Summary of work of the Water Affairs Bureau in 2019 and work plan for 2019
In XX, under the correct leadership of the county party committee and the county government, the XX County Water Affairs Bureau earnestly studied and publicized and implemented the Party’s xx and xx sessions in the Third and Fourth Plenary Sessions, and thoroughly implemented the scientific development under the care and guidance of the superior water authorities. We will actively implement the sustainable development and water control ideas, focus on the general requirements of “guaranteeing growth, ensuring people's livelihood, and ensuring stability”, and firmly grasp the historical opportunities for the country to expand domestic demand, focusing on solving the problem of highlighting people's livelihood and water resources, and promoting the county's water industry. To achieve leap-forward development as the goal, we will do our best to do a good job in all kinds of wading work, and better accomplish the various work objectives put forward at the beginning of the year, effectively promote the development process of our county's water industry, and develop the county's economy and society smoothly and rapidly. Made the due contribution. The summary is as follows:
I. The completion of water work in XX year The county's hydropower investment in fixed assets has grown steadily.
In XX, the county's planned investment in water conservancy and hydropower construction at the beginning of the year increased by 44.68 compared with last year's water conservancy and hydropower investment plan. It is expected that the investment plan for water conservancy and hydropower construction in XX will be completed on December 30, XX.
The construction of farmland water conservancy has been continuously strengthened.
1. The basic construction of farmland water conservancy in winter and spring has achieved remarkable results. In the winter and spring, the number of workpieces in the farmland water conservancy project was 3,519, and 3,519 projects were completed, with an additional irrigated area of 0.52 million mu, an additional water-saving irrigation area of 0.32 million mu, and a water and soil loss area of 10.5 square kilometers. Kilometers, 269 new small water source projects, with an additional water storage capacity of 65,100 cubic meters, 1.26 million working days, 1.09 million cubic meters of earth and stone excavation, 168,000 people to drink, and 12,500 animals; Investment in farmland water conservancy infrastructure increased by 11.95 over the same period of the previous year.
2. The construction of the “five small” water conservancy projects has achieved remarkable results. In XX, our county increased investment in people's livelihood and water conservancy, and built 191 “five small” water conservancy projects, including 1 small dam pond, 124 small pools, 57 small water kiln and 9 ditches. The newly added irrigated area is 6,450 mu, and the irrigated area is improved by 28,448 mu, which provides a strong guarantee for increasing grain production, increasing farmers' income and developing agricultural and rural economy.
Soil and water conservation work has achieved results.
In XX, the bureau adhered to the principle of “emphasizing key points and giving priority to benefits”. First, it carefully organized the implementation of the comprehensive management project for soil and water conservation in the small watershed of the Celery Pond. As of December 30, XX, it is expected to complete the collection and sorting of the internal and external materials for the comprehensive management of soil and water conservation in the Qinqintang small watershed in ×× County. It is estimated that the area of soil erosion will be 5 square kilometers, including 90.07 hectares of fruit trees and 2.07 of fruit trees. Hectares; 15 reservoirs; 5,000 meters of water pipes; 304.5 hectares of enclosures; 96.7 hectares of soil conservation. It is estimated that the total investment of the project will be 1,226,700 yuan, including: the central government will invest 800,000 yuan, the local support will be 400,000 yuan, and the people will invest a total of 26,700 yuan. The second is to pay close attention to the restoration of governance in the city. To supervise and guide 15 key restoration and control points such as quarry, borrow pit and sand mining yard around the city, and to closely contact and cooperate with relevant units to complete the greening management of 15 governance points around the city within the specified time. The third is to complete the planning of eight projects including water and soil conservation in the small watershed and the comprehensive management of soil and water conservation in the small watershed.
The water law enforcement work has been continuously strengthened.
In XX, the bureau strictly implemented the water administrative licensing system and strengthened law enforcement inspections. As of December 30, XX, the county is expected to have 114 water permit approvals, 15 water and soil conservation plan certificates, 15 river sand mining licenses, and 4 water violation cases, with a completion rate of 100. At the same time, the use of "World Water Day", "China Water Week", the use of art exhibitions, posting slogans, issuing leaflets, conducting television publicity and using propaganda vehicles to the townships, schools, military units, factories and mines, etc. Effectively increased the publicity of water administrative regulations.
Water resources management has been further strengthened.
In XX, the bureau actually increased the management of water resources, carried out a survey of the 17 power stations of 10 enterprises in the county, and has now mastered the basic situation of the power stations that have been built, under construction and planned to be built. The database was established in time; it was approved that the power generation of the hydropower enterprises in the fourth quarter of XX and the first three quarters of XX was 34.012 million kWh, and the water resource fee was 111.25.
In-depth study and practice of the scientific concept of development and "Ideological and Moral, Democratic and Legal System into the Wanjia" activities have achieved remarkable results.
After in-depth study and practice of the scientific development concept, the bureau, under the care of the county party committee and the county government, under the guidance of the fourth guiding inspection team of the county party committee scientific development concept activities, closely focused on the "level of education and scientific development of party members and cadres, With the goal of “learning and practicing the scientific development concept and promoting the sound and rapid development of the water industry”, the goal of “learning and practicing the scientific development concept” is to promote the development of learning and practice activities in a pragmatic and pragmatic manner, and to complete the study and research. , analysis, inspection, rectification and implementation of the three phases of the work. At the same time, taking the opportunity of in-depth study and practice of the Scientific Outlook on Development as an opportunity, we will deeply link the contact points to the democratic village and actively carry out the activities of “Ideological and Moral, Democratic and Legal System into the Ten Thousands”. On the one hand, we listened carefully to the opinions of the people, helped the villagers to solve the problems and difficulties of drinking water and canals, and actively raised funds to build an entertainment activity room for the democratic village. On the one hand, it actively carried out legal publicity and education, went deep into the households of farmers, and explained the relevant laws and regulations to the villagers. Through activities, the cohesiveness and centripetal force of the party and government leading bodies of our bureau have been further enhanced, the work style of cadres and workers has been further transformed, the goal of promoting the scientific development of water science has been further clarified, and the legal concept of democratic villagers and the consciousness of obeying laws and regulations have been further improve.
The reform of the water system has continued to deepen.
In order to continue to consolidate and expand the achievements of the water system reform, we will ensure the steady development of the agricultural and rural economy. According to the reform opinions of the rural small-scale water conservancy project management system in Yunnan Province, it is to solve the problem of fuzzy management rights, lack of main body, aging and disrepair, and benefit reduction in rural small-scale water conservancy projects. The bureau compiled and reported the "Regional Reform Plan for Small-scale Water Conservancy Projects in Rural Areas". Upon approval by the higher authorities, our county held a training meeting on the reform and mobilization of rural small-scale water conservancy project management system on September 29, XX. At present, the investigation of the reform of the rural small-scale water conservancy project management system in the county has basically ended. According to the survey and statistics, there are 7759 small-scale water conservancy projects in the county, with a total construction investment of 192,456,800 yuan; the county has built 10 rural centralized water supply projects. , 1080 rural drinking water projects.
Pay close attention to the construction of spiritual civilization and maintain social security and stability.
Our bureau attaches great importance to the work of spiritual civilization construction, and always regards the work of building spiritual civilization as the top priority to grasp the difficulties, and to do a good job in cadres and workers' political and ideological education as a breakthrough to develop civilized chambers and civilizations. The creation activities of employees and civilized families are the carriers and the creation of spiritual civilization construction is emphasized. The responsibility system for the comprehensive management of social security comprehensive management has been implemented. The units of the same bureau have signed the responsibility book for comprehensive management of public security, vigorously carry out legal education and regular inspection, supervision and implementation of public security prevention and management work for cadres, employees and family members. . Due to the effective measures and effective methods, for a long time, there has been no yellow, gambling or poisoning in our bureau. There are no people and things that violate the law and discipline, and the overall situation is stable and stable.
Party building work has been effective.
Under the correct leadership of the county party committee and the county government, under the care and support of the party committees directly under the county government, earnestly implement the spirit of the party's xx, xx, and 4th plenary sessions, thoroughly study the scientific development concept, and strengthen the party's ability to govern. Constantly promote the building of party style and clean government and anti-corruption work, give full play to the vanguard and exemplary role of party members, actively guide employees to establish a correct world outlook, outlook on life, values and socialist concept of honor and disgrace, and strive to promote political civilization, material civilization and spirit of the water system. The healthy development of civilization. For a long time, there has been no violation of law and discipline in the whole world.
The construction of the four systems was comprehensively established and the work efficiency was further improved.
The bureau attaches great importance to the implementation of the four systems of the Sunshine Government, and regards the implementation of the "Sunshine Government" as the primary political task and strengthens its own construction, transforms the style of the organization, improves administrative efficiency, and promotes the important opportunities for current water work. The implementation of the service commitment system, the first question responsibility system, and the limited time system, opened the 96128 government inquiry line, effectively improved the quality and efficiency of the service for the people, and the office style and image improved significantly. The ability of administration according to law and honest service has been significantly enhanced, and the satisfaction of the people has improved significantly.
Safety production work has been fully implemented.
The bureau attaches great importance to safety production, makes full use of the study time on Tuesday, and carefully organizes cadres and employees to study the "Decisions of the State Council on Further Strengthening Safety Production," "Safe Production Law," "Safe Production License Regulations," and other laws, regulations, and policies. Archives; timely convey the spirit of the safe production work conference held by the whole country, province, city and county, and sign the safety production responsibility book with the bureaus and bureaus, and fully implement the safety production responsibility. At the same time, organize personnel to carry out safety production inspections of various dangerous reservoirs, do a good job in the investigation and treatment of hidden dangers of safety production, and further implement safety production prevention measures to ensure the safe operation of all safety production work of the Bureau.
III. Key work development The flood control and drought relief work has been implemented.
Flood control and drought relief work related to people's livelihood. Our county attaches great importance to the work of flood control, drought relief, and always adheres to the guidance of the party's xx spirit, comprehensively implements the scientific development concept, and strives to implement the idea of sustainable development and water control, paying equal attention to prevention and demobilization, opening up and reducing expenditures, and building management reforms. We will vigorously promote the two transformations of flood control and drought relief, and do our best to prevent floods and droughts.
1. Do your best to do drought relief services. In XX, the county's crops suffered a drought area of 5,1901.5 mu, resulting in a direct economic loss of 720,000 yuan. In view of the drought in our county, the county party committee and the government attach great importance to it, hold a drought-resistance work conference in time, study and deploy drought-resistance work, widely mobilize and organize cadres and people to go all out to fight drought work, and effectively reduce the efforts of the county cadres and the people. The losses caused by the drought have contributed 500,000 yuan to drought and disaster reduction.
2. Do a solid job in flood control and disaster reduction. In order to effectively prevent floods and disasters, the X× County Flood Control and Drought Relief Headquarters specially convened the county flood prevention work conference, further advanced the county flood prevention work conference, arranged the deployment of XX years of flood prevention work, and further implemented the flood control executive head. System, various types of reservoir administrative responsible persons, technically responsible persons and duties, and publicized to the public through television and newspapers. We will comprehensively implement all the work of flood prevention and preparedness, and focus on the center of “prevention of flood prevention and security, development of prosperity”, highlighting the implementation of various measures such as mobilizing deployment, supervising inspection, engineering risk removal, early warning to township, and improvement plan. In XX, the county's public sentiment was relatively stable, no major dangers and disasters occurred, and the effectiveness of flood control and disaster reduction was remarkable.
Reinforcement and construction of dangerous reservoirs.
1. The construction of the Dongbuhe Reservoir reinforcement project has progressed steadily. Since the construction of the Dongpuhe Reservoir Reinforcement Project began on March 25, XX, with the joint efforts of the overall cadres and workers, the company has steadily advanced in accordance with the established work objectives. By the end of December XX, the estimated investment of 13 million yuan will be completed, accounting for 55 of the total estimated investment of 23.67 million yuan. The project plans to fully complete the main project construction task before the end of XX, to ensure safe water storage in June XX.
2. The earthquake damage reservoir emergency treatment and reinforcement work were fully completed. After the “6.3·3” earthquake, 18 reservoirs in the county were damaged to varying degrees. Under the great attention of the central, provincial and municipal governments, the county has 8 earthquakes with serious earthquake damage, Dongpuhe Reservoir, Xiqiaohe Reservoir, and The riverside reservoir, the Celery Pond Reservoir, the Songshan Reservoir, the Xiaohetun Reservoir, the Yiwanshui Reservoir, and the Shumuguo Reservoir have been subjected to emergency treatment and reinforcement. The Dongbuhe Reservoir emergency treatment project passed the provincial completion check and acceptance on February 6, XX; Dahebian Reservoir, Qincaitang Reservoir, Xiqiaohe Reservoir and Xiaoheyu Reservoir passed the city-level completion check and acceptance on July 27, XX; The Songshan Reservoir and the Shuoguyu Reservoir passed the municipal-level completion inspection on November 19, XX; the Yibinshui Reservoir has completed the completion and audit of the project, and the completion of the project is completed at the end of XX.
Rural drinking water safety projects and expansion of domestic demand drinking water projects.
Construction of rural drinking water safety projects. In order to improve the quality of rural water supply, improve rural drinking water conditions, and ensure the safety of rural drinking water. Our county firmly grasps the historic opportunity of the central government to "pull domestic demand and promote growth" and puts the problem of drinking water, which is the most concerned, direct and realistic of the people's people, in the first place. By the end of November XX, 118 safe drinking water projects had been built, 213 large and small pools were built, and 600 km of pipe network was installed. The investment was 5.297 million yuan, including: central government investment of 4.566 million yuan, provincial level of 414,000 yuan, city and grade. The people invested a total of 248,000 yuan. Solve the drinking water safety problems of XX towns, Tongxin Township, Meizi Township, Puyi Township, Mohe Town and Liming Township, 131 village groups, 13,000 people and more than 2,600 large livestock. Among them: XX County XX year, the third batch of rural drinking water safety projects to expand domestic demand, starting construction before September 30, XX. The third batch of rural drinking water safety projects for expanding domestic demand in XX is expected to invest 3.49 million yuan, including: central 2.792 million yuan, provincial level 348,700 yuan, city and county and people self-raised 349,500 yuan, plan to solve × × town, Tongxin Township 8 village committees, 53 villager groups, a total of 6,930 people drinking water safety issues. It plans to build 40 new rural drinking water projects, including 26 centralized water supply projects and 14 decentralized water supply projects; 353km of planned installation and laying pipe network, including: 87km for hot-dip galvanized pipe and 266km for pe pipe. The project completed the project: 72.5 tons of plastic pipes, 201 tons of steel, 310,000 m3 of earthwork excavation, 850 m3 of stonework, 90 m3 of sputum, and a design water supply of 984 m3/day. As of November 30, XX, the accumulated investment was 3.0813 million yuan, of which the central government was 2,485,400 yuan, the local area was 590,900 yuan; the pe pipe purchased 59.98 tons of pipe, the hot-dip galvanized steel pipe purchased 158.27 tons of pipe; the cumulative laying pipeline was 57.9 kilometers, completed The earthwork excavation is 34.037 million m3, the stone excavation is 0.121 million m3, the 砼126.1m3, and the accumulated working days are 0.83 million. 24 centralized water supply projects have been built, 13 distributed water supply projects have been completed, and the daily water supply capacity has reached 0.092 million tons. The beneficiary population reached 0.6475 million. It is expected that the construction of expanding domestic demand drinking water projects will be completed by the end of the year.
The construction of the central small-scale agricultural water project was carried out in a solid manner.
In XX, our county focused on the construction of small farmland water conservancy projects and completed the construction of Dean Yongshun Dagou. The estimated project investment for the project is 3,277,100 yuan, and the project investment is 308,800 yuan, including: central subsidy of 1 million yuan, small farm water supply of 250,000 yuan, integration of flue-water project investment of 1.32 million yuan, and benefit of the people in the beneficiary area to invest 12,500,000 yuan. A discount of 438,800 yuan. Completed the construction of Yongshun Dagou 12.2 kilometers, completed the pipeline laying of 24 hours in the tobacco water irrigation area, and built 5 reservoirs with a capacity of 2300 cubic meters. The newly added irrigated area is 430 mu, the irrigation area is improved to 2800 mu, the irrigation guarantee rate is increased to 80; the irrigation water utilization coefficient is increased to 0.75; the annual water saving is 353,000 cubic meters, and the production capacity of new food crops and economic crops is 590,500 kg, benefiting. The per capita income of farmers is 111.6 yuan. In XX years, in order to effectively accelerate the construction of small-scale farmland water conservancy projects, in accordance with the principle of “unified planning and step-by-step implementation”, combined with the actual situation of our county, we have completed the investment of 12 million yuan in Dehua Township Xinghuo Village and XX Town Democracy Village. The feasibility study report of the ditch supporting project has passed the provincial review.
Expand the construction of rural small hydropower projects for domestic demand.
The ×× County Rural Small Hydropower Project in the fourth batch of XX years expanded the domestic budget central government investment plan of 600,000 yuan to subsidize the construction project of the Yuxianhe II Hydropower Station in the ×× County. The project was funded by XX Weiye Hydropower Co., Ltd., and the project has been completed since the construction started on August 4, XX: the excavation of the water tunnel is 2052 meters and the temporary support work in the cave; the earthwork excavation of the pressure pipe 15290 cubic meters; 21,000 cubic meters of earth and stone excavation in the machine room, 2600 cubic meters of concrete pouring, 110 tons of steel reinforcement, 500 cubic meters of buried stone, 3000 cubic meters of well-tuned wells, 2650 cubic meters of earth and stone, and 170 Cubic meters, 20 tons of steel bars, total investment of 40.6 million yuan, accounting for 49.15 million of the total investment of 82.5972 million yuan. The project is scheduled to be completed in June XX and commissioned for power generation.
The construction of the mountain god tree dam pond was successfully completed.
Shanshenshuba Reservoir is located in the upper reaches of Dongpu River in the jurisdiction area of XX Village, XX Town, XX County. The dam pond design has a runoff area of 1.8 square kilometers, a dam height of 13 meters and a total storage capacity of 60,000 cubic meters. The dam type is a homogeneous earth dam. The total design investment is 1.5777 million yuan. On November 24, XX, Shanshenshu Damu completed the bidding procedure, and officially started construction on November 27, XX. On May 11th, XX, the construction project of Shanshenshu Damang was completed, and the construction of main works such as barrage, spillway and water conveyance culvert was completed. The accumulated backfilled earthwork was 20,350 cubic meters, and the earthwork was excavated with 5,530 cubic meters and dry block stone 410. Cubic meters, 505 cubic meters of masonry stone, 520 cubic meters of rock mass, and 1432.96 square meters of turf slope protection project on July 24. On November 6, XX, the Shanshenshu Damang Project passed the completion acceptance.
The progress of the preliminary work of the construction of the hot spring river reservoir.
In May XX, the Bureau commissioned the Pu'er City Water Resources and Hydropower Survey and Design Institute to complete the "X× County Hot Spring River Reservoir Project Proposal" and entrusted the Yunnan Provincial Hydrology and Water Resources Bureau Pu'er Branch to complete the "X× County Hot Spring River Reservoir Water Resources". The Argument Report, the Procurement of the Hot Spring River Reservoir Project was first reviewed by the Municipal Development and Reform Commission and the Municipal Water Affairs Bureau. On August 1, XX, the Provincial Earthquake Engineering Research Institute was entrusted to complete the submission of the intermediate results of the “X× County Hot Spring River Reservoir Earthquake Safety Evaluation Report”. At the end of October XX, the “X× County Hot Spring River Earthquake Safety Evaluation Report” was completed. The official result is that the seismic fortification intensity of the main buildings in the reservoir project area is vii degrees. At the end of October XX, the revision of the “X× County Hot Spring River Reservoir Project Proposal” and the “×× County Hot Spring River Reservoir Water Resources Argument Report” was completed. It is planned to complete the review work after the revision in November XX, and strive to complete the formal report to the provincial level at the end of December XX.
The preliminary work of the Dahebian Reservoir reinforcement project.
At the end of XX, the Yunnan Water Conservancy and Hydropower Technical Consultation Center reviewed the preliminary design report on the reinforcement of the Dahebian Reservoir. The provincial water conservancy and hydropower survey and design institute, according to the review opinion of the Water Resources and Hydropower Technical Consultation Center, was in XX. In the month of completion, the Supplementary Report on the Drainage Reinforcement of Dahebian Reservoir was completed. On August 22, XX, the Provincial Finance Department Accreditation Center and the Provincial Water Resources Department organized experts to carry out the Supplementary Report on the Drainage Reinforcement Initial Design of Dahebian Reservoir. Investment review. The project is expected to start construction in XX.
The pre-remediation work of the Dongpu River section The remediation of the Dongpu River section has been included in the provincial small and medium-sized river remediation plan, and the report of the various pre-reports is currently underway.
IV. Difficulties and problems in our county Under the great attention of the county party committee and the government, with the strong support of the superior water administrative department, all the work carried out smoothly and achieved certain results, but there are still some inconsistencies. The neglected issues need to be seriously addressed in the future:
First, insufficient investment in water conservancy projects. Our county is rich in water resources and has broad development prospects. Due to the large agricultural population ratio in our county, the per capita net income of farmers is low, coupled with the county-level financial difficulties, financial resources are very limited, the water conservancy construction funding gap is large, and the preliminary work funding is seriously insufficient, resulting in the passive investment opportunities, leading to the county's water conservancy facilities. Construction and water energy development and utilization have formed a clear contrast.
Second, the urban flood control system needs to be strengthened. There are many weak links in urban flood control, less investment, poor overall fortification capability, insufficient investment in governance, and prominent safety hazards in urban flood control.
Third, there is still a certain gap between the reform and development of the grassroots water system and the needs of economic and social development. The reform of the grassroots water system has enabled the grassroots water organizations at the county and township levels to initially establish a management system and operational mechanism that is suitable for modern water development and socialist new rural construction. However, the equipment and support capacity of the grassroots water service team can only basically meet the needs of the work; the water price formation mechanism has not been able to be rationalized, the water price of each township is not unified, the urban water supply is not included in the unified management, and the urban and rural water industrialization and market are realized. The pace of development is slow and cannot meet the requirements of economic and social development for water work.
V. The main points of water work in XX year are aimed at the above problems and difficulties. The next step is to focus on the development ideas of “guaranteeing growth, ensuring people's livelihood and ensuring stability”, focusing on serving “agriculture, rural areas and farmers” and highlighting the construction of people's livelihood and water conservancy. This center, based on the principle of “starting a batch, stocking a batch, and promoting a batch”, has taken effective measures to concentrate manpower, material resources and financial resources, and spare no effort to grasp the reserve, declaration, construction and management of wading projects. We will make every effort to promote the sound and rapid development of our county's water industry, and lay a solid foundation for the full implementation of the "xxx" water conservancy construction goals and tasks and the "12th Five-Year" water conservancy construction plan.
We must go all out to do a good job in the project.
The bureau will go all out to seize the "two major opportunities" and fully implement the implementation of water conservancy projects. First, we must seize the historic opportunity of the country to expand domestic demand and promote economic development. Continuously increase the efforts of the project, further enhance the enthusiasm and initiative of the project, effectively plan and declare the project ahead of schedule, and accelerate the work of project declaration; second, we must seize the rare opportunity to expand the power of the county. . We will comprehensively do a good job in the work of water-related work, actively seek the understanding and support of the provincial water conservancy department and other departments and bureaus on the water work of our county, and effectively increase the policy support of the provincial water conservancy department and relevant departments on the water work of our county. Financial support.
We must continue to deepen the water reform work.
We must persistently do a good job in water reform, further implement the management units and management responsibilities of small and below dams, and further improve the work functions of grassroots water management units; we must work hard to promote the unified management of urban and rural water resources and achieve water resources. Continuous use will promote the sound and rapid development of the county's economy and society; it is necessary to strengthen the training of the talents of the water management units, increase the training intensity, and create a group of composite water cadres who will be managed by the construction society, so that the cadres and workers of the water system will be truly Be a new type of talent with excellent business, high quality, strong political power, hard work and management.
We will earnestly do a good job in all key tasks and ensure the successful completion of all work objectives and tasks.
In XX, the bureau will continue to conscientiously implement the spirit of the Third Plenary Session of the Party's xxth session, thoroughly implement the scientific development concept, closely focus on the economic and social development ideas of our county, take the service of “agriculture, rural areas and farmers” as the starting point, and take the water system reform as an opportunity. We will make every effort to promote the sound and rapid development of the county's water conservancy industry, focusing on the following tasks.
First, we must continue to do a good job in the progress of the Dongbuhe Reservoir reinforcement project to ensure that the project is fully completed by the end of April XX.
Second, we must continue to do a good job in reporting the relevant report of the Hot Spring River Reservoir.
Third, we must continue to do a good job in the construction of the human and animal drinking water safety project in the XX year plan and the expansion of the construction of domestic demand hydropower projects.
Fourth, we must continue to do a good job in flood control and drought relief, implement flood control and drought relief measures, and ensure the safety of life and property of the people of the county.
Fifth, we must continue to do a good job in the construction of the Dahe Reservoir Rehabilitation Project and the construction of the Dongpu River Reconstruction.
Sixth, we must earnestly accelerate the reform of the management system for small-scale water conservancy projects in rural areas, and strive to complete the entire task of reform before the end of XX.
Seventh, we must continue to strengthen our capacity building. Further strengthen the ideological construction, organization construction, work style construction, system construction and anti-corruption construction of the county's water system, which will provide a strong guarantee for the smooth completion of the wading tasks and tasks of the county in XX, ensuring the stable and rapid economic and social development of the county. Guarantee.
I. The completion of water work in XX year The county's hydropower investment in fixed assets has grown steadily.
In XX, the county's planned investment in water conservancy and hydropower construction at the beginning of the year increased by 44.68 compared with last year's water conservancy and hydropower investment plan. It is expected that the investment plan for water conservancy and hydropower construction in XX will be completed on December 30, XX.
The construction of farmland water conservancy has been continuously strengthened.
1. The basic construction of farmland water conservancy in winter and spring has achieved remarkable results. In the winter and spring, the number of workpieces in the farmland water conservancy project was 3,519, and 3,519 projects were completed, with an additional irrigated area of 0.52 million mu, an additional water-saving irrigation area of 0.32 million mu, and a water and soil loss area of 10.5 square kilometers. Kilometers, 269 new small water source projects, with an additional water storage capacity of 65,100 cubic meters, 1.26 million working days, 1.09 million cubic meters of earth and stone excavation, 168,000 people to drink, and 12,500 animals; Investment in farmland water conservancy infrastructure increased by 11.95 over the same period of the previous year.
2. The construction of the “five small” water conservancy projects has achieved remarkable results. In XX, our county increased investment in people's livelihood and water conservancy, and built 191 “five small” water conservancy projects, including 1 small dam pond, 124 small pools, 57 small water kiln and 9 ditches. The newly added irrigated area is 6,450 mu, and the irrigated area is improved by 28,448 mu, which provides a strong guarantee for increasing grain production, increasing farmers' income and developing agricultural and rural economy.
Soil and water conservation work has achieved results.
In XX, the bureau adhered to the principle of “emphasizing key points and giving priority to benefits”. First, it carefully organized the implementation of the comprehensive management project for soil and water conservation in the small watershed of the Celery Pond. As of December 30, XX, it is expected to complete the collection and sorting of the internal and external materials for the comprehensive management of soil and water conservation in the Qinqintang small watershed in ×× County. It is estimated that the area of soil erosion will be 5 square kilometers, including 90.07 hectares of fruit trees and 2.07 of fruit trees. Hectares; 15 reservoirs; 5,000 meters of water pipes; 304.5 hectares of enclosures; 96.7 hectares of soil conservation. It is estimated that the total investment of the project will be 1,226,700 yuan, including: the central government will invest 800,000 yuan, the local support will be 400,000 yuan, and the people will invest a total of 26,700 yuan. The second is to pay close attention to the restoration of governance in the city. To supervise and guide 15 key restoration and control points such as quarry, borrow pit and sand mining yard around the city, and to closely contact and cooperate with relevant units to complete the greening management of 15 governance points around the city within the specified time. The third is to complete the planning of eight projects including water and soil conservation in the small watershed and the comprehensive management of soil and water conservation in the small watershed.
The water law enforcement work has been continuously strengthened.
In XX, the bureau strictly implemented the water administrative licensing system and strengthened law enforcement inspections. As of December 30, XX, the county is expected to have 114 water permit approvals, 15 water and soil conservation plan certificates, 15 river sand mining licenses, and 4 water violation cases, with a completion rate of 100. At the same time, the use of "World Water Day", "China Water Week", the use of art exhibitions, posting slogans, issuing leaflets, conducting television publicity and using propaganda vehicles to the townships, schools, military units, factories and mines, etc. Effectively increased the publicity of water administrative regulations.
Water resources management has been further strengthened.
In XX, the bureau actually increased the management of water resources, carried out a survey of the 17 power stations of 10 enterprises in the county, and has now mastered the basic situation of the power stations that have been built, under construction and planned to be built. The database was established in time; it was approved that the power generation of the hydropower enterprises in the fourth quarter of XX and the first three quarters of XX was 34.012 million kWh, and the water resource fee was 111.25.
In-depth study and practice of the scientific concept of development and "Ideological and Moral, Democratic and Legal System into the Wanjia" activities have achieved remarkable results.
After in-depth study and practice of the scientific development concept, the bureau, under the care of the county party committee and the county government, under the guidance of the fourth guiding inspection team of the county party committee scientific development concept activities, closely focused on the "level of education and scientific development of party members and cadres, With the goal of “learning and practicing the scientific development concept and promoting the sound and rapid development of the water industry”, the goal of “learning and practicing the scientific development concept” is to promote the development of learning and practice activities in a pragmatic and pragmatic manner, and to complete the study and research. , analysis, inspection, rectification and implementation of the three phases of the work. At the same time, taking the opportunity of in-depth study and practice of the Scientific Outlook on Development as an opportunity, we will deeply link the contact points to the democratic village and actively carry out the activities of “Ideological and Moral, Democratic and Legal System into the Ten Thousands”. On the one hand, we listened carefully to the opinions of the people, helped the villagers to solve the problems and difficulties of drinking water and canals, and actively raised funds to build an entertainment activity room for the democratic village. On the one hand, it actively carried out legal publicity and education, went deep into the households of farmers, and explained the relevant laws and regulations to the villagers. Through activities, the cohesiveness and centripetal force of the party and government leading bodies of our bureau have been further enhanced, the work style of cadres and workers has been further transformed, the goal of promoting the scientific development of water science has been further clarified, and the legal concept of democratic villagers and the consciousness of obeying laws and regulations have been further improve.
The reform of the water system has continued to deepen.
In order to continue to consolidate and expand the achievements of the water system reform, we will ensure the steady development of the agricultural and rural economy. According to the reform opinions of the rural small-scale water conservancy project management system in Yunnan Province, it is to solve the problem of fuzzy management rights, lack of main body, aging and disrepair, and benefit reduction in rural small-scale water conservancy projects. The bureau compiled and reported the "Regional Reform Plan for Small-scale Water Conservancy Projects in Rural Areas". Upon approval by the higher authorities, our county held a training meeting on the reform and mobilization of rural small-scale water conservancy project management system on September 29, XX. At present, the investigation of the reform of the rural small-scale water conservancy project management system in the county has basically ended. According to the survey and statistics, there are 7759 small-scale water conservancy projects in the county, with a total construction investment of 192,456,800 yuan; the county has built 10 rural centralized water supply projects. , 1080 rural drinking water projects.
Pay close attention to the construction of spiritual civilization and maintain social security and stability.
Our bureau attaches great importance to the work of spiritual civilization construction, and always regards the work of building spiritual civilization as the top priority to grasp the difficulties, and to do a good job in cadres and workers' political and ideological education as a breakthrough to develop civilized chambers and civilizations. The creation activities of employees and civilized families are the carriers and the creation of spiritual civilization construction is emphasized. The responsibility system for the comprehensive management of social security comprehensive management has been implemented. The units of the same bureau have signed the responsibility book for comprehensive management of public security, vigorously carry out legal education and regular inspection, supervision and implementation of public security prevention and management work for cadres, employees and family members. . Due to the effective measures and effective methods, for a long time, there has been no yellow, gambling or poisoning in our bureau. There are no people and things that violate the law and discipline, and the overall situation is stable and stable.
Party building work has been effective.
Under the correct leadership of the county party committee and the county government, under the care and support of the party committees directly under the county government, earnestly implement the spirit of the party's xx, xx, and 4th plenary sessions, thoroughly study the scientific development concept, and strengthen the party's ability to govern. Constantly promote the building of party style and clean government and anti-corruption work, give full play to the vanguard and exemplary role of party members, actively guide employees to establish a correct world outlook, outlook on life, values and socialist concept of honor and disgrace, and strive to promote political civilization, material civilization and spirit of the water system. The healthy development of civilization. For a long time, there has been no violation of law and discipline in the whole world.
The construction of the four systems was comprehensively established and the work efficiency was further improved.
The bureau attaches great importance to the implementation of the four systems of the Sunshine Government, and regards the implementation of the "Sunshine Government" as the primary political task and strengthens its own construction, transforms the style of the organization, improves administrative efficiency, and promotes the important opportunities for current water work. The implementation of the service commitment system, the first question responsibility system, and the limited time system, opened the 96128 government inquiry line, effectively improved the quality and efficiency of the service for the people, and the office style and image improved significantly. The ability of administration according to law and honest service has been significantly enhanced, and the satisfaction of the people has improved significantly.
Safety production work has been fully implemented.
The bureau attaches great importance to safety production, makes full use of the study time on Tuesday, and carefully organizes cadres and employees to study the "Decisions of the State Council on Further Strengthening Safety Production," "Safe Production Law," "Safe Production License Regulations," and other laws, regulations, and policies. Archives; timely convey the spirit of the safe production work conference held by the whole country, province, city and county, and sign the safety production responsibility book with the bureaus and bureaus, and fully implement the safety production responsibility. At the same time, organize personnel to carry out safety production inspections of various dangerous reservoirs, do a good job in the investigation and treatment of hidden dangers of safety production, and further implement safety production prevention measures to ensure the safe operation of all safety production work of the Bureau.
III. Key work development The flood control and drought relief work has been implemented.
Flood control and drought relief work related to people's livelihood. Our county attaches great importance to the work of flood control, drought relief, and always adheres to the guidance of the party's xx spirit, comprehensively implements the scientific development concept, and strives to implement the idea of sustainable development and water control, paying equal attention to prevention and demobilization, opening up and reducing expenditures, and building management reforms. We will vigorously promote the two transformations of flood control and drought relief, and do our best to prevent floods and droughts.
1. Do your best to do drought relief services. In XX, the county's crops suffered a drought area of 5,1901.5 mu, resulting in a direct economic loss of 720,000 yuan. In view of the drought in our county, the county party committee and the government attach great importance to it, hold a drought-resistance work conference in time, study and deploy drought-resistance work, widely mobilize and organize cadres and people to go all out to fight drought work, and effectively reduce the efforts of the county cadres and the people. The losses caused by the drought have contributed 500,000 yuan to drought and disaster reduction.
2. Do a solid job in flood control and disaster reduction. In order to effectively prevent floods and disasters, the X× County Flood Control and Drought Relief Headquarters specially convened the county flood prevention work conference, further advanced the county flood prevention work conference, arranged the deployment of XX years of flood prevention work, and further implemented the flood control executive head. System, various types of reservoir administrative responsible persons, technically responsible persons and duties, and publicized to the public through television and newspapers. We will comprehensively implement all the work of flood prevention and preparedness, and focus on the center of “prevention of flood prevention and security, development of prosperity”, highlighting the implementation of various measures such as mobilizing deployment, supervising inspection, engineering risk removal, early warning to township, and improvement plan. In XX, the county's public sentiment was relatively stable, no major dangers and disasters occurred, and the effectiveness of flood control and disaster reduction was remarkable.
Reinforcement and construction of dangerous reservoirs.
1. The construction of the Dongbuhe Reservoir reinforcement project has progressed steadily. Since the construction of the Dongpuhe Reservoir Reinforcement Project began on March 25, XX, with the joint efforts of the overall cadres and workers, the company has steadily advanced in accordance with the established work objectives. By the end of December XX, the estimated investment of 13 million yuan will be completed, accounting for 55 of the total estimated investment of 23.67 million yuan. The project plans to fully complete the main project construction task before the end of XX, to ensure safe water storage in June XX.
2. The earthquake damage reservoir emergency treatment and reinforcement work were fully completed. After the “6.3·3” earthquake, 18 reservoirs in the county were damaged to varying degrees. Under the great attention of the central, provincial and municipal governments, the county has 8 earthquakes with serious earthquake damage, Dongpuhe Reservoir, Xiqiaohe Reservoir, and The riverside reservoir, the Celery Pond Reservoir, the Songshan Reservoir, the Xiaohetun Reservoir, the Yiwanshui Reservoir, and the Shumuguo Reservoir have been subjected to emergency treatment and reinforcement. The Dongbuhe Reservoir emergency treatment project passed the provincial completion check and acceptance on February 6, XX; Dahebian Reservoir, Qincaitang Reservoir, Xiqiaohe Reservoir and Xiaoheyu Reservoir passed the city-level completion check and acceptance on July 27, XX; The Songshan Reservoir and the Shuoguyu Reservoir passed the municipal-level completion inspection on November 19, XX; the Yibinshui Reservoir has completed the completion and audit of the project, and the completion of the project is completed at the end of XX.
Rural drinking water safety projects and expansion of domestic demand drinking water projects.
Construction of rural drinking water safety projects. In order to improve the quality of rural water supply, improve rural drinking water conditions, and ensure the safety of rural drinking water. Our county firmly grasps the historic opportunity of the central government to "pull domestic demand and promote growth" and puts the problem of drinking water, which is the most concerned, direct and realistic of the people's people, in the first place. By the end of November XX, 118 safe drinking water projects had been built, 213 large and small pools were built, and 600 km of pipe network was installed. The investment was 5.297 million yuan, including: central government investment of 4.566 million yuan, provincial level of 414,000 yuan, city and grade. The people invested a total of 248,000 yuan. Solve the drinking water safety problems of XX towns, Tongxin Township, Meizi Township, Puyi Township, Mohe Town and Liming Township, 131 village groups, 13,000 people and more than 2,600 large livestock. Among them: XX County XX year, the third batch of rural drinking water safety projects to expand domestic demand, starting construction before September 30, XX. The third batch of rural drinking water safety projects for expanding domestic demand in XX is expected to invest 3.49 million yuan, including: central 2.792 million yuan, provincial level 348,700 yuan, city and county and people self-raised 349,500 yuan, plan to solve × × town, Tongxin Township 8 village committees, 53 villager groups, a total of 6,930 people drinking water safety issues. It plans to build 40 new rural drinking water projects, including 26 centralized water supply projects and 14 decentralized water supply projects; 353km of planned installation and laying pipe network, including: 87km for hot-dip galvanized pipe and 266km for pe pipe. The project completed the project: 72.5 tons of plastic pipes, 201 tons of steel, 310,000 m3 of earthwork excavation, 850 m3 of stonework, 90 m3 of sputum, and a design water supply of 984 m3/day. As of November 30, XX, the accumulated investment was 3.0813 million yuan, of which the central government was 2,485,400 yuan, the local area was 590,900 yuan; the pe pipe purchased 59.98 tons of pipe, the hot-dip galvanized steel pipe purchased 158.27 tons of pipe; the cumulative laying pipeline was 57.9 kilometers, completed The earthwork excavation is 34.037 million m3, the stone excavation is 0.121 million m3, the 砼126.1m3, and the accumulated working days are 0.83 million. 24 centralized water supply projects have been built, 13 distributed water supply projects have been completed, and the daily water supply capacity has reached 0.092 million tons. The beneficiary population reached 0.6475 million. It is expected that the construction of expanding domestic demand drinking water projects will be completed by the end of the year.
The construction of the central small-scale agricultural water project was carried out in a solid manner.
In XX, our county focused on the construction of small farmland water conservancy projects and completed the construction of Dean Yongshun Dagou. The estimated project investment for the project is 3,277,100 yuan, and the project investment is 308,800 yuan, including: central subsidy of 1 million yuan, small farm water supply of 250,000 yuan, integration of flue-water project investment of 1.32 million yuan, and benefit of the people in the beneficiary area to invest 12,500,000 yuan. A discount of 438,800 yuan. Completed the construction of Yongshun Dagou 12.2 kilometers, completed the pipeline laying of 24 hours in the tobacco water irrigation area, and built 5 reservoirs with a capacity of 2300 cubic meters. The newly added irrigated area is 430 mu, the irrigation area is improved to 2800 mu, the irrigation guarantee rate is increased to 80; the irrigation water utilization coefficient is increased to 0.75; the annual water saving is 353,000 cubic meters, and the production capacity of new food crops and economic crops is 590,500 kg, benefiting. The per capita income of farmers is 111.6 yuan. In XX years, in order to effectively accelerate the construction of small-scale farmland water conservancy projects, in accordance with the principle of “unified planning and step-by-step implementation”, combined with the actual situation of our county, we have completed the investment of 12 million yuan in Dehua Township Xinghuo Village and XX Town Democracy Village. The feasibility study report of the ditch supporting project has passed the provincial review.
Expand the construction of rural small hydropower projects for domestic demand.
The ×× County Rural Small Hydropower Project in the fourth batch of XX years expanded the domestic budget central government investment plan of 600,000 yuan to subsidize the construction project of the Yuxianhe II Hydropower Station in the ×× County. The project was funded by XX Weiye Hydropower Co., Ltd., and the project has been completed since the construction started on August 4, XX: the excavation of the water tunnel is 2052 meters and the temporary support work in the cave; the earthwork excavation of the pressure pipe 15290 cubic meters; 21,000 cubic meters of earth and stone excavation in the machine room, 2600 cubic meters of concrete pouring, 110 tons of steel reinforcement, 500 cubic meters of buried stone, 3000 cubic meters of well-tuned wells, 2650 cubic meters of earth and stone, and 170 Cubic meters, 20 tons of steel bars, total investment of 40.6 million yuan, accounting for 49.15 million of the total investment of 82.5972 million yuan. The project is scheduled to be completed in June XX and commissioned for power generation.
The construction of the mountain god tree dam pond was successfully completed.
Shanshenshuba Reservoir is located in the upper reaches of Dongpu River in the jurisdiction area of XX Village, XX Town, XX County. The dam pond design has a runoff area of 1.8 square kilometers, a dam height of 13 meters and a total storage capacity of 60,000 cubic meters. The dam type is a homogeneous earth dam. The total design investment is 1.5777 million yuan. On November 24, XX, Shanshenshu Damu completed the bidding procedure, and officially started construction on November 27, XX. On May 11th, XX, the construction project of Shanshenshu Damang was completed, and the construction of main works such as barrage, spillway and water conveyance culvert was completed. The accumulated backfilled earthwork was 20,350 cubic meters, and the earthwork was excavated with 5,530 cubic meters and dry block stone 410. Cubic meters, 505 cubic meters of masonry stone, 520 cubic meters of rock mass, and 1432.96 square meters of turf slope protection project on July 24. On November 6, XX, the Shanshenshu Damang Project passed the completion acceptance.
The progress of the preliminary work of the construction of the hot spring river reservoir.
In May XX, the Bureau commissioned the Pu'er City Water Resources and Hydropower Survey and Design Institute to complete the "X× County Hot Spring River Reservoir Project Proposal" and entrusted the Yunnan Provincial Hydrology and Water Resources Bureau Pu'er Branch to complete the "X× County Hot Spring River Reservoir Water Resources". The Argument Report, the Procurement of the Hot Spring River Reservoir Project was first reviewed by the Municipal Development and Reform Commission and the Municipal Water Affairs Bureau. On August 1, XX, the Provincial Earthquake Engineering Research Institute was entrusted to complete the submission of the intermediate results of the “X× County Hot Spring River Reservoir Earthquake Safety Evaluation Report”. At the end of October XX, the “X× County Hot Spring River Earthquake Safety Evaluation Report” was completed. The official result is that the seismic fortification intensity of the main buildings in the reservoir project area is vii degrees. At the end of October XX, the revision of the “X× County Hot Spring River Reservoir Project Proposal” and the “×× County Hot Spring River Reservoir Water Resources Argument Report” was completed. It is planned to complete the review work after the revision in November XX, and strive to complete the formal report to the provincial level at the end of December XX.
The preliminary work of the Dahebian Reservoir reinforcement project.
At the end of XX, the Yunnan Water Conservancy and Hydropower Technical Consultation Center reviewed the preliminary design report on the reinforcement of the Dahebian Reservoir. The provincial water conservancy and hydropower survey and design institute, according to the review opinion of the Water Resources and Hydropower Technical Consultation Center, was in XX. In the month of completion, the Supplementary Report on the Drainage Reinforcement of Dahebian Reservoir was completed. On August 22, XX, the Provincial Finance Department Accreditation Center and the Provincial Water Resources Department organized experts to carry out the Supplementary Report on the Drainage Reinforcement Initial Design of Dahebian Reservoir. Investment review. The project is expected to start construction in XX.
The pre-remediation work of the Dongpu River section The remediation of the Dongpu River section has been included in the provincial small and medium-sized river remediation plan, and the report of the various pre-reports is currently underway.
IV. Difficulties and problems in our county Under the great attention of the county party committee and the government, with the strong support of the superior water administrative department, all the work carried out smoothly and achieved certain results, but there are still some inconsistencies. The neglected issues need to be seriously addressed in the future:
First, insufficient investment in water conservancy projects. Our county is rich in water resources and has broad development prospects. Due to the large agricultural population ratio in our county, the per capita net income of farmers is low, coupled with the county-level financial difficulties, financial resources are very limited, the water conservancy construction funding gap is large, and the preliminary work funding is seriously insufficient, resulting in the passive investment opportunities, leading to the county's water conservancy facilities. Construction and water energy development and utilization have formed a clear contrast.
Second, the urban flood control system needs to be strengthened. There are many weak links in urban flood control, less investment, poor overall fortification capability, insufficient investment in governance, and prominent safety hazards in urban flood control.
Third, there is still a certain gap between the reform and development of the grassroots water system and the needs of economic and social development. The reform of the grassroots water system has enabled the grassroots water organizations at the county and township levels to initially establish a management system and operational mechanism that is suitable for modern water development and socialist new rural construction. However, the equipment and support capacity of the grassroots water service team can only basically meet the needs of the work; the water price formation mechanism has not been able to be rationalized, the water price of each township is not unified, the urban water supply is not included in the unified management, and the urban and rural water industrialization and market are realized. The pace of development is slow and cannot meet the requirements of economic and social development for water work.
V. The main points of water work in XX year are aimed at the above problems and difficulties. The next step is to focus on the development ideas of “guaranteeing growth, ensuring people's livelihood and ensuring stability”, focusing on serving “agriculture, rural areas and farmers” and highlighting the construction of people's livelihood and water conservancy. This center, based on the principle of “starting a batch, stocking a batch, and promoting a batch”, has taken effective measures to concentrate manpower, material resources and financial resources, and spare no effort to grasp the reserve, declaration, construction and management of wading projects. We will make every effort to promote the sound and rapid development of our county's water industry, and lay a solid foundation for the full implementation of the "xxx" water conservancy construction goals and tasks and the "12th Five-Year" water conservancy construction plan.
We must go all out to do a good job in the project.
The bureau will go all out to seize the "two major opportunities" and fully implement the implementation of water conservancy projects. First, we must seize the historic opportunity of the country to expand domestic demand and promote economic development. Continuously increase the efforts of the project, further enhance the enthusiasm and initiative of the project, effectively plan and declare the project ahead of schedule, and accelerate the work of project declaration; second, we must seize the rare opportunity to expand the power of the county. . We will comprehensively do a good job in the work of water-related work, actively seek the understanding and support of the provincial water conservancy department and other departments and bureaus on the water work of our county, and effectively increase the policy support of the provincial water conservancy department and relevant departments on the water work of our county. Financial support.
We must continue to deepen the water reform work.
We must persistently do a good job in water reform, further implement the management units and management responsibilities of small and below dams, and further improve the work functions of grassroots water management units; we must work hard to promote the unified management of urban and rural water resources and achieve water resources. Continuous use will promote the sound and rapid development of the county's economy and society; it is necessary to strengthen the training of the talents of the water management units, increase the training intensity, and create a group of composite water cadres who will be managed by the construction society, so that the cadres and workers of the water system will be truly Be a new type of talent with excellent business, high quality, strong political power, hard work and management.
We will earnestly do a good job in all key tasks and ensure the successful completion of all work objectives and tasks.
In XX, the bureau will continue to conscientiously implement the spirit of the Third Plenary Session of the Party's xxth session, thoroughly implement the scientific development concept, closely focus on the economic and social development ideas of our county, take the service of “agriculture, rural areas and farmers” as the starting point, and take the water system reform as an opportunity. We will make every effort to promote the sound and rapid development of the county's water conservancy industry, focusing on the following tasks.
First, we must continue to do a good job in the progress of the Dongbuhe Reservoir reinforcement project to ensure that the project is fully completed by the end of April XX.
Second, we must continue to do a good job in reporting the relevant report of the Hot Spring River Reservoir.
Third, we must continue to do a good job in the construction of the human and animal drinking water safety project in the XX year plan and the expansion of the construction of domestic demand hydropower projects.
Fourth, we must continue to do a good job in flood control and drought relief, implement flood control and drought relief measures, and ensure the safety of life and property of the people of the county.
Fifth, we must continue to do a good job in the construction of the Dahe Reservoir Rehabilitation Project and the construction of the Dongpu River Reconstruction.
Sixth, we must earnestly accelerate the reform of the management system for small-scale water conservancy projects in rural areas, and strive to complete the entire task of reform before the end of XX.
Seventh, we must continue to strengthen our capacity building. Further strengthen the ideological construction, organization construction, work style construction, system construction and anti-corruption construction of the county's water system, which will provide a strong guarantee for the smooth completion of the wading tasks and tasks of the county in XX, ensuring the stable and rapid economic and social development of the county. Guarantee.
recommended article
- Summary of the work of the Finance Bureau in 2019 and work in 2019
- The establishment of the "Youth Civilization" of the hospital emergency department
- Summary of the work of the local tax bureau
- Summary of electrical management work
- The special work of district bribery to manage commercial bribery
- Summary of the propaganda and ideological work of the town in 2019
- Summary of the work of the director of the Academic Affairs Office
- Summary of road bureau maintenance work
- The third batch of study and practice activities in the town
- Summary of the 2019 annual government affairs disclosure work of the Quality Supervision Bureau
- Summary of the work of the Urban Management Bureau in 2019
- Summary of the work of the Planning Bureau in 2019
popular articles
- English four-level composition omnipotent sentence
- a famous saying in the face of difficulties
- Grasp the opportunity
- Summary of the comprehensive management work in 2019
- Summary of discipline inspection and supervision work in 2019
- Summary of personal work of the post office in 2019
- Give the teacher 2019
- Summary of county discipline inspection work in 2019
- English joint test composition omnipotent sentence
- Cherish the time of the famous sayings
- The most sad sentence 2019
- Deng Xiaoping's famous sayings
- 2017 civilized unit creation summary
- Participle phrase
- Lincoln's famous sayings
- a good saying that loves labor
- Encouraging words 2019
- a famous saying of adversity
- Sentences describing mental activities
- Summary of new rural construction work
- Report on the Democratic Life of Party Members in October 2019
- Sentence of life
- Praying the mother's famous words
- Honesty and good words
- Modest and famous sayings
- Summary of the work of the Association for Science and Technology in 2019
- Summary of the Party's Work Style and Clean Government Construction in 2019
- Summary of the work of letters and visits in 2019
- Latest praise to the teacher
- The most common words of Satay