Work Summary > Department Work Summary

Summary of the work of the network department of the Radio and Television Bureau


Now I will report on the work of the operation and maintenance department, the business department, and the suburban station in 2019. I will report it to you here. If there are any deficiencies, please criticize and advise.

I. Brief report on the work of the three departments in 2019 1. All departments strengthened their study, changed their concepts, united and cooperated closely, prepared for the crisis, selected the best plan, and accelerated the pace of urban network construction and transformation. At the beginning of 2010, we organized the departments of operation and maintenance, business, engineering, and suburban stations to systematically and systematically study the "Guiding Opinions on the Construction and Reconstruction of Cable TV Two-way Network" issued by the State Administration of Radio, Film and Television at the end of 11 and various technologies. According to the overall requirements of national informationization and the unified deployment of science and technology development of the State Administration of Radio, Film and Television, from the actual situation, according to local conditions, according to the specific requirements of two-way, interactive and multi-functional development, the advantages and disadvantages of various network transformation programs were analyzed and finally established. On the basis of the cable TV 6 core cable entering the community, the 4 core cable is further extended to the building, the cable is replaced by the optical cable, and the passive optical splitter and the building optical receiver are used instead of the traditional optical receiver plus amplifier to transmit one-way. Analog and digital TV signals, using epon equipment to realize the downlink and return transmission technology of value-added services, as the technical standard for the construction and transformation of cable TV two-way network. In the 11th year of work, under the unified and close cooperation of various departments , the urban network construction and transformation work was carried out in an orderly manner, and the work has made substantial progress. The urban area completed the completion of 15 new communities such as Yongxin Garden. Cable network cable to the building of the building, ** forestry new village and other 20 old cable network with high failure rate to the network transformation of the building. The Engineering Department actively communicated with the Construction Bureau and the developers to build a new residential community pipeline and centralized distribution of the home network, which achieved good results and effectively avoided repeated investment in network transformation in the future. This year, the city opened a new building with 101 optical nodes and 36 suburban stations. The construction of the upgrade project of the 264 core optical cable network in the new area was newly added and completed. Four new optical cable transfer boxes were installed, and the total number of optical cable transfer boxes in the city was 40. The practice in the past year proves that the advantages of network transformation are extremely significant, and the construction cost is much lower than that of the traditional node-type optical receiver + cable + building amplifier mode; the new network has low operating cost, high reliability and performance index, and prevention. The lightning strike performance is good; the network structure is simple, and the fault maintenance amount is greatly reduced. Practiced the test in the Olympic live broadcast party and the 11th Spring Festival Gala. 2. All departments strengthen management, improve and improve various rules and regulations, do a good job in team building, do a good job in various jobs, and actively carry out income-increasing activities. At the beginning of the year, all departments have formulated and improved the safety production system, vehicle use registration system, attendance system, duty system, and material requisition system. Adopt a variety of activities to improve the sense of responsibility and honor of the staff of the department , enhance the collective centripetal force and cohesiveness of the group, fully mobilize the enthusiasm and creativity of all employees, standardize and orderly handle urban network reform, daily maintenance, installation, transfer, reporting, and engineering. The relationship between construction and other aspects has promoted the smooth development of various departments . In the 11th year, the operation and maintenance department and the suburban station inspected and handled more than 3,000 obstacles for cable TV users. A total of 1588 new TV users were installed, 198 households were relocated, 530 households were closed, 510 households were opened, and 1210 branch distributors were replaced. More than 300 sets, more than 120 kilometers of optical cables. Actively carry out income-increasing and expenditure-saving activities, and carry out special-quantity quantitative collection of valuable equipment such as optical receivers, amplifiers, switches, wires, etc., the newly-built network-receiving materials must be marked with the place of use, the repair-receiving materials must be replaced with new ones, and the installation and maintenance materials should be spot-checked. Assessment, repair and repair of damaged equipment and old materials, from January to December, the total number of repair amplifiers was 300, 38 optical receivers, more than 50 switches, more than 900 kilograms of old cables, more than 900 branch distributors, one year It can save nearly RMB 150,000 in material costs for our bureau. Intensified management of materials assessment, attendance and maintenance attendance, quantitative assessment of personnel and work, and economic rewards and punishments, to achieve clear tasks, clear rewards and punishments, effectively improve everyone's work enthusiasm. In order to improve work efficiency and service image, we also integrated the customer service department of the operation and maintenance department and the business department with the toll collectors on the first floor, and achieved good results. During the important broadcast time and the pre-broadcast of the festival, our maintenance personnel must carry out comprehensive safety technical maintenance on the network, and strive to eliminate the trouble in the bud, in order to ensure the safety broadcast during the Beijing Olympics and Paralympics, various departments The maintenance of the fault is carried out on a 24-hour shift. Everyone eats fast food in the office during the middle and dinner. When they are tired, they lie down on the desk and chair. When they receive the fault, they immediately go to the exclusion. Many users praise our team. Faster than 110. During the live broadcast of the 11-year Spring Festival Gala, there was no network failure in one of the three departments. I did not receive a user fault call. This is a phenomenon that has never happened in previous years. I have achieved the best results in the past years and got the users. And the leadership is highly praised. 3. In the development of broadcasting and television broadband business, the business unit further strengthened the cooperation with China Netcom in accordance with the new concept of cooperation and win-win, and achieved good results. China Netcom has high-quality, stable broadband export resources and strong economic strength. Our radio and television network has rich optical cable network resources and good personal connections. The two sides complement each other and complement each other to create a win-win situation. In the 11th year, Netcom has invested nearly 2.6 million yuan, renovated the radio and television broadband core computer room, purchased the front-end network operation-level equipment of the equipment room, and provided broadband equipment covering nearly 6,000 users in 120 community buildings, and assumed all broadband equipment. Damaged maintenance, update, and upgrade costs, 2.5g of Netcom broadband export resources were opened, and broadband business was carried out using the broadband optical cable network. The revenue of the developed broadband services was divided into appropriate proportions. Our idea is to build a nest to attract phoenixes, borrow chickens and lay eggs, and finally achieve the purpose of both eyes. This work has brought new economic growth points to our bureau, and has eliminated our investment risks. It has laid a solid foundation for the opening of digital TV and the development of two-way business. In 2019, with the joint efforts of all employees, with the cooperation of Netcom, the business department also actively cooperated with qualified township stations to jointly develop broadband users, and won a place of broadcasting and broadcasting broadband in the fierce market competition. Up to now, The total number of urban and rural broadband users is nearly 2,600, with a total cost of more than 640,000 yuan. On the basis of the existing broadband network, it is carefully planned and carefully organized to successfully complete the construction project of the urban and rural radio and television part of the provincial emergency video conference command system with minimal cost. We cooperated with China Unicom ** branch to develop a win-win model of Internet value-added services and a series of new technologies, and achieved good social and economic benefits, which was highly praised by the industry. Taking this opportunity, I would like to remind everyone that the entire broadcasting industry is currently facing a dangerous situation. Although in recent years, all the work of the Bureau has been well developed and ushered in new development opportunities, but due to the entire broadcasting and television industry. The industry is facing serious challenges. In terms of one-way broadcasting services, live satellites and terrestrial digital TVs have an alternative relationship to cable TV. Especially when the two are free, cable TV will face life and death. Competition, as far as the interactive business is concerned, the iptv of telecommunications has gradually entered a mature and high-speed development period. With the development and integration of the two businesses, there must be an alternative relationship. In the long run, it is also a competition for survival. As the saying goes, "If people have no long-term concerns, they must have near-worry." We must have a full understanding of the fierce competition for survival. Our network construction must have long-term development plans, and we must have reasonable technical solutions suitable for our local conditions. In the direction of our network transformation, it is necessary to make a two-way transformation of the cable TV network in a timely and reasonable manner, and hope to compete with the telecommunications and other departments , and miss the best opportunity often loses the opportunity. Nowadays, there are many technical solutions on the market, and there are more products. Moreover, any technology has a life cycle. It is unrealistic to choose a product for a lifetime. Therefore, our network construction and transformation cannot be done once and for all. It must be based on the business development needs of each period. Make planning and choices. Therefore, the long-term development planning of the network transformation is of great importance. It is related to the overall survival of the company. It is related to the overall situation of the employees of the nearly 300 employees. I suggest that the Municipal Bureau set up a network transformation leading group to organize the participation of the global technical backbone and hire relevant Experts are technical consultants, learn more, communicate more, argue more, and the long-term solution of network transformation can become more and more clear, and the heart will be brighter, the work will have a sense of direction, and the road underfoot will be more practical.

Second, I will talk about the work plan and concept of the three departments in 2019, hoping to play the role of ignoring the jade, and sincerely hope that all leaders will provide valuable guidance. 1. The 10-year work plan of the operation and maintenance department is as follows: On the basis of the 170 optical nodes that have been opened in the urban area, the network transformation of the fiber-optic building will continue to be promoted according to the central optical node of the cell, and each central optical node will be expanded to 10 building optical nodes, replacing the amplifier with a building optical receiver, with a user standard of about 50 households per optical node, carrying out a comprehensive network transformation for the urban area, planning to invest 2 million yuan in the 11th year, new The opening of 500 building optical nodes will ensure the overall improvement of the quality of cable TV signals in the city, and lay a solid foundation for digital TV and various value-added services. The most important thing is to lay the foundation for the future work of the nearly 300 employees. 2. The 11-year work plan of the suburban station is as follows: increase the transformation of the cable TV transmission trunk line in the suburbs of the suburbs, further promote the fiber-opticization of the cable TV network, gradually carry out the transformation of the cable TV home network, and strengthen the charging of users. Management to ensure that the rate is over 95%. 3. The 11-year work plan of the business department is as follows: seize the opportunity of rapid development of the broadband market, fully utilize the opportunities of urban cable TV network transformation, further strengthen cooperation with the new Unicom branch, and strive for continued investment in the new Unicom branch. With a fund of more than 2.6 million yuan, the Gigabit broadband center computer room will be upgraded and upgraded to a full Gigabit network, and the central computer room will be expanded to meet the needs of more than 20,000 users online, and a broadband device covering 300 sets of optical nodes will be provided. Further expand the coverage of broadband networks, strive to break through more than 4,000 broadband users at the end of the year, and strengthen the development of the group users, and strive for more than 1 million yuan for the bureau in 11 years; further cooperate with the municipal party committee to carry out the construction of new rural broadband networks To take advantage of the network and meet the needs of the peasants' cultural life; to strengthen technical training and strengthen the technical team. In 2019, the project is to hire relevant experts to hold two or more courses on broadcasting and broadcasting broadband business, and at the same time concentrate the township stations to be responsible for broadband installation and maintenance. Technicians learn together and strive to build a skilled technical team.

Leaders, colleagues, in the work of 2008, we still have many shortcomings. Is the 11-year work plan feasible? Please give us more valuable comments so that we can continue to work hard in the future work. Thank you for your contribution to the development of the radio and television industry.

recommended article

popular articles