Request for channel improvement project


Qirong Town is a large agricultural town. The construction of water conservancy infrastructure in the town is long and the scale is small. In order to speed up the adjustment of agricultural industrialization structure, we will do a good job in the construction of farmland water conservancy infrastructure in winter and spring, and implement the policy of promoting agriculture by the central, municipal and county governments. To improve the appearance of water infrastructure in the backward town of the town, promote the all-round development of the economy, create greater social and economic benefits, and decide to comprehensively rectify the channel of the cucumber reservoir.
I. Basic information of the channel The total length of the channel of the Cucumber Reservoir is 10.8 kilometers. It is connected to the canal by the Cucurbit Reservoir and the Guideng River. The area of ​​the channel is 0.8m2, the water volume is 0.5m3/s, and the total length of the inverted bridge is 2.1km. Due to the long construction time, the channel has a small amount of water, the facilities are aging, and the leakage is serious. The actual irrigation is 800 mu. In the drought season, the channels often break water, the flash floods, and the channels are often washed away and collapsed.
II. Social and Economic Benefits The cucumber channel runs through the 峨 峨 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居 居And restore 400 mu of farmland irrigated area and implement the land conversion of Guilin, Yurong, Yadong 300 mu of arable land; play a decisive role in the adjustment of the agricultural industrialization structure of the two villages, and lay a good foundation for the construction of high quality orchard base in Yurong Town The foundation, economic and social benefits are significant.
Third, the amount of engineering and project cost
1. To complete the project: earthwork excavation 3240m3, stone excavation 315m3, slurry block stone 1105m3, concrete pouring 2976m3.
2. Since the project belongs to the villagers for self-construction, only the engineering materials fee is calculated. After the completion of the project, a total of 4,739 working days will be required for the project. The earthwork will require 29,700 yuan for excavation and 1025.4 tons of cement and 307,620 yuan. Stone 1237m
3, 30,925 yuan, sand 4,101 m3, 123,030 yuan, construction cost of 491,275 yuan.
IV. Sources of Funds The county agricultural office applied for a project support fund of 450,000 yuan, self-raised funds of 41,275 yuan, and 4,739 people invested in labor.