Summary of urban construction management work in the first quarter
City Construction Bureau:
In the first quarter, under the correct leadership of the Construction Bureau, I adhered to the spirit of the "16th Party Congress" and the important thinking of the "Three Represents" as a guide to seek truth and be pragmatic, work hard, keep pace with the times, and develop and innovate. Relying on the comprehensive and serious work carried out, the work situation in the first quarter is summarized as follows:
I. Municipal engineering construction and management work
1. In the work of voluntary construction, we deployed according to the spirit of the instructions of the municipal party committee and the construction bureau, and regarded the voluntary construction work as a very important task of municipal construction this year. At the beginning of the new year, the leadership team led the relevant personnel of the engineering unit to rush to Ning'an City for a site visit, and brought back the advanced experience and specific practices of Ning'an City in the process of voluntary construction, on the basis of which ××× Urban Road Obligation Co-construction Implementation Plan》.
2. Completed a comprehensive investigation of the main and secondary roads and roadway gravel roads in the town of ×××, totaling 300 pieces and 200,000 square meters.
3. Investigate all the units in the town of ×××, and finally determine that there are 122 units that can afford to work together. In 122 units, there are 24 units in one category and 51 units in the second category. 47 households.
4. Completed the measurement and design work of 6 roads and a radio and television square, and implemented them into 24 households to build these projects, with a total area of 17,652 square meters.
5. Completed the measurement and design work of 150 voluntary sand gravel pavements, and implemented 98 joints of Class II and Class III to undertake the construction of gravel pavement with a total area of 140,983 square meters.
6. Completed the investigation and measurement of the third phase of the West Ring Plaza project with a total area of 3,000 square meters.
7. The XX-XX annual development plan for urban road construction in the town of Bamong Town, XXXX City was introduced.
8. According to the spring terrain floating, the road collapses, and it is easy to cause pedestrians and vehicles to be injured. We conducted a comprehensive survey of the road surface conditions in the town, and investigated a damaged pavement of 1,300 square meters.
Second, street lamp work
1. Street lamp work Since January 1 this year, we have implemented the night patrol duty patrol system. The faults that can be handled during the duty period are handled immediately by the duty officer. The problem can not be dealt with immediately. The duty officer writes the problem to the duty registration. In the book, on the second day, the head of the stock was arranged according to the fault situation in the record.
2, street lamp work in the first quarter of a total of three large-scale maintenance, usually done with the repair, so as to ensure that the street lamp's lighting rate and lighting facilities have reached 95%.
3. For Beisan Road, Xincun Street, Heping Street, Railway Street, Changzheng Road, Overpass, Dongfeng Road, Gongnong Street, Zhanqian Street, Changzheng Bridge, Hongqi Street, Yanhe Road, Xihuan Road, Daqing Road, Xihuan Square Wait for the street to repair the damaged street light 155 盏.
4. West Ring Plaza replaces neon lights by 30 meters.
5. Replace the plastic aluminum wire 400 to extend the meter.
6. Replace 40 ballasts.
7. Replace 40 fuses.
8. Replace 40 electronic triggers.
9. Replace one oil switch.
10. Repair the street lamp short circuit 2 places.
Third, "double service" work
1. In the process of helping to raise cattle, the main leaders at the beginning of the year personally led a group of people to Baofu Village – Xiuchi conducted a site visit. Through investigation and investigation, they mastered 38 households of cattle farmers in Xiuchi Village. There are 133 heads, 70 cows, 54 cows, 20 bulls over 8 months old, 18 bulls, and 760 square meters. They have first-hand information and will help them in the future. The foundation laid.
2. According to the spirit of the municipal government and the municipal government to mobilize the whole society and contribute to the project of “Golden Bulls and Enriching the People”, the leaders immediately convened the staff meeting of the whole department, seriously conveyed the spirit of the municipal party committee and the government, and called on each employee to take care of it. The storage work was completed as a political task, which enabled all employees to raise their ideological understanding of the work of collecting funds. Therefore, on March 18 this year, our office has completed the task of raising cattle for 150,000 yuan, and overfulfilled my work. 115.4% of the storage tasks were well received by the city's cattle raising office.
3. Free investment of 500 yuan to Xiuchi Village to help cattle farmers use for cattle quarantine.
4. Help the bus company solve the problem that the bus must pay the township government during the stay in Hexi Township, further reduce the cost of the bus industry, and rationalize the relationship between the company and the owner.
Fourth, bus work
1. The enterprise restructuring work is proceeding in a substantive direction.
2. The management fee of 10,000 yuan was collected in the first quarter.
3. The issue of reducing the transportation management fee is being further negotiated with relevant departments.
4, strengthen the quality of service, to do with the car side services, guidance, so that the bus to normal operation.
Five, specific practices
1. Using action education to mobilize employees is more convincing.
In the actual work, we have paid close attention to the self-construction of the leadership team. The main leaders used the actual actions of teaching and learning to emphasize the education to influence the surrounding areas and promote the staff. First, in the work of patrolling the street lamps at night this year, Director Yang Fubin often followed the class. Go to the site to operate. Second, in the process of drafting the implementation plan for urban roads in Muling City, due to time constraints, the relevant personnel had to use the evening time to complete, and Director Yang also accompanied him and personally guided and used his own practical actions to directly educate. And mobilized the enthusiasm of the majority of employees.
2. Fully mobilize the enthusiasm of employees and comprehensively promote various tasks.
Due to the heavy task of co-construction this year, all the staff members of our engineering unit have been assigned to work in the office, but when it comes to the work in the office, they also come back in time without complaints, so that both sides can work. The two are correct, and we have come to the conclusion that only by mobilizing the enthusiasm of the employees can we better carry out all aspects of the work.
3. Overcome financial difficulties and take preemptive work.
In the first quarter, due to the slowness of the city government's urban maintenance fees, this period of time is also a period of very shortfalls in our office. In order not to affect the work, we have adopted a method of external credit, first to put some devices, items, etc. In the meantime, it is urgent to deal with the problems that need to be solved in the municipal work, thus ensuring the lighting rate of the street lamps and the integrity of the municipal facilities, meeting the needs of the general public.
Sixth, the existing problems
1. Due to the inability of the city's maintenance fees to be timely, individual work has to be delayed, which seriously restricts the implementation of municipal work before the early work.
2. Due to the limitation of the amount of funds, the damaged road in the town is not repaired in time.
Seven, second quarter work plan
1. Implement the exploration, measurement, design and renovation of the pavement at the southern end of Xincun Street.
2. Dredging and maintenance of culverts and side ditch in the town.
3. Drain the Dongshan gully for dredging, and welcome the arrival of the rainy season to ensure smooth gullies.
4. Repair damaged roads in the town.
5. Implement the technical quality and supervision of the voluntary construction project.
6, in the street lamp management to achieve the following repairs, to ensure that the lighting facilities and the street lamp lighting rate reached 95%.
7. Complete the renewal of the oil switch and air switch of the transformer station of the wood plant, the oil switch and the power distribution room of the Family Planning Commission.
8. Replace the damaged buried cable in the middle section of the West Ring Road.
9. Replace the damaged buried cable in the hospital section of the industrial and agricultural market.
10. Repair the power distribution box controller and timer in the east section of Tuanjie Road.
11. Continue to implement and strengthen the duty work of street lamps.
Eight, future measures
1. With the spirit of the "16th Party Congress" and the important thinking of the "Three Represents" as a guide, firmly establish a sense of innovation that is realistic and pragmatic, work hard, and keep pace with the times, and use limited funds on the cutting edge, with minimal The cost creates a satisfactory benefit.
2, continue to strengthen the team's own construction, to achieve a point to face. In the middle of the workers, they will achieve uniformity and unity, and work hard to create a team of workers who dare to fight hard.
3. The work of street lamps should be carried out in strict accordance with the "Measures for the Management of Street Lamps" and make a commitment to the society.
4. Continue to increase the management of municipal facilities to ensure the integrity of municipal facilities.
We are determined to continue to earnestly sum up experience under the leadership of the Construction Bureau, find the shortcomings, and lay a good solid foundation for the work in the second quarter.
××× City Construction Management Office
recommended article
- Administrative effectiveness of the CPF Management Center in 2019
- Power Supply Company 2012 Work Report
- Summary of the work of the scenic logistics reception service
- Summary of the work of the administrative department
- Summary of the advanced units of the Transportation Bureau
- Summary of administrative work in 2019
- Summary of Enterprise Personnel Administration Work in 2019
- Municipal Development and Reform Bureau, SME Section, 2019, half-year work
- Half-year summary of trade union work
- Summary of the preparation work in 2019
- CPC Hanjiang District Water Supply Management Committee 2019
- Summary of the work of the Human Resources Department in 2019
popular articles
- General affairs logistics work summary
- Summary of the year-end work of the Administration Department
- Summary of the work of the Women's Commission in 2019 and work in 2019
- Summary of agency logistics
- Cherish the time of the famous sayings
- a famous saying of adversity
- Summary of personal work in the administrative office
- The most sad sentence 2019
- Summary of the personal year-end work of the Administration Department
- Encouraging words 2019
- 2017 Kindergarten Logistics Summary
- Give the teacher 2019
- Deng Xiaoping's famous sayings
- Sentences describing mental activities
- English joint test composition omnipotent sentence
- Lincoln's famous sayings
- The most common words of Satay
- Modest and famous sayings
- English four-level composition omnipotent sentence
- Praying the mother's famous words
- a famous saying in the face of difficulties
- Sentence of life
- Summary of logistics staff work
- Logistics work summary essay
- Honesty and good words
- Participle phrase
- Summary of corporate administrative personal work in 2019
- Grasp the opportunity
- Latest praise to the teacher
- a good saying that loves labor