Engineering Department 2019 Summary and 2017 Work Plan
In the coming year of 2019, all the staff of the Engineering Department under the guidance of the company's guidelines, under the leadership of all levels, and with the close cooperation and solidarity with the various departments, successfully completed the tasks assigned by the company's leadership and ensured the ownership of the base. The safe operation of the equipment. Has achieved certain good results and made positive contributions to the completion of the company's overall goals.
I. Work objectives and task completion
1. Maintenance of equipment and facilities: The engineering department will comprehensively understand each system based on the specific conditions and previous work experience. Learn to prevent maintenance, and strive to improve the efficiency of equipment, and extend the service life of equipment and facilities to varying degrees. In-depth understanding and learning maintenance knowledge of strong and weak electricity systems, air conditioning systems, solar energy systems, fire protection systems, water supply, drainage, and systems are planned and systematically carried out.
Second, in the distribution system, in the existing environment, the power distribution room has been cleaned and cleaned for a long time, because the construction unit is ready to go into construction. The base inspection system was carried out on the base-intensive busway, and abnormal phenomena were found. The personnel were promptly organized for repairs; the system line faults were frequently tripped to ensure the normal operation of the base.
Third, in the solar energy system, we have adopted the inspection system of 24 hours and 8 times, including 4 times during the day and night, and found many hidden dangers in time to deal with them. If they can't handle them, they can get in touch with the manufacturers in time to ensure the hot water supply is normal. Adhere to the control box inspection, instrument inspection, line inspection, water pump inspection, equipment inspection every day. Ensure that the unit is operating well without leakage
Fourth, in the central air-conditioning system, because the first-stage pipe network pipeline is dirty and there are many impurities, since the heating on November 15, we cleaned the filter 6 times to ensure the normal operation of the base heating. Adhere to the weekly inspection of the control box, line inspection, equipment room maintenance; regular maintenance and maintenance of the air conditioning heating unit to ensure that the unit is running well without leakage. Strictly control the amount of water used to ensure that the air conditioning water index is within safe limits. Because the construction unit repairs the fan coil on the floor, it releases water every day.
V. Daily maintenance: Since October 2019, a total of more than 800 maintenance and installation work has been completed, including R&D center area maintenance, as well as maintenance center area maintenance, huts, and maintenance of various departments of the company. Received praise and recognition from various departments.
Serve people with the system, so that everyone is based on the interests of the company, and strictly use the system. The management of the item is managed, and the person in charge is responsible for it, the details of the outbound and outbound storage, the signature of the recipient, and the leadership approval, etc., to ensure the utilization of the company's materials. The engineering department set up a rating system to check and summarize the weekly and weekly facilities to make the equipment and facilities more specific, detailed and clean. The engineering department successfully completed the duty system, and the three-shift shift system was implemented in the power distribution room and air-conditioning room. The public maintenance system implemented a normal off-duty system.
VI. Energy Statistics and Energy Saving and Consumption Reduction: Under the guidance of the leaders at the higher level and with the support of the company and the department, the Ministry of Engineering actively adopts various measures to make efforts to improve energy conservation and work well. It is concluded that there are reports on the month and month to enable the leaders to have a full understanding of all energy sources. Better completion of the base public lighting, external lighting adjustment, air conditioning system adjustment, solar system adjustment and so on.
VII. Management of external peacekeeping work: The engineering department closely cooperated with the work of all external peacekeeping units, successfully completed the work of the base, and timely handled the sudden failure of “the air conditioning in the reception center was not heated”; completed the daily maintenance work of the fire-fighting equipment and facilities. Created a good operating environment for the building. The engineering department is closely united and works together to fully cooperate with the construction units, including temporary power units, to complete the understanding of the floor distribution system, fire protection system, water supply and drainage system, and central air conditioning system. Implement management work on each device.
Eight, there are problems, since the opening of the business, all the staff of the engineering department have done their best to do a lot of work for the base, whether it is inside or outside the work can be proactive, but some work is still insufficient, and There is a gap in the company's requirements. In the future work, we will seriously make up for the shortcomings, further improve the ideological quality and individual skills of each employee, and make the greatest contribution to the development of the company.
1 The level of professional skills is still relatively lacking, and the level of one specialization and multi-energy is still not up to standard.
2 In the work process, the uniformity of the standard operation is not strong, and the supervision and inspection work of the peripheral units is not done in detail.
3 The maintenance order is not very standardized, and the writing is not neat,
4 The progress of individual work is lagging behind the delay of the plan, the efficiency of maintenance work and the quality of maintenance need to be improved, and communication with the procurement department needs to be improved.
5 and the work of the various departments is not perfect
Working arrangements for 2019
In response to the above mentioned problems and weak links, the preliminary concept of 2013 maintenance work mainly focuses on “planning, improvement, standardization and implementation”. I plan to do several things. Mainly for the work of 2019 to do a full-year work plan, the monthly progress, the week and week have a busy life, every day has been implemented. According to the needs of the practice of the base, reasonable allocation of personnel, the implementation of the work to the people, responsibility to people, the specific plan is as follows:
Maintenance of equipment and facilities in accordance with annual maintenance plans
2 Check and maintain the load switch of high and low voltage distribution cabinets; test and maintain high and low voltage equipment, high and low voltage power distribution cabinets and transformers.
3 Maintenance of air conditioning heating units and valves. Air conditioning pipes are tested and repaired.
4 pairs of solar heat pump units, auxiliary heating units, valve lines and other maintenance.
5 Inspection and cleaning of the central air conditioning system cooling tower.
6 Complete the work assigned by the company in time.
Second, perfect: According to the company's "fine service standard" policy, the work of the engineering department will be further refined, and the refined service will be implemented to all stages and links of daily work, forming a complete set of services from the engineering maintenance list. Degree of satisfaction.
Strictly standardize and combine the requirements of the standard, further standardize the problems existing in the above work and other aspects of the work, all standards are standard, all aim at the satisfaction of the owners, (including the management of peripheral units, all based on industry standards) There are plans, systems, implementations, inspections, improvements, and related records to each work link.
Third, the implementation of the plan must be put in place, the responsibility to the people, improve the responsibility of our maintenance personnel, supervise the peripheral units must be combined with the timing and irregularities, find problems, solve in a timely manner, and promote the implementation of various rules and regulations Real place.
From the opening of the business to the present, according to the experience of property management, the failure rate of the base equipment will gradually increase significantly, and the accessories of some equipment will have a gradual update process. Therefore, in 2019, the engineering department will develop a more detailed maintenance plan based on 2019 to increase the maintenance of infrastructure equipment and increase the frequency of inspections of key equipment. At the same time, a more reasonable management system will be developed to link the important equipment of the base with the specific responsible persons. There is also the maintenance work for peripheral units, and the engineering department will increase supervision to ensure that the weekly inspection, monthly inspection and annual inspection of equipment can be completed in good quality and quantity. In addition, in the aspect of energy conservation work, the engineering department will continue to save every kilowatt hour and every cubic meter of water, and make our due contribution to “accelerate the construction of a conservation-oriented society and strive to build an energy-saving department”. The company's leaders are encouraged to believe that the property engineering department in 2019 will actively cooperate with the company to make greater efforts to ensure the normal operation of the base, extend the service life of equipment and facilities, and reduce the operating cost of the building!
The above is the work summary of our department in 2019 and the work plan of 2019. If there are any shortcomings, please ask the leaders and colleagues to criticize.
recommended article
- Department year-end summary
- Summary of the year-end work of the store manager
- County, County and Township Highway Management Station 2019 Annual Work
- Summary of the year-end work of the gas plant team
- Company year-end summary essay
- Summary of the work of the first half of the Cultural Broadcasting and Television Bureau
- Review of the work of the town in 2019 and work in 2019
- Summary of 2019 Environmental Monitoring Work and 2019
- 2019, the city's collection and punishment office, comprehensive management of social security
- Hotel guarantees all year-end summary
- Township Armed Forces Year-end Summary
- Year-end work summary of property consultants
popular articles
- English joint test composition omnipotent sentence
- Sentences describing mental activities
- The most common words of Satay
- a famous saying in the face of difficulties
- Praying the mother's famous words
- Year-end summary report
- Participle phrase
- Modest and famous sayings
- Sentence of life
- Summary of the work of state-owned forest farms in 2019
- Summary of the work of the Party Committee in 2019
- Encouraging words 2019
- 2017 workshop director year-end summary
- English four-level composition omnipotent sentence
- Honesty and good words
- The most sad sentence 2019
- Grasp the opportunity
- Give the teacher 2019
- Summary of the work of the 2019 toll station
- Lincoln's famous sayings
- a famous saying of adversity
- Summary of 2019 Ideological and Political Work
- 2012 Party Branch Work Summary
- Summary of Party Committee Work in 2019
- a good saying that loves labor
- Summary of Party Building Work in 2019
- Total migrant population planning work in 2019
- Deng Xiaoping's famous sayings
- Cherish the time of the famous sayings
- Latest praise to the teacher