Party A entrusts Party B to develop the device, and specially negotiates the following contract:
1. Development content: Automatic control and recording of two one-ton fermenters, two five-ton fermenters and two thirty-ton fermenters in the pharmaceutical workshop. Six sets of automatic temperature control devices are installed on a console.
2. skills requirement:
(1) The cooling water is at a temperature ______, the supply air temperature is ______, and the relative humidity of the air is ______. The fermenter is required to be automatically constant at a prescribed temperature throughout the fermentation process, and provides temperature measurement and monitoring.
(2) The console is manually adjusted while being automatically adjusted.
(3) The console is set with a temperature out of control limit alarm device (bell and signal light).
(4) The console is set with temperature automatic recording and temperature digital display as temperature monitoring.
3. Trial production costs:
Party A provides Party B with development funds of ______ million yuan. Party B shall complete the agreement, technical indicators and progress requirements, and Party A shall pay the research award fee of ____ yuan. Party A also agrees to pay a collaboration reward fee of ____ yuan per month in advance, which is ____ yuan two months in advance.
If Party B fails to complete on time, each 7% of the delay will be deducted from the _____% of Party B's project fee.
Party A shall prepay the trial production funds ______% after the agreement takes effect, and the rest will be paid after the project is accepted.
4. Collaboration: ______
During the development process of Party B, Party A sent personnel to participate in joint collaborative experiments. Party A is responsible for providing process and process parameters. After the development of the console, Party B will go to the production site of Party A for commissioning.
5. Trial production progress:
The console was completed at the end of ____, and then went to the production site for commissioning. The total progress was completed in _______.
6. Liability for breach of contract
If Party B fails to perform the contract, Party B shall return the pre-paid trial funds of Party A. Party A shall not perform the contract and shall not recover the pre-paid Party B's trial production funds and compensate Party B for the losses caused thereby.
7. Dispute and method of resolving disputes: _____
8. Both parties have the following confidentiality obligations: _____
9. The results of the development are owned by _____
10. When the development work fails or partially fails due to technical reasons that cannot be overcome, the responsibility shall be borne by the ____ party.