Land cargo transportation consignment contract
Consignment unit: ___Electrical factory contact: ___ Phone: ____ Address: ___ city ___ road ___
┌────┬────┬──┬──────┬──────┬───────┐
│Cargo Name│Packaging Style│Number of Pieces│Each Volume │ Consignment Total Tonnage │
││││方米)长×阔├──┬───┼───┬───┤
││││×宽│Every piece │The most heavy piece │ Real weight tons │ Vehicle tons │
├────┼────┼──┼──────┼──┼───┼───┼───┤
││││││ │ │ │
└────┴────┴──┴──────┴──┴───┴───┴───┘
Number of vehicles required: 4 tons of vehicles
Need car type: flatbed
Origin: ___路___
Arrival: ___路___
Delivery unit: _____ electrical factory
Receiving unit: _____ motor factory
Ship date: Within four days from the date of shipment
Commissioned notes:
1. Not raining in the rain;
2. Non-dangerous goods;
3. Have their own equipment to load the car;
4. Have their own equipment to unload the vehicle;
5. The delivery unit will be closed on Tuesday;
6. The receiving unit will be closed on Wednesday.
Shipping distance: ____ kilometers. Shipping fee RMB: _____
Liability for breach of contract: If the vehicle is not shipped according to the time specified in the consignment note, the carrier shall compensate the loss at its discretion; during the transportation, the goods shall be lost, shorted or damaged, and the actual loss of the goods shall be compensated. The shipper fails to provide the consignment goods according to the time and requirements stipulated in the consignment note, and shall pay the breach of contract damages actually incurred by the carrier. The shipper shall be liable for damages caused by damage to the packaging defects of the goods, resulting in damage to other goods and means of transport, resulting in personal injury or death.
Attachment: four bills such as settlement documents
Shipper: _____ Electrical Factory
____year month day
Carrier: _____ City Automobile Transportation Company
Salesperson
____year month day
┌────┬────┬──┬──────┬──────┬───────┐
│Cargo Name│Packaging Style│Number of Pieces│Each Volume │ Consignment Total Tonnage │
││││方米)长×阔├──┬───┼───┬───┤
││││×宽│Every piece │The most heavy piece │ Real weight tons │ Vehicle tons │
├────┼────┼──┼──────┼──┼───┼───┼───┤
││││││ │ │ │
└────┴────┴──┴──────┴──┴───┴───┴───┘
Number of vehicles required: 4 tons of vehicles
Need car type: flatbed
Origin: ___路___
Arrival: ___路___
Delivery unit: _____ electrical factory
Receiving unit: _____ motor factory
Ship date: Within four days from the date of shipment
Commissioned notes:
1. Not raining in the rain;
2. Non-dangerous goods;
3. Have their own equipment to load the car;
4. Have their own equipment to unload the vehicle;
5. The delivery unit will be closed on Tuesday;
6. The receiving unit will be closed on Wednesday.
Shipping distance: ____ kilometers. Shipping fee RMB: _____
Liability for breach of contract: If the vehicle is not shipped according to the time specified in the consignment note, the carrier shall compensate the loss at its discretion; during the transportation, the goods shall be lost, shorted or damaged, and the actual loss of the goods shall be compensated. The shipper fails to provide the consignment goods according to the time and requirements stipulated in the consignment note, and shall pay the breach of contract damages actually incurred by the carrier. The shipper shall be liable for damages caused by damage to the packaging defects of the goods, resulting in damage to other goods and means of transport, resulting in personal injury or death.
Attachment: four bills such as settlement documents
Shipper: _____ Electrical Factory
____year month day
Carrier: _____ City Automobile Transportation Company
Salesperson
____year month day
recommended article
- Transport contract (water and land transport)
- Maritime transport contract
- Shipping contract (general 2)
- List of items (2)
- LTL cargo transportation contract
- Transport contract
- Distribution station management contract
- Railway freight transport
- Vehicle transportation contract
- Car freight transportation contract model
- Air cargo export transport agreement
- Engineering earthwork contract model
popular articles
- The sentence that autumn is coming
- Describe the teacher's famous words
- English life motto
- China Civil Aviation Cargo List
- Earthmoving agreement
- Struggling famous words
- Life motivational maxim
- Container trailer transport contract
- The most common words of Satay
- Lin Zexu's famous sayings
- Transport management agreement
- English swear words
- List of items (3)
- Classic love phrase
- Sentence of love
- Famous sayings of war
- Written to girlfriends 2019
- Teacher education maxim
- Verb noun phrase
- Handling contract model
- Express transportation agreement
- The words of the burying people 2019
- Writing to a boyfriend
- Parting words 2019
- The famous saying of Patriotic Daquan
- What makes you feel bad 2019
- Freight waybill (waterway)
- Waterway cargo waybill
- Deaf words 2019
- Courier contract sample