Work summary > work summary essay

Year-end summary of construction employees


Part 1: Summary of construction personal work

Engaged in the construction industry for many years, they have been engaged in the construction of five parties, accumulated rich experience in the project management of the construction industry, and participated in the systematic theoretical study, the purpose is to do more and better things for this industry, then It is imperative to find the shortest board and find a breakthrough that suits you.

The general content of the duties and responsibilities of the post is maintained, and the atmosphere of the popular atmosphere is maintained. The past is the most superficial, and it is relatively small. Whether it is for the people or for the people, it is necessary to seriously "form" to work.

First, persisting in ideological and political study has continuously improved my ideological and theoretical qualities.

Over the past year, I have paid more attention to studying Deng Xiaoping's theory of building socialism with Chinese characteristics and the various lines, principles, and policies of the party. I have persisted in studying the important thinking of the "three represents," and I have grasped the system of science and technology to "build uprightness and build harmony." The spirit of the first-class theme education, through the purchase of books, Internet access, study abroad and other means to learn a variety of professional and technical knowledge. Through continuous learning and exchanges, the ideological and theoretical qualities of our own have been further improved, and the outlook on life and values ​​that serve the people wholeheartedly have been firmly established. "The people respect each other, respect and morality; people meet and exchange feelings; people get along with each other, heart with people; people believe, believe in sincerity." Among them, "respect for morality" is the most important, embodied in the image, embodied in Being a person and doing things is reflected in striving for top-notch performance. Dedicated and dedicated, professional and ethical quality is the guarantee for the smooth development of each job and the ultimate success. In the past year, I have consciously practiced the above-mentioned purposes in action, and have completed every task with enthusiasm, enthusiasm, seriousness, and meticulousness, strictly abide by various laws, regulations, and various rules and regulations of the unit, adhere to the principle of fairness and justice, and persist in The principle of seeking truth from facts and adhering to the principle of openness and transparency. In daily life, unity and comrades, style and decent, and the elimination of eating and taking cards must wait for violations of law and discipline, consciously resist the erosion of various bad ethos, and win a good reputation at the grassroots level, and the ability to deal with problems is constantly improving.

Second, the hard engineering construction practice has enabled my business skills to grow and my work ability to continue to strengthen.

Along with the favorable opportunity of Shijiazhuang City's three-year change, the budget of the Science and Technology Center building has been adjusted repeatedly, and the scientific and technological content is getting higher and higher. According to the leadership's deployment, the LED lighting demonstration project is specifically planned and implemented.

This project is planned, designed, researched and developed and installed in the interior decoration stage after the completion of the main building. It has absorbed the design and research of four research institutes and cooperated with more than ten units. During the period of going out for more than ten times, he organized brainstorming sessions several times, and contacted a large number of leading figures in the industry, and developed dozens of special lamps and control products. After countless sleepless nights, a certain scale demonstration project was finally formed. After several visits by experts and industry units, the scale of engineering and the level of research and development were at the leading level in China.

Through this practice, the ability to solve practical problems and organizational skills have also been well trained, the style of doing things has been further improved, the understanding of building electrical has been more thorough, and the ideological realm has been further improved.

Due to the tight manpower of the engineering department, I was also responsible for the outdoor pipe network project and community environmental project started this spring. This is the first time that I have been responsible for outdoor projects for the first time. I have designed two units and nearly ten units participated in the construction. Some of them are involved. The theoretical level of unit construction personnel is poor. In response to this situation, there is no need to wait, rely on, and to give full play to the advantages of broad knowledge and strong coordination ability. We will consciously extend the working time. The previous day, the telephone will be implemented on the second day of work, and the on-site guidance will be encrypted. Nuclear and other measures have successfully completed the tasks assigned by the leaders. At the same time, they have experienced the test of heavy rain, realizing the good engineering quality of no water in the rain stop, and introduced high-tech flowers and trees, taking advantage of the advanced technology in the construction of Chun'an Road. And the construction plan is seamlessly connected with the Qilian Street project constructed during the same period, and the outdoor pipe network project is accepted and accepted once by the water supply and drainage department of the development zone. Produced a good reputation in the industry.

The implementation of this project is a comprehensive test of previous knowledge and experience, as well as a testimony to its ability to coordinate and control. It is undoubtedly of great significance for improving its own knowledge structure.

The Beijing Guild Hall project, which was taken over in the fourth quarter, will focus on the water supply and drainage profession and conduct research on air conditioning systems.

Throughout the year, the high-powered professional responsible for the project successfully realized two high-voltage power transmissions, and became more familiar with and mastered the process and key links of the power introduction project. On the basis of the original system design, combined with the ever-changing interior decoration design, dozens of lighting and power plan drawings are one test of endurance and theoretical knowledge. Fortunately, the system is running normally and passes.

Fourth, one point of hard work, one point of harvest, the results are affirmation of all my efforts in the past year.

Through one year of hard work, the achievements are as follows:

1. The main topic of the topic is to introduce a feature article and publish it in a national magazine. We have prepared 3 copies of the project application materials, and we are familiar with and familiar with the relevant procedures for the project declaration, and achieve a personal breakthrough. Have a clear understanding of the development status of the LED industry in Shijiazhuang. .

2. Responsible for strong electricity, weak electricity, outdoor pipe network, community environment, power introduction, landscape lighting, emergency lighting renovation, garage lighting, solar hot water, natural gas introduction, steam introduction, indoor landscape pool design and construction, Beijing Hall total coordination, etc. Part of the project, the highest in history. A person who has done three people's work, used as a two-day day, has no rest days throughout the year, has exerted his personal potential, and brought tangible and intangible benefits to the construction of the center.

3, 3 times out of bid evaluation, evading funds directly wasted 50,000 yuan, praised by Party A.

4. There were no safety and quality accidents during the implementation of the project that I was responsible for.

5. Responsible for security and security work, personally deploying the opening and starting two major activities, the preservation measures are perfect and received favorable comments.

6 Responsible for the design and construction of the centralized solar water heating system, which is now in use and is certainly the best in the province.

7. Assist in the implementation of the solar water heating project of the office building of the bureau and consult the Yishengtang power project.

5. Introspection and self-excitation

The so-called "gold is not barefoot, people are not perfect", while achieving a little achievement, I also have the following shortcomings: First, sometimes the work is not enough, can not let go; second is in Sometimes it seems more urgent when dealing with some things; the third is that the traditional consciousness is heavier, and the communication with the leaders is not timely enough.

In the future work, I will carry forward the achievements, overcome the shortcomings, and work hard in the following directions:

1. There is no end to the mirror, the development of the times is changing rapidly, and the knowledge of various disciplines is changing with each passing day. I will continue to work hard to learn a variety of architectural theory knowledge, and to guide the practice, in order to better grasp the development rules and development trends of architecture, planning, to meet the needs of industry development.

2. Skilled in mastering various professional knowledge and skills. After the completion of the construction phase, carefully carry out the work of settlement, handover, technical training and property management. I will continue to improve my various business skills by taking one step more, taking a look at more, and asking more questions. I will strengthen my experience and summarize some articles to realize the grand ideal of “An De Guangsha”.

3, "Study is good at diligence and absurdity, and it is done in thought and destroyed." Practice is the basis for continuous progress. Through practice, I will continue to exercise my courage and courage to improve my ability to solve practical problems, and gradually overcome irritable emotions in the process of practice, and treat each job actively, enthusiastically and steadily.

In short, just one year is a year of comprehensive development. The year of comprehensive improvement and the year of comprehensive summarization is a year of sensibility to rationality. It is a year of maturity. The year from construction to innovation and transformation. It is also a year in which I am passionate about the cause of architecture and I am willing to give my life to me.


Part 2: Summary of the personal work of civil engineering technicians

I###, male, Han nationality, 30 years old, graduated from Zhengzhou in 2001##### college workers and civil engineering professional, three years in school, general education.

I have participated in the work after graduation. I have been engaged in technical construction in the construction unit, have certain construction experience, and have the confidence to hand over the #楼 project to the owner.

Engineering construction is to transform the designer's thoughts from ideology to physical form according to the design drawings. To do a good job in engineering construction, you must first familiarize yourself with the construction drawings, master the designer's intentions, and complete the design intent from the drawings. The process of drawing, secondly, strengthen the understanding of the drawings, familiar with the basic outline of the project, consider the specific construction plan, preliminarily identify the key points and difficulties of engineering and technical construction, and prepare for the future construction operation.

In the course of engineering construction, measuring the pay-off work is the most important thing. It runs through the entire construction process and is the soul of the construction. If the project is done well, the work of measuring the line must be done well, so the test, proofread, The program of review should not be less; secondly, the construction layer, construction section and construction point should be proofed in combination with the whole set of drawings to avoid missing the small parts of the project; again, it is to check whether the actual operation layer of the project is understood. `Programme#文.库整-理^ is consistent with his own thoughts, finds problems in time to communicate, and eliminates the problem in the bud.

After the completion of construction of a certain engineering section, it is necessary to promptly inspect, check and accept, sum up experience and lessons, and timely correct the problems found in the next construction section to reduce the continuous occurrence of errors.

Engineering construction is a very rigorous work. Engineering and technical personnel must engrave it as a product of their own art, strive for excellence, have a good work style, and be responsible for the country, the society, and the owners. To be a job, you must have the determination to “do a project, build a monument, and win a reputation” so that you can work well and become a qualified engineering and technical personnel.

Engineering construction is a group work. It can be done by one person or several people. It is a complicated task that can be completed by close cooperation with quality inspection stations, design institutes, and labor workers. Therefore, it is especially important to do a good job of mutual cooperation. Otherwise, doing a good job will become an empty talk.

As the saying goes, "The skin does not exist, the hair will be attached." If a migrant worker does not consider the economic benefits of the boss and the company, he is self-defeating. He is not a qualified worker, and will be eliminated by society in the morning and evening. The construction of the project is large, the number of workers is large, and the project needs to achieve a good economic benefit. Material management is very important. However, if the management of materials is only enough by the strength of one person or several people, it needs everyone's Work together to achieve. As a technician, the management of materials should not only consider how to save from a technical point of view, but also coordinate with the project manager and colleagues to effectively monitor the site, so that the workers on site can develop good habits of saving materials and create better products for the company. Economic benefits lay a good foundation for their own development.

The length of the construction period is also an important indicator to reflect the economic benefits of the project. The shortening of the construction period will not only enable the project to be put into operation ahead of schedule, but also create considerable benefits for Party A. It can also reduce the rental fees for many machinery and materials in our construction units and reduce personnel management. The cost of the company is to lower the construction cost and improve the economic efficiency for the company; in this respect, the interests of Party A and our construction unit are unprecedentedly consistent, so the project duration is the focus of everyone's attention. As a member of the project management staff, assist the project. Manager, it is incumbent on everyone to come up with ideas and shorten the project period.

A person's ability and energy are limited. In order to better understand the "programme", the library, the whole process, the drawings and specifications, and the diligent communication, the ex ante request can avoid many unnecessary arguments and rework, and achieve everyone's thoughts. The unification of the project enables the project to meet the project requirements smoothly and on schedule.

Although I am younger, my work experience is not too deep, and my construction experience is limited, I will give full play to the young people's eagerness, diligence, hard work, and energy, to make up for the above shortcomings. An excellent technical talent has done its best for the development of Hongsheng Company.

I like my profession and love my position. I believe that under the guidance of Party A and the Engineering Department, the #楼 project can smoothly carry out the construction and complete the task of completion acceptance according to the requirements of the contract.


Part 3: Personal year-end summary of the construction industry

Quite counted, the company has been in the company for nearly half a year, after the leadership care, the help of colleagues and their own efforts and adjustments, I successfully completed a student-to-business employee transformation, and now has basically integrated into the company's big family. At the same time, it has some preliminary understanding of the company's organizational structure, workflow and other aspects. As the operation personnel of the project department, the following work should be done: monthly statistics of the actual construction output value and cost analysis of the month, timely participation in the cost analysis meeting, analysis and report on the monthly profit and loss of the project department; usually in the work Work in various departments and do a good job in contract management. Participate in the negotiation of some subcontracting contracts, follow up the subcontracting contract after the subcontracting contract is signed; submit relevant reports to the company; do subcontract settlement, project completion settlement; be responsible for bidding calculation, quotation, cost analysis, etc. jobs.

Secondly, I made a summary of the work in the past six months.

First, attitude determines everything. It can be said that the process of working during this time is also the process of constantly adjusting and maturing my own mentality. Because the cost is not my profession, I just came to the company, I have too much sorrow. Reading all day seems to be useless, and the inexplicable cumbersome bidding calculations make me crazy. At first, I even suspected that I was not suitable for the job. Later, I discovered that time is my savior. Through my constant adjustment of my mentality, although no one said it, I naturally know what to do as a cost-maker, and some things that I don’t understand are solved. Let me immediately suddenly see the light. As long as there is work, I will do good things with full enthusiasm. The adjustment of mentality makes me understand that there are opportunities for development and knowledge growth in all positions. If we can do the most ordinary work with full enthusiasm, we can become the most exquisite staff; if we do the noblest work with a cold attitude, it is just a mediocre craftsman. With a positive attitude, you will have a lifetime of success.

Second, learning is endless. Career is only a continuation of student life. It is important to apply the theoretical knowledge of school to work and further improve and sublimate. When I first arrived at the company, my top priority was to study hard and read the books all day long, so that I could get familiar with the work as soon as possible and have the opportunity to get in touch with the practical work. In combination with the relevant knowledge in school, I feel that I need to further explore and think, and learn to use it to solve practical problems.

Third, even the most basic work requires constant innovation and improvement to improve work efficiency. A large part of my work is the bidding work. I thought that the calculation was a relatively boring job. In fact, if you think about it with a little heart, the use of computers and co-ordination methods is not so boring. Since the contact work, I have gradually formed my own unique method. Of course, as the work progresses, there are more new content waiting for me to learn and think.

Of course, I also have some shortcomings: because there are few opportunities to go to the construction site, there are too few opportunities for learning on the ground, and learning is very slow; bidding work often fails, and more exercise opportunities are needed; too much attention is paid to the progress of the work. The comprehensive consideration of the content of the work is insufficient; the work is sometimes not active enough. In the next work, I will do my job well in the work and responsibility of my job.

In addition, I have my own views on the company's current management system. The company should focus on improving the efficiency of employees. I believe that endless work will only make people physically and mentally exhausted, and lose their enthusiasm for work. Naturally, work efficiency will also decrease, and normal holidays will ease the pressure on employees and make them work and rest. I suggest that the project department should also implement large and small weekends. At the same time, I also consider that the project department has certain difficulties in implementing this regulation. Therefore, it is recommended that employees can take turns on duty on weekends, which can better reflect the humanized management of the company's caring employees.

In short, I will use the company's business philosophy as the coordinate, integrate the knowledge I have learned and the specific environment of the company, and use my energetic and accepting ability to study business knowledge and leading technology, and make me as thin as the company's development. Power.

The above is a rough summary of work in the past six months. Please review the leadership. If there is anything, please let the leader point out so that I can correct it in time so that I can work better.


Part 4: Personal year-end summary of the construction industry

In accordance with the overall deployment of the company, the “third branch” was established. This year is the first year of the establishment of the branch. It is a key year for training, internal training and key year. The branch company closely follows the pace of the company's reform, and in accordance with the requirements of the "three benefits", it has carried out various tasks in a down-to-earth manner, which has made the unit's operation, quality production, safe and civilized construction and stability work a good start.

I. Production and operation

In 2005, under the correct leadership of the company, with the support of various functional departments, the branch company emancipated the mind, changed the concept, kept pace with the times, and earnestly completed the various production and operation goals and tasks assigned by the company. Through the efforts of all staff, as of the end of December, the branch company completed a total output value of 150xxxx million, and the new contract amount of 13.xxxx yuan, which has created good economic benefits for the company, and also received favorable comments from customers.

Cost management work

Strengthening project cost management can effectively reduce engineering costs, improve the efficiency of capital use, and enhance the survival competitiveness and profitability of enterprises. The bridge laboratory project is the first project contracted by the branch company, which adopts the mode of dicing contracting. Therefore, in order to complete the contracting indicators set by the company, the branch company has a certain profit, and does not make great efforts to reduce the project cost. It is impossible to achieve the goal by doing everything possible to tap the potential and increase profits. As one of the key points in the management of the project department, cost management mainly focuses on the following aspects: 1. Material cost management

The quality of materials management is directly related to the high and low cost of the project. The project department will pay close attention to material management from the time of entering the market. In accordance with the requirements of the company, we will start with material management and adhere to the market research and inquiry of materials. From the choice of suppliers, to the measurement and acceptance of materials entering the field and the exit of the turnover materials, we have accumulated some experience and accumulated certain resources and established some trustworthy partners. The branch company has established corresponding reward and punishment system for material demand and material use, with clear rewards and punishments, so as to “who will raise materials and who is responsible”. Strengthen the management of materials on-site use, reduce material procurement costs, and reduce waste in material use. .

2. Strengthen schedule management

Under the premise of ensuring quality and safety, compress the construction period as much as possible. The purpose is to reduce project cost expenditures, strengthen on-site management, develop scientific plans, rationally allocate limited resources, and reduce construction waste.

For example, bridge laboratory foundation construction. The project is an independent column and a strip foundation. There is a ground beam between the independent columns of ±0.00. The design is to backfill the soil first and then pour the ground beam, but the strip foundation around the basement cannot be backfilled due to the progress of the basement. If the construction is carried out according to the drawings, the progress of the basement will enter the key process, affecting the structural period of the whole project. . In order to prevent the construction period from being greatly affected, the project department actively negotiated with the design unit and did a lot of work. Finally, the design agreed that the part of the beam could be poured into the formwork before the mold was removed. This makes the total construction period no longer affected by the progress of the basement, which is about xxxx months ahead of time.

3. Optimized construction plan

When formulating a construction plan that has a large impact on project costs, adopt a method of comparing economic and quality comparisons of different programs. Through group discussions, priority is given to construction schemes that guarantee a certain quality requirement, that the scheme is feasible and that the cost is small.

For example, when formulating frame beam and column formwork construction schemes, there are four proposed schemes: (1) all use of wood molds; (2) use of fixed combination steel formwork for columns, use of wooden molds for beams; (3) use of municipal steel formwork, local attachment to ordinary small Steel molds and wood molds; (4) all use ordinary small steel molds. The results of economic and quality comparison analysis of the above four schemes are as follows: the first scheme achieves better quality results. The template needs to be purchased in its entirety. Due to the small beam and column section of the project frame, the remaining template surface is small after the project is completed and cannot be used in future projects. Discussion results: The quality of this program meets the requirements, but the investment in the economy is too large, the template is used once, and there is no residual value. This kind of scheme is not adopted. The second option achieves the best quality results. The shaped composite steel formwork is leased, only the beam wood mold needs to be purchased, and the formwork input is relatively small. However, the fixed-size combined steel mold has a large self-weight, and the tower crane is required for the mold, the mold and the vertical transportation. Discussion results: The quality of this scheme meets the requirements, the template investment is not large, but the cost of large lifting equipment needs to be increased. The scheme is not feasible, and this scheme is not adopted. The third option can meet the quality requirements to a minimum, the municipal steel mold is leased, the wood mold purchase is small, and the investment is small. Discussion results: The quality meets the requirements, the economy is better, the plan is feasible, and the decision is adopted. The fourth option cannot meet the quality requirements, and the small steel mold is leased with minimal investment. Discussion results: Although this program is the most economical, it cannot meet the quality requirements and will not be adopted.

4. Use all available resources according to local conditions

Due to the large mobility of construction, the geographical area and construction environment of each project are different. If the favorable environmental resources are utilized, certain project costs can be reduced.

The favorable environment for the bridge laboratory project is: (1), located in the suburban county. There are a large number of small excavation and transportation machinery in the suburbs. They are characterized by flexible mobility, low price, and no entry and exit expenses. They are suitable for earthwork sub-projects with small amount of earthwork and low requirements for construction period. In this project, we used such machinery in sub-projects such as artificial lakes and backfills, which saved a lot of mechanical costs. (2) This project is in the courtyard of the Highway Test Site of the Ministry of Communications. In the construction, we made full use of the original hardware facilities of the test site: a temporary water for construction. In the past, our temporary water used in municipal construction generally used municipal tap water at a higher cost. In this project, we use tap water in addition to domestic water, and other engineering water uses the existing greening wells in the test site. Since the well water charges are low and the flow is not counted, it is only necessary to pay a small fee at the end of the construction. b Winter office heating is all using heating, we directly access from the test site heating pipe network. In the past, there was heating in the project. We generally use electric heating or set up boiler heating. The cost of input is relatively high, and there are safety hazards. The radiators and pipes used in the office of the project are all formal heating radiators and pipes purchased in advance, and the one-time investment is almost zero. The heating fee charged by the test site is less than 10,000 yuan.

Safety management work

In terms of safety management, the branch company first established and improved the branch company safety assurance system in accordance with the requirements of the company's “Project Management Measures”, and formulated a series of branch company rules and regulations and management plans. Strengthen safety education for branch managers and construction personnel, and focus on instilling the importance of doing a good job of safety, so that all managers are clearly aware that having a safe working environment is a prerequisite and guarantee for doing everything well, and it is also capable of Whether to complete the premise and guarantee of other indicators, the manager's safety awareness has been significantly improved. In the daily safety inspection and management work, the branch company follows the principle of reducing formal work, increasing the substantive work, adhering to the practice of safety management work and construction progress, eliminating illegal command, eliminating illegal operations, and not allowing only surface articles. Instead, it requires down-to-earth, practical solutions to specific problems, and timely detection and elimination of safety hazards, effectively ensuring the safe construction of the project.

During the construction, the branch office insists on safety management as the focus of daily management, and will ensure the safety of employees' lives as the top priority. Frame engineering, support system and border protection are the key points of safety management. To this end, we have strengthened management from the following aspects: 1 Strengthening safety technology. Strengthen the safety awareness of employees through the three-level safety education at the time of entry and the special safety disclosure at the time of employment. 2 Strengthen safety inspections and inspections, identify problems in time, rectify in time, and eliminate potential safety hazards. At the same time, special equipment management was implemented for all equipment on the site. When the equipment enters the market, the branch will conduct a unified inspection and accept it after passing the test. During the construction, the equipment shall be repaired, maintained and inspected regularly, and safety hazards shall be discovered in time to be repaired and replaced in time. During the entire construction period. No major safety accidents occurred, and the general safety accidents were controlled within 1.5‰, ensuring the safety of the employees and meeting the requirements of the expected safe production targets.

Branch management work

In order to enable employees to do things in accordance with the rules; to do things according to the rules; to responsibilities, rights, and interests; to improve work efficiency; to encourage all employees to contribute to the development of the enterprise, to be good entrepreneurs and family members, to improve corporate culture and image Expand the visibility and credibility of the company and make the company develop healthily. According to the status quo, the branch has set up the corresponding organization and a series of rules and regulations.

1. Organization setting

The branch company has set up an organization of “three departments and one room”, including the engineering management department, the operation finance department, the material supply department, and the comprehensive office. Clear division of labor, duties

Engineering Management Department: Responsible for engineering technology, drawings, materials, water supply, heating, electrical, steel, testing, quality, safety, on-site construction guidance and other work.

Business Finance Department: Responsible for project bidding, project budget, final accounts, contract analysis, project quotation, fixed asset accounting, check cash management, office supplies procurement and distribution.

Material Supply Department: Responsible for engineering materials procurement, leasing, storage of warehouse materials, and on-site material storage.

Comprehensive Office: Responsible for office safety and health, company labor discipline, attendance, reception, logistics management vehicle management and other work.

2, various rules and regulations

According to the actual situation of the branch, the branch has formulated a series of rules and regulations. After the implementation, the various systems have been put in place and operated well, which has played a positive role in the smooth development of the branch.

The main rules and regulations are: labor discipline, sales and sales, vehicle management system, office supplies, data file management, fixed asset management, material procurement system, export, warehousing system, check management system, cash management system, logistics management. System, office area safety and health system, dormitory management system, reward and punishment system, etc.

Second, lessons learned

Selection of subcontracting teams

In the selection process of the subcontracting team, the strength of the quotation and subcontracting team is too focused on the quotation, but the strength of the investigation is insufficient, and the complexity of the project is insufficiently considered. The Sichuan strength civil construction team selected this time should have no problem for the construction of high-rise buildings and other ordinary buildings. This project is a relatively complex project with few floors, high floors, large floor space, wide dispersion of unit projects, and a high acceptance test room. The enthusiasm of workers for construction of certain parts is not high, and the required wages are relatively high, resulting in frequent personnel changes within a certain period of time. Sichuan power has lost the ability to deploy personnel to a certain extent, construction workers are scarce, construction The construction period was delayed. This situation did not change until the Sichuan Force gave up the E District, and the Dingzhou team took over.

It is painful to think. In the future, when selecting a labor force, the first thing to do is to check whether it is a self-contained team, whether it has its own stable construction personnel, and then consider the quotation. A labor force with strong strength, even if the quotation is higher than other teams at the beginning, but because of his strong strength and abundant staff, the construction period may be much advanced, which can save the project's rental expenses, management expenses, water and electricity expenses and other expenses. . In this way, it is possible to use such a team to increase the revenue of the project.

Subcontract team management

In the management of subcontracting teams, due to the lack of mature experience and the rush of the project, the preparatory work in the early stage is not enough, and there is a phenomenon in the signing of the labor contract. In addition, the terms of the labor contract in some aspects are not considered to be very comprehensive and not very detailed, which brings trouble to related work in the future.

When the construction team was replaced in Area E, it was not considered in terms of team handover. Although the project has been completed for the Sichuan team

Tomb こ 拷 辛 辛 晗 晗 晗 暮怂悖 暮怂悖 (15)? The party signed the agreement. However, for the materials originally used by the Sichuan team, there was no feasible plan at the time of handover, which left trouble for the future settlement with the construction teams.

Budget, accounting work

The budget and accounting staff are inaccurate and not timely, and cannot be given to the project.

The policy layer and related departments provide timely, effective and accurate information. For example, the procurement of bulk materials, and the negotiation and selection of major subcontractors and sub-suppliers require detailed and accurate engineering information. Only in this way can we take the initiative in the process of negotiation.

Management of external personnel

The existing staff of the branch office is 1xxxx, among which the external staff xxxx accounts for 5xxxx. Can the full mobilization of the external staff be fully motivated, give full play to their experience and expertise, and enable them to do their best to play a key role in whether the branch's work can be carried out normally? Sexual effect.

To this end, the branch regards the management of external personnel as the focus of personnel management. First of all, according to the importance of the position, the expected salary, and the individual ability, the branch negotiates the salary of each post with each of the external personnel. For those who intend to hire, the branch should try to meet their salary requirements within a reasonable range. Secondly, in daily work, branch leaders often talk to outsiders to understand their ideas and discover their thoughts in a timely manner. Communicate with them and solve the problems of life as much as possible to eliminate their worries. Thirdly, in order to motivate the enthusiasm of the external staff, the branch has established a corresponding reward system: after the employees have made reasonable suggestions for the project to be adopted; the employees rescued and remedy the damages in the emergency, and the branches are all Will be rewarded accordingly.

Although the branch has done a lot of work, there is still room for improvement in the management of external personnel. Now the salary of the external staff is dead wages, there is no monthly bonus, year-end award, and their work enthusiasm has not been fully stimulated. In the future, a bonus system should be introduced, and the monthly work of external staff should be evaluated, and the method of linking bonuses and evaluations should be implemented to further enhance their enthusiasm.

Third, the staff's ideological education and spiritual civilization construction

Since the establishment of the branch, the branch has always regarded the ideological education of employees as a key point, attaches importance to the construction of spiritual civilization, and actively carries out ideological education for employees. Adhere to the "people-oriented" and create a cultural atmosphere of strong talents.

In 2005, while vigorously introducing talents, we will build the capacity-oriented, performance-oriented, and achievement-oriented mechanisms for talents, retain good talents, and discover talents with capabilities, potential, and quality within the company. , reused. Focusing on talent development, we have focused on "reasons" and "staying talents".

According to the situation of young people in the branch, we have formed an atmosphere of caring for youth progress, encouraging young talents, and supporting young people to do business within the branch. We will focus on cultivating management and management talents, professional and technical talents, and compound and applicable talents. We will do a good job in building young talents; in light of the characteristics of high-level knowledge, superior growth environment, individuality, less concern in work and life, and courage to take pressure, we will develop a variety of competitive management and incentive mechanisms based on guidance. Retaining young talents and giving full play to the talents of young talents.

4. Work plan for 2006, management ideas and internal construction planning

In 2006, while we are doing a good job in project safety and quality work, we will further focus on business management as the core work of project management. We must deepen management and implement the project contracting system to enhance the market development capability of the enterprise, and work hard to improve the quality of economic operations and focus on building core competitiveness. Combining the experience and lessons we have accumulated this year, in 2006 we will focus on the following aspects:

Talent building

The construction of a talented highland is a systematic project. Attracting talents, using talents, and retaining talents, interlocking, which link can not be ignored, can not be taken lightly. In the final analysis, the competition of enterprises is the competition of talents; the competition among talents is also the competition of talent management systems and models. Therefore, in 2006, we will focus on creating a benign soft environment, triggering the development of talent potential, and using all aspects of strength to build a harmonious, enterprising, equal, and stable working environment.

1. Accelerate the training of talents and accelerate the introduction, cultivation and use of high-tech talents. Taking the engineering project as the stage, we will speed up the training of young talents and let them work on the first line of construction.

2. Finding talents and cultivating talents from existing personnel is one of the most important sources of talent acquisition. The focus of cultivating talents is how to train young people into talents that can adapt to the development of enterprises and accomplish their mission. Training should not only focus on professional skills education but also on quality education. On the other hand, the young talents to be trained should be “loaded”. The department should arrange the work according to the specific conditions of the young talents, so that they can integrate the learned knowledge into their own skills and become bold in their key positions. Use to stimulate its potential.

3. Advocating the work form of “unity, enlightenment, mutual assistance and improvement” and creating a harmonious working atmosphere is one of the key links to retain talents. We must not only do ideological work for the stable work of young people, but also emphasize the backbone of the business. The work style and leadership methods of grassroots leaders, through the "teaching technology, talking and making friends" with young people, to build a stage for the young people to become talented. Create a combative project management team. Adhere to the people-oriented, do a good job in training young people, and build a reasonable talent ladder.

4. Do a good job in the construction of the management mechanism of the project department, so that the project management is institutionalized and standardized. Improve the awareness of cost management, study the method of cost tapping potential, improve the scientific and technological content of management work, and benefit from management and benefit from technology. Improve the performance appraisal system for managers, and achieve more work and more rewards.

5. Implement an honor incentive system and vigorously select outstanding models. The branch office will set up a series of commendation activities to encourage employees to be enterprising and respectful, and let the employees learn the advanced models around them, and set off the competition climax of comparison, learning, rush, help and super. In the various activities to create excellence, we will focus on the young talents and inspire them to be high-spirited.

Business development

Business development work is a rather complicated task, and it is difficult to argue whether it is true or false.

If the fish are in a mixed situation, if you are not careful, you will go astray and make your work passive. All projects must adopt risk-avoiding measures before operation, and conduct detailed investigation, understanding and screening of projects and cooperation personnel. To undertake a project, not only must it have economic benefits, but also have social benefits.

1. Adhere to the attitude of seeking truth and being pragmatic, analyze the market calmly, and determine the strength of the enterprise and its position in the market. Further pay close attention to market dynamics, carefully analyze market trends, and focus more on projects with strong financial strength, good return capability, large social impact, and high profits, according to market demand. Through timely transformation of the business structure, fully tap the market potential, steadily speed up the operation of the branch, accelerate development and do a solid job.

2. Deepen the awareness of all employees and vigorously promote business ideas. All employees understand that the management work is not only the work of individual departments and individual personnel, but the work of bidding for bidding, but the task of all employees, and the task of doing every job. Achieve a full-service model, give full play to the enthusiasm of each employee of the company, and enhance the overall strength of the branch in the market competition. Adhere to the integrity of management, relying on quality products, quality services to win the market, win credibility and win benefits. Adhere to empathy, ensure the quality of the project, provide satisfactory services to the owners, strengthen the management awareness of the construction workers “each project is a new starting point”, develop and increase the amount of follow-up tasks, and truly do one The project set up a monument to make friends and get a new batch of business information.

3. Use all available relationships and channels in the society to further expand and expand the market. Adhere to the use of all available conditions, vigorously promote the company's overall strengths and comprehensive strength, open information channels, and expand the amount of information reserves. Including the foreigners and foreign personnel, the formation of a branch of the peripheral business team, in order to expand the company's influence and information channels, form a fixed business channel, and strive to adjust the ratio of the task to the dominant position, in While increasing market share, improve the economic efficiency of enterprises.

Project management innovation, implementation of fine accounting

First, we must innovate the project evaluation system and improve the project management system. The project responsibility indicators are refined into progress, safety, civilized construction, material management, labor management, technology, quality, cost, settlement management, etc., and are decomposed and implemented in each position to standardize the various positions of the project. The scope of rights and responsibilities. Abandon the original “post-calculation” passive project cost management method, focusing on strengthening the actual cost control. Do a good job in basic work, strengthen the daily management of the project, establish an early warning mechanism for cost assessment, and ensure that the project contract responsibility system is implemented.

Second, we must promote the construction of "integrity" projects, aim at a win-win situation, and do a good job in the overall construction of the project. Faced with the status quo of most construction projects with “multi-work, high-risk, fast-changing, strict quality, short-term construction and low-cost”, we must change our concepts, raise our understanding, and deeply understand and understand the concept that construction enterprises belong to the service industry. Take good care, be a good staff and assistant. It is necessary to extensively draw on the project management experience of the fraternal units, actively explore the ideas and methods for project construction that are suitable for the actual construction, overcome the difficulties of market factors and internal financial constraints, and persist in creating profit from the internal responsibility of the project. The new breakthrough point of project income increase gradually improves the quality of economic operation.


Chapter 5: Summary of the work of construction materials

In the past year, under the correct leadership of the old cadres of the municipal party committee and the strong support of all the staff of the Laogan Activity Center, we have earnestly studied Marxism and Mao Zedong Thought. Adhere to the *** theory and the important thinking of the "Three Represents" as the guide, adhere to emancipating the mind, seeking truth from facts, and boldly exploring. Adhere to various rules and regulations, actively participate in various political activities, act in a fair and decent manner, can take care of the overall situation, have a strong sense of service, dedication and dedication, work together with all employees of the Laogan Activity Center, and have achieved some results in the service of the old cadres. .

First, raise awareness and enrich yourself.

自活動中心大樓奠基以來,我一直在工地管理監督和協調各項施工單位工作。當前,工地工作歷來是一件辛苦的工作,我從一個服務行業的工作人員轉為一個建築管理人員,對業務不熟悉,一切要從頭學起,對我來真是難上加難。我開始思想不通,但經過領導的耐用解釋和幫助,我終於認識到,搞好老乾活動中心大樓也是為老幹部服務的一項重要工作,它體現了市委、市政府對老同志的關懷。我深知責任重大,也是領導給我一個煅煉機會和對我的信任。我一定不能辜負領導對我的期望。帶著這個理想,我一方面蒐集有關資料,購買書籍,學習建築相關知識。另一方面,虛心請教有經驗的建築專業技術人員。經過一段時間的刻苦努力,我終於掌握了一些建築有關的知識。

二、對工程施工建成設的質量控制工作

工程質量的好壞,直接體現我工作的成壞。也是整項工程的關健部分。在收到工程施工圖紙後,我就先進行熟悉圖紙,了解設計意圖,明了施工過程的主要工藝流程、工程特點,對施工圖紙上所存在的異議之處採用書面形式進行記錄,在圖紙會審會議上提出,由設計進行明確。針對在工程關鍵部位的施工時,做到提前到達旁站位置,檢查施工準備工作,並旁站施工全過程,對一般施工的各道工序作業,做好日常的巡視、巡檢、檢查工作。對各施工過程中的巡視、巡檢、檢查所發現的問題,及時採用口頭形式通知施工單位工程項目管理部,做到發現問題及時向領導匯報,並督促施工單位落實整改及進行再次的覆核檢查發現問題及時停頓整改。例一:在檢查中發現施工單位C25#水坭砼配比未通過檢測部門監定就進行施工,我立即要求施工隊停工,直到施工單位送檢後確定配比才進行施工。例二:三層模板設計要求是結構走坡,而施工單位採用建築走坡按裝模板,經檢查發現,要求施工單位拆除重新安裝。例三:三層6條主梁每條少放ф25架立筋2條,經檢查發現,立即要求施工隊停工,直到施工單位整理好驗收合格後才能進入下一工序。從活動中心大樓動工到驗收,由我在本工程的日常監理工作中針對工地上所發現質量隱患與缺陷、不符全質量與規範現象等等,以及在施工現場與施工過程中所存在的不安全隱患與存在著的危險源等事宜,共累計口頭下達的監理整改通知有40多次。在整個工程中我儘自已最大努力做好工程施工建設監理質量工作。

三、對安全文明施工控制方面的工作

通過對學習《安全生產法》及在工作過程中我得到一些體會,樹立以安全預防為主的觀點,就是工作做在前,因為事故是可以預防的,但是不可預測的,建立相應的檢查制度,發現隱患及時整改,監理在施工現場對於安全有不可推卸的職責,我作為這個工程的項目安全生產中的其中一員,除了做好日常的安全檢查工作及監督和管理工作外,還積極配合江門市建委和開平市建委的安全質量查。從活動中心大樓動工到驗收,無一例人員和機械等安全事故發生。受到了江門市建委和開平市建委的多次好評。並成為開平市的樣板工程。

四、搞好大樓的環境,完善各種設備配套。

六月尾,我的工作是最為緊張的,上級要求在7月1日開張,因時間緊,工作繁多,我除了做好工程手尾工作外,還要協助搞好環境衛生、家具擺放和設備安排。根本陳主任的安排,每天實行加班加點進行大清潔,認真地布置各活動室的家具擺放,及時調施各種設備,對未及時到位設施和家具的廠商進行聯繫追收。對未合要求的地方進行整改。在老乾局的精心策劃、陳主任的帶領和活動中心全體員工的共同協作下,終於如期地完成任務。開放給老幹部活動。老幹部活動中心運作半年來,我們協辦了“七一 ”文娛會演;“九九”文娛晚會;“元旦”聯歡會等大型活動。老乾活動中心得到了老乾局的大力支持和幫助,各項工作比較好,受到了老幹部的好評。

五、戒驕戒躁,面向未來。

今後,我們在新的環境不但發揚過去熱情周到的工作作風,還要積極配合市委市政府開展各項政治活動。要樹立敢闖敢試,敢為人先的創新意識。認真學習增強自身的素質。要善於用全新的視角思路,研究新情況,解決新問題,多為老幹部辦好事、辦實事。不斷提高服務質量,更好地為老幹部服務,爭當老幹部服務的排頭兵。

recommended article

popular articles