Fan Wen Daquan > Contract Model > Technical Contract Template

Technical Consultation Contract (3)


Technical consulting contract
Party A: ________
Party B: ________
This contract is signed by the above parties.
The first project name: _______
Article 2 The main obligations of the entrusting party
1. Provide the following background information to the Consultant within ____ days after the effective date of this contract:
__________
2. Pay the consultant a total of _____ yuan; pay in installments. The specific way is as follows _____________
Article 3 The main obligations of the consultant
1. Complete the consultation report or answer the questions raised by the client before the ____ __ day;
2. Ensure that the advisory report meets the following requirements: ________.
Article 4 Confidentiality Clause
During the term of this contract, both parties shall bear the confidentiality obligation for the following technical materials: _____.
Within ____ years after the expiration of this contract, both parties shall bear the confidentiality obligation for the following technical materials: ______.
Article 5 Acceptance criteria and method clauses
The consultation report provided by the consultant is subject to the following criteria: _________.
The specific acceptance method is as follows: __________.
Article 6 The principal's liability for breach of contract
1. If the entrusting party delays providing the technical materials of the contract, or the information provided, if the information has serious defects and affects the speed and quality of the work, it shall pay the remuneration in full and pay the liquidated damages in the amount of _____.
2. If the entrusting party fails to provide or supplement relevant technical information and materials within 2 months, and the consultant is unable to carry out the work, the consultant shall have the right to terminate the contract. The entrusting party shall pay a penalty of ____.
3. If the entrusting party delays payment, the client who pays the liquidated damages of ____ shall not pay the remuneration, and shall return the consulting report and opinions, make up the remuneration, and pay the liquidated damages of _____.
Article 7: The liability of the consultant for breach of contract
1. If the consultant delays submitting the consulting report and opinions, it shall pay a penalty of ____;
2. If the consulting report submitted by the consultant does not meet the conditions stipulated in the contract, it shall be reduced or exempted from remuneration; if the consulting report and opinions are not submitted, or the submitted consulting report and opinions are inferior, if there is no reference value, the remuneration shall be refunded. Liquidated damages for _____;
3. If the consultant does not conduct investigation and demonstration for more than 2 months from the date of receipt of the technical materials and materials submitted by the entrusting party, the entrusting party shall have the right to terminate the contract, and the consultant shall pay a penalty of ____.
Article 8 Dependent Provisions on Technical Achievements
In the process of fulfilling this contract, the consultant uses the technical data and working conditions provided by the entrusting party to complete the new technical achievements, except as otherwise agreed in the contract, which belongs to the consultant; the entrusting party uses the work done by the consultant to complete the new The technical achievements, unless otherwise agreed by the contract, belong to the entrusting party. A party that has ownership (or ownership) of a new technological achievement may enjoy the moral rights (such as the right to receive bonuses, medals, and honor certificates) and economic rights (such as patents and non-patents) obtained in respect of the technological achievements in accordance with the law. Technology transfer rights, use rights, etc.) and other benefits.
Article 9 Implementation Risk Responsibility Clause of the Advisory Report
The entrusting party shall bear the responsibility for the adverse consequences and economic losses arising from the implementation of the qualified inspection report and opinions provided by the consultant.
Article 10: The solution to this contract dispute: ____________.
Article 11 Interpretation of nouns and terms: _________.
This contract shall become effective after it has been signed and sealed by both parties.
The responsible person (or authorized representative) of the consultant (or authorized representative)
Signature: _________ (seal) signature: _______ (seal)
Signing time: _________ Signing time: ________
Signing location: _________ Signing location: ________
Bank of deposit: _________ Bank of deposit: ________
Account number: ___________ account: __________
Consultant guarantor (name): ___ Principal guarantor (name): __
Address: ___________ Address: __________
Person in charge (or authorized representative) (or authorized representative)
Signature: __________ (seal) Signature: _______ (seal)
Signing time: _________ Signing time: ________
Signing location: _________ Signing location: ________
Bank of deposit: _________ Bank of deposit: ________
Account number: ___________ account: __________

recommended article