hour patrol inspection every day to prevent amusement. Fishing and other people are polluting the water source; 2. Refreshing the warning signs, comprehensively rectifying the environmental sanitation of the reservoir area, and jointly implementing law enforcement with the Municipal Public Security Bureau, the township government, and the river office to the farmhouse barbecue garden around the upstream of the reservoir. Forcibly dismantled and maintained the drinking water sanitation around the dam; 3. Strengthened the inspection of the reservoir and water supply channels and the anti-terrorism safety precautions. The Xuefeng Reservoir water source pollution prevention plan and water source protection plan were formulated, and the organization and leadership institutions were established to implement responsibility at all levels, strengthen daily monitoring and inspection, and ensure the safety of key parts and key links. There were no incidents of unsafe water pollution during the year.
The project of active capital increase and the construction of various key projects were successfully completed.
1. First, complete the construction tasks of the central government's newly-added agricultural materials to directly replenish the Longting and Xiangshan irrigation districts, complete 124 buildings of various types, and lining channels of 20.2 kilometers with a total investment of 6 million yuan. The second is to complete the water-saving renovation project of the Southwest Reservoir Irrigation District with a total investment of 2 million yuan and complete the channel restoration and reconstruction of 28.5 kilometers. The third is to complete the project of Xuefeng Reservoir's back slope landslide treatment and other investment of 600,000 yuan. The fourth is to complete the dredging maintenance of the dry branch channel for 800,000 yuan. 1 Xuefeng Reservoir South Main Canal dredging maintenance task, completed an investment of 560,000 yuan; 2 completed the Beigou Dam anti-seepage lining reconstruction project investment of 62,000 yuan; 3 completed the Beigan second branch repair project, an investment of 35,000 yuan.
2. Grasping the historical opportunity of the central government to increase investment and expand domestic demand, and actively carry out preliminary work of the project. The three-year plan for water-saving renovation of Xuefeng Reservoir Irrigation District and the construction work plan for the “Twelfth Five-Year Plan”, the “12th Five-Year” water-saving renovation plan for the comprehensive development of agriculture, and the implementation plan for the reinforcement project of the southwest and Zhaojiapo reservoirs were reported.
3. This year, we continue to make the water price adjustment work a breakthrough in the income increase work, and actively contact the municipal price department to complete the preliminary work of the cost audit. At the same time, we determined that the division of labor and cooperation, and actively carry out other income-increasing work, the annual income of 161,000 yuan in addition to water fees, effectively compensated for the lack of water fee income. On the basis of doing a good job of increasing income, we will greatly reduce expenses and streamline meetings, business trips, water and electricity, and office expenses. Through vigorous efforts to increase income and reduce expenditures, the basic payment of employees' wages and the basic operation of the units have been basically guaranteed.
And completed other tasks assigned by the superior.
1. On February 1st, the Water Affairs Bureau held the 2019 annual summary and commendation meeting. Our department won advanced units and advanced collectives for trade union work.
In February and February, the management office of the reservoir area was awarded the title of “civilized unit” by the Municipal Civilization Office.
3. On March 4th, the “March 8th” Games held by the Water Affairs Bureau won the first place in the women's tug-of-war.
4. On March 17, the general branch of our office was appraised by the municipal party committee for “in-depth study and practice of the scientific development concept activities of the advanced party general branch”.
5. On July 2, the Water Affairs Bureau held a summary and commendation meeting to celebrate the 89th anniversary of the founding of the Party.
In May and May, I was rated as an advanced demonstration site for party building work by the municipal party committee and accepted many inspections by relevant departments at higher levels.
Second, specific practices and measures
Grasp learning and unify thinking. Over the past year, we have earnestly done a good job in ideological propaganda and education and political theory study, and strived to improve the overall quality of the cadres and workers. First, since the beginning of this year, in accordance with the arrangements of the Party Committee of the Bureau, we have carried out the spirit of learning xx and the spirit of the Fourth and Fifth Plenary Sessions of the xx, and carried out the activities of the Party Constitution among all Party members. Throughout the year, the organization organizes group learning 50 times a week, receives more than 100 learning materials, organizes 8 sessions of learning experiences, and writes more than 20,000 words of study notes per person. The theoretical level of cadres and workers has been continuously improved, and the smooth progress of various tasks has been vigorously promoted. The second is to vigorously carry out the work of organizing and rectifying the organs. At the beginning of the year, it took seven days to carry out the spring training activities of the organs. Through the development of the activities, it guided all the cadres and workers, and said that they are united, disciplined, transferred to work, imaged, and implemented. The effectiveness has achieved the goal of improving quality, changing style, encouraging morale, and promoting development. It has set a good start for all work in the year and has provided a solid guarantee of ideological discipline. The broad masses of cadres and workers have clearly recognized the situation, strengthened their confidence and courage in overcoming difficulties, and worked hard to overcome difficulties. Through the implementation of these activities and the implementation of measures, the overall quality of party members and cadres has been effectively improved, the management behavior of the units has been further standardized, and the coordinated development of the three civilizations has been promoted.
Grasp the leadership and implement the responsibility. The first is to strengthen the management of learning and education for leading cadres. At the beginning of the year, the leadership and middle-level cadre learning and management work system was formulated. The Party Branch of the Party holds a branch center group study every month. The unit regularly holds a group discussion forum to seriously study the party's line, principles, policies and spirit of water conservancy work conferences at all levels, especially the method of leading and handling the specific work of the unit. And measures have greatly improved the leadership level and theoretical level of cadres at all levels. The second is to adhere to the principle of leadership and arresting people and grasping the working methods of leadership. There are many cadres and workers in our company, and there are many work tips. We insist on the division of labor responsibility system under collective leadership, major issues and decision-making collective research decisions, and the daily division of work is clearly implemented in layers. At the beginning of the year, the head of the unit and the deputy director signed the target responsibility letter. The deputy director and the responsible person of each department station signed by him signed the target responsibility letter, and the responsible persons and comrades of each department signed the target responsibility letter. Specific arrangements for daily work leadership, inspections in half a year, assessments in the middle of the year, and heavy penalties. Thus, the first-level level is grasped, the level is grasped, and the cadres and workers work together to manage the work situation, and the tasks are implemented.
Grasp management and improve efficiency. Over the past year, we have paid close attention to the three managements of internal management, water supply irrigation, and engineering maintenance. In accordance with the actual revision of the “Xuefeng Reservoir Irrigation District Management Office Holiday and Please-Fake Management System”, we have improved various internal management systems. The system of attendance and health has been revised, and the system of sales and sales has been strictly applied. The management of special personnel and the calculation of the monthly salary day have greatly mobilized the enthusiasm and consciousness of the employees. Strictly implement the financial management system of “two lines of revenue and expenditure”, and insist on checking the financial situation of all grassroots teams on the 28th of each month. All the funds of the stations are checked by the financial department of the government, emphasizing the standardization of various bills, and personal communication fees must not be Reimbursement by the unit, water fee income and other income must be handed over to the management office in a timely manner, and no squandering. The implementation of these measures further regulates the financial management of the unit. The second is to pay close attention to economic work. Economic work is the top priority of the management office throughout the year. It is related to the issuance of employee wages and the stability of the unit to ensure the full completion of economic income tasks. At the beginning of the year, according to the specific conditions of each station, the management office issued economic indicators and signed economic contract books. Each station was decomposed into people at various levels, and the rewards and punishments were clearly defined. The third is to strengthen project management. We recognize that the safe and smooth channel is an important guarantee for the unit to improve economic efficiency. 11 key projects of various types were carried out throughout the year, and the project cost was 800,000 yuan. In the construction of various projects, the broad masses of employees have always firmly established the policy of “a hundred years of planning and quality first”, overcoming difficulties such as many points of work, long battle lines, taking cold, rushing time, grasping construction, ensuring quality, and completing the clearing of channels ahead of schedule. The silt repair work sends the water to the field when the farmers in the irrigation area need it most. It is with this spirit of “water conservancy, responsibility, and truth-seeking” that the construction of various projects is completed on schedule, and the hubs and branches of the hubs are kept open and unimpeded at all times, laying a solid foundation for generating income for the unit economy. The fourth is to strengthen irrigation management in the face of this year's favorable situation. This year's winter irrigation work is highly valued and meticulously organized by the management office. During the irrigation period, the staff of the department of the management department will observe the water gauge to ensure the balanced income of the upstream and downstream; overcome the difficulties and stay up all night. Observing the water conditions, the phone is open 24 hours, and the water volume changes are recorded at any time to ensure stable water delivery. The staff of the water distribution room is scientifically dispatched, rationally deployed, and does not miss a call, and does not miss a change in water conditions. The water distribution work is stable and accurate. Water distribution should be stable and cannot be added or subtracted frequently. The amount of water to be distributed must be accurate, as large as the dry branch channel, as small as the bucket channel, saving every drop of water, and resolutely put an end to water waste.
In short, under the correct leadership of the higher authorities in the past year, through the hard work of all the cadres and workers, we have successfully completed all the goals and tasks of the year, and achieved gratifying results, which made the city's economic development and social stability. contribution. The operation of the unit was basically normal, and the work guidelines formulated at the beginning of the year were implemented. The three key tasks of reservoir flood control, industrial and agricultural water supply, and engineering construction were solid and meaningful, and internal management reached a new level, which promoted the smooth development of all work of the unit. .
However, there are still some difficulties and shortcomings in our work. First, the investment is insufficient, the water conservancy engineering facilities are aging and repaired, the benefits are not fully utilized, and the waste is serious. Water source protection and flood control funds are in short supply. Second, due to inadequate maintenance of facilities, the unit income has decreased, resulting in the insurance of employees' pension insurance and medical care failing to be paid on time, and the allowances and various benefits of employees cannot be put in place. Third, the reform of the water management system and the internal management reform of the unit have not yet been fully in place.
In the new year, we will take the spirit of the party's xx spirit and the spirit of the Fourth and Fifth Plenary Sessions of the XXth session as the guide, adhere to emancipate the mind, update concepts, promote the development of water conservancy, adhere to comprehensive planning, comprehensive management, and overall consideration. To ensure the rational use of water resources; adhere to the importance of construction management, earnestly do a good job in the management and utilization of existing projects, highlight the quality control of construction projects, and strive to maximize their effectiveness; further deepen reform, strengthen management, and actively explore new situations. The new system of water conservancy development has taken a new path for the rapid and good development of irrigation district work.
recommended article
- Summary of the work of the teaching office
- Geological technician work summary
- Summary of work of production companies in 2019 and 2019
- Preparatory party members summary throughout the year
- Summary of work on poverty alleviation
- Summary of village-level elections
- Hotel front office work summary
- Sports team semester work summary
- Food and Beverage Restaurant and Kitchen Team Work Summary
- Property Insurance Service Department Peaceful Creation Summary
- Summary of year-end work of boiler operation team
- City Audit Bureau Citizen Moral Construction Month Activity Summary
popular articles
- Honesty and good words
- Praying the mother's famous words
- a good saying that loves labor
- Give the teacher 2019
- Summary of the work of 2019 old cadres
- English four-level composition omnipotent sentence
- English joint test composition omnipotent sentence
- Deng Xiaoping's famous sayings
- Sentences describing mental activities
- Grasp the opportunity
- Latest praise to the teacher
- University Student Union Propaganda Department work summary
- Participle phrase
- Lincoln's famous sayings
- Summary of poverty alleviation work in 2019
- The most sad sentence 2019
- The most common words of Satay
- Modest and famous sayings
- Summary of the work of national unity in towns and towns in 2019
- Summary of the 2019 Winter Conscription Work of the Armed Forces
- Summary of news and publicity work in 2019
- Cherish the time of the famous sayings
- Summary of the work of the teaching and research section in 2019
- Financial Section 2019 Financial Work Summary
- Encouraging words 2019
- Student Union Propaganda Department work summary
- a famous saying of adversity
- Summary of the work of party style and clean government construction in 2019
- Sentence of life
- a famous saying in the face of difficulties