Work report > deeds material

Model deeds around you


Huang Xiaojun, born in May 1981, has a college degree in education and is a member of the Communist Youth League. He is currently the deputy chief engineer of the Hunan Wuyuan Project Department of the Northwest Electric Power Construction Company. Candidate for Technology and Technology Awards.
In the busy and methodical Wuyuan scene, there is always a rushing figure inadvertently greeted. He always rushes to every corner of Wuyuan Power Plant with a strong sense of professionalism, full of enthusiasm and passion. "Diligence, rigor, and truth-seeking" is his work style; "Innovation, efficiency, quick response, advocating action!" is his principle of doing things. He is Huang Xiaojun, deputy chief engineer of the project.
Everyone who knows him knows that since he has been working, he has always been strict with himself. Regardless of his work, he always treats his work with full enthusiasm, diligence, due diligence, and fulfilling his own work in a down-to-earth manner. High standards and strict requirements. At the same time, he also has strong adaptability and adaptability. He often coordinates with various departments such as materials and projects, and can handle the relationship with the owners, supervisors and construction personnel very well. He pays great attention to the work and related work. Work is carried out and summed up. In terms of program optimization and technological innovation, he is striving for excellence and striving for perfection.
As early as the Hancheng project department, his innovative development and the enterprising nature of his position have emerged and he is the practitioner of the company's advanced culture. In the prefabrication project of the cooling tower herringbone of Hancheng No.2 Power Plant, the bubbles and fine cracks on the upper surface of the column were successfully eliminated. The hard support system was applied in the erection of the herringbone column. The cooling tower wall of the company was successfully completed in the wall construction. Application of construction large formwork. In the vertical transportation mode, the linear elevator is used for the first time. Now, the mature technologies of the cooling tower construction are widely used throughout the company. In the construction of the Lueyang Power Plant, the cooling tower project and the chimney project are awarded by the owner. Quality flash point project".
During his time as a technical clerk, he has already reflected in management: the details determine success or failure! Actively promote the extensive application of new processes, casting enamel crafts. In order to reverberate the call for high standards and high starting points proposed by the slightly electric project, we strictly supervised the implementation of technical disclosure. In the construction and production, we always adhere to the idea of ​​“the construction of each project is to make a handicraft”, so as to establish a sense of improving construction quality. The most outstanding performances are: the main plant a row of columns, the bc frame superstructure and the construction of all prefabricated components on site. The sharp outline of the main plant column and the beam and its smooth outer surface mark the goal of clear water concrete. In the early stage of construction of the main structure of the main building, in order to ensure the appearance quality of the column and the beam while taking into account the economy, he used three kinds of reinforcement systems to carry out the experiment: one is the mirror back 5cm×7cm wooden back gear matching mode, channel steel The tie rod is fastened; the second is the 4.8cm×5cm wooden back file on both sides of the mirror panel. The middle φ48 steel pipe back gear is matched with the mold, the channel steel is fastened with the tie rod; the third is the mirror panel outer back-80×5 flat steel, the column angle The ∠50×5 angle steel wrapped steel pipe is fastened. It turns out that all three construction processes have achieved fair-faced concrete, but the third option is better in terms of economic efficiency and construction quality.
In response to the low-cost bid and the shortage of funds in the project, the project department leaders put forward the basic idea of ​​“optimizing the plan and reducing the cost”. Therefore, when writing and reviewing the construction plan, he always be cautious and strive to save every steel pipe and every fastener. And according to the previous construction practices and analysis and accounting to optimize some drawings, especially the design of high standards, such as the blue section of the lower section of the main plant coal bucket has been designed as 12mm thick stainless steel plate, through many times with the design institute and owner supervision communication Changed to 12mm thick ordinary steel plate plus 5mm thick stainless steel inner lining plate, according to the difference between stainless steel plate and ordinary steel plate and the difference between stainless steel welding rod and ordinary welding rod, the total cost saving is about 600,000 yuan; the chimney steel inner tube blueprint has been designed for barrel welding The seam is a first-grade weld, which is now changed to a secondary weld, saving 80% of the total inspection cost. There is also a steel platform for the chimney blueprint design. The steel inner cylinder is pneumatically lifted. It is now hydraulically upgraded and designed with the design institute. The hydraulic lifting platform steel beam is designed as a formal platform, saving a layer of hydraulic lifting load-bearing platform; the original design of the chimney foundation is that the outer cylinder wall and the steel inner cylinder foundation are integrated into separate construction, saving reinforced concrete 1/3 . It has made outstanding contributions to the goal of reducing costs and improving efficiency for the project.
He has a strong sense of professionalism and a high sense of responsibility. He is an example of dedication and selfless dedication. The Wuyuan project department is located in the mountains, away from the noisy and prosperous of the big cities, without the warmth and romance of young people. His hometown is in Nanzhong, Zhengzhou, all year round, except for the Spring Festival, he is working at all times. Over. Whenever the night is quiet, he always combines the characteristics of the project according to the requirements of the first-level network schedule, perfects the engineering and technical management work, makes the work in a tight and orderly manner, and makes the construction legally compliant and has rules to follow. In order to ensure the node, catch up with the progress, complete the construction tasks with quality and quantity, and better serve the site, he organized the youth technical team of the project department to set up a youth commando team and quickly acted. According to the secondary network plan, according to the unfinished construction project, the special project was formulated, and the plan was refined to each day, and the research team was organized, and the teamwork, the rain, and the fog, effectively improved the work efficiency. In order to complete the tasks on schedule, he went out early and late every day, never complained, and worked conscientiously and meticulously.
Since joining the work, he has been rated as "Han II Project Department XX Annual Quality Management Advanced Individual"; "XX Excellent Knowledge Person of the Year". In the face of honor, he is not proud of complacency, still strict with self-discipline and generous to others.
This is him, the standard-bearer of the Wuyuan Youth Technology Group, the guardian of the company's quality and safety objectives, and a technical manager who has done extraordinary work in ordinary positions.

recommended article

popular articles