Article 1: Building Agreement
Room owner:
Contractor:
According to the relevant provisions of the "Contract Law of the People's Republic of China" and the "Architectural Law", in conjunction with the specific conditions of the project, in order to clarify the rights and obligations of Party B in contracting the construction of the main project of Party A's private residence, the contract is signed by both parties.
First, the construction project: the main project of private residence.
Second, the building area and housing orientation:
Third, the construction method and construction preparation:
1. Party A will contract the construction of its main building project to Party B for contracting and contracting.
2. Party B must provide construction materials according to the contract and provide the following building materials. All materials must be accompanied by a product certificate before they can be used in the project.
(1) The depth of the ground trough is 1000, the outer enveloping width is 1600, the inner three wall width is 1800, the main reinforcement is Ø12, the concrete height is 250, the secondary reinforcement is Ø8, and the spacing is 150-160; the above-mentioned steel bars are used with standard sand steel or Yonggang, cement with Changshu Golden Cat 425 #标准水泥.
(2) The ground beam ring beam is bottom 3XØ18, middle 2XØ12, top 3XØ14, spacing 180-200, 400X500 ground beam on reinforced concrete. Standard sand steel or Yonggang for steel bars and 425# standard cement for cement with Changshu.
(3) Ring beam: 220X250, standard sand steel or Yonggang for steel, and 425# standard cement for cement with Changshu. The height of the wall and the size of the door and window are determined according to the drawings.
(4) Floor, the floor is cast in one time, the thickness of the floor is not less than 120, the double-layer mesh of Ø8; the load-bearing beam of the floor: 250X600, Ø25. Standard sand steel or Yonggang for steel bars and 425# standard cement for cement with Changshu.
(5) The roof of the wooden roof is not less than 180, the battens are 3X4, the thickness of the roof is not less than 25, and the roof is made of waterproof linoleum. The oil felt is made of universal brand standard oil felt with a thickness of 3-4.
(6) All sand used in the project shall be sand and coarse sand, fine sand shall not be allowed; stones shall be stone with standard conformity; bricks shall be of good quality and conform to the standard bricks, and other auxiliary materials shall also be coated with materials conforming to the standard. Party B shall make the ratio of cement to other materials reasonable, and all materials shall not affect the quality of the project.
(7) In addition to the water and electricity village materials and installation, the door and window materials and installation are responsible for Party; the bathroom, the kitchen veneer, and the wall corrugated tile and exterior wall coating, the waterproof coating is provided by Party A, and Party B is responsible for the construction. Any materials and labor other than this article are included in the total price of the project. Party B shall not arbitrarily increase the price during the project, or change the materials and engineering structure without the consent of Party A, and Party B shall be responsible for all the consequences arising therefrom.
3. All the tools required by Party B for construction, including construction machinery such as mixers and vibrators for construction, bamboo and wood for formwork and scaffolding, etc., must be provided with rain-proof canvas to avoid rain when the floor is made. Affect the quality of the floor.
Fourth, the construction period: the construction period is 150 days.
V. Construction project price and payment method:
1. The total cost of the residential project is 186,000 yuan, capitalized: 捌 捌 仟 仟 仟 。.
2. Payment method:
The first payment was 30,000 yuan at the start of construction. After the completion of the project and the acceptance of Party A, the company paid 20,000 yuan. After the first floor was completed and accepted by Party A, 40,000 yuan was paid. The second floor was completed and approved by Party A. 20,000, the roof is capped and paid 30,000 yuan after passing the acceptance of Party A. After the completion of the project and after passing the acceptance of Party A, it will pay 20,000. The remaining funds will be paid after completion of one year.
Sixth, construction safety requirements
1. Party B clarifies that it has the construction qualification corresponding to the private residential project under construction, and clarifies that its construction personnel also have corresponding qualifications and qualifications to ensure that the projects undertaken by Party B meet the quality and technical requirements required for construction. .
2. Party B must focus on the quality and safety of the project, and build houses in strict accordance with the standards for earthquake-resistant housing construction. During the construction period, to ensure the quality and safety of the project, control various possible risk factors and eliminate the hidden dangers of safety accidents. Strengthen the comprehensive inspection and supervision of the three elements of project quality, schedule and safety at any time.
3. Party B must adopt strict safety protection measures in accordance with safety construction specifications and technical requirements. During the construction process, special attention should be paid to safety construction, all accidents should be eliminated, and responsibility for accidents due to inadequate or ineffective safety measures should be assumed. All the expenses. If such a situation arises, the liability has nothing to do with Party A.
4. Party B is responsible for running the labor insurance. If an accident occurs during construction, Party B shall be responsible for it, and Party A shall not bear any other responsibility.
Seven, the quality of the project.
1. Party B shall construct according to the drawings provided by Party A. If the drawings are found to have unreasonable parts, Party A and Party B shall jointly negotiate and obtain a clear and consistent construction plan before Party B can proceed with the construction.
2. The quality of the project should meet the qualification requirements for the evaluation criteria for earthquake-resistant housing construction. After the building of the house, the wall, window installation, doors, etc. should be smooth and smooth, and the wall tiles and floor coverings should be smoothed to prevent empty drums and meet relevant standards.
3. Party B shall rework, modify and rework according to the requirements of Party A and its appointed personnel, and shall bear all expenses such as labor, materials, etc., resulting in rework, modification, rework, etc., due to Party B's own reasons. If the agreed conditions of use are still not met after rework or modification, Party B shall be responsible for the project quality breach of contract.
4. If the quality of the project does not meet the contractual requirements, Party B shall be responsible for repairs or rework without compensation.
8. Liability for breach of contract and dispute resolution
1. If Party B undertakes the quality of the construction project that does not meet the agreed requirements, Party B shall repair, rework or rework without compensation; if the loss is caused, Party B shall compensate for all losses. If there are other reasons for Party B's failure to perform due to Party B, Party B shall compensate for all losses caused to Party A due to its breach of contract.
2. In the event of a dispute between Party A and Party B due to the performance of this contract, both parties shall consult in time. If the negotiation fails, either party may apply to the Urban and Rural Construction Committee at all levels or the competent department of the higher authorities at both levels for mediation; if it cannot be resolved, the following may be selected. Item processing:
Apply to the Arbitration Commission at the location where the building is located for arbitration,
Sue directly to the people's court.
9. The entry into force and termination of the contract.
1. This contract is made in two copies, one for each party.
2. This contract shall become effective as of the date of signing and shall be terminated after the settlement of the project payment.
Ten, others.
The above contract must be observed by both parties. If the supplementary contract is signed by both parties, the supplementary contract has the same legal effect as the contract.
Signature of Party A: Signature of Party B:
date
Part 2: Building Agreement
Room owner:
Contractor in charge:
Party A is located in Jiangbei District of Zhe County to build a private house. The main project package of the building will be submitted to Party B for construction. To ensure the quality of the project is completed on time and clarify the responsibilities of both parties, the following agreement is signed:
1. Contracting method: The project adopts the form of contracting and non-contracting materials. The materials that can not be recycled by the steel, cement, sand and stone materials, nails, iron wire, ropes, etc. used by Party A are provided by Party A, and various machinery used in Party B’s construction. Party B shall be responsible for the construction tools such as mixers, agitators, winches, vibration equipment, formwork, roofing timber, truss timber, shovel, and trolley.
2. Project content: The main structure structure required by Party A shall be continuously completed from ±0.00 or above. The indoor plastering, building height and front part design shall be constructed according to the urban construction design drawings, and the interior shall be constructed according to the design requirements of Party A, including the kitchen, www .fdcew.com bathroom layout board.
3. Engineering quality: The construction should be carried out according to the regulations. The quality requirements are straight on the wall, the bricks are filled with pulp, the beams and columns are required to be vertical and flat, and the strength is sufficient. The two corners of the steel bars and the ribs are bent to 135 degrees.
4. Responsibilities of both parties: During the construction process, if Party A directs all losses caused by mistakes, Party A shall take care of itself and compensate Party B for labor losses. If Party B's own mistakes during construction or the lack of support of the model are caused by slumping and distortion, it is forced. Party B shall compensate Party B for all material losses and deduct from the project payment when the project is settled. From the clear heart without rain
5. Settlement payment method: The project settlement is calculated according to the actual construction area of the national standard. Party A shall settle it to Party B according to the construction area per square meter. After all the projects have passed the acceptance test, all settlements will be paid.
6. Safe construction: Party B's technical team must pay attention to the technical quality, and must be safe and civilized construction, according to the standard construction, such as quality accidents, personal safety accidents, etc. in the construction process are responsible for Party B.
7. Construction period: During the construction period, it is required to complete all the main contracting projects within one month.
8. If there are any incomplete matters in this Agreement, the two parties shall jointly resolve the matter or deal with it according to the contract law.
9. This Agreement is made in two copies. Party A and Party B each hold one copy and the two parties sign the signature. The project will be accepted and accepted, and the project will be terminated after the settlement of the project.
Signature of Party A: Signature of Party B:
Year, month, day, month, day
Part 3: Building a House Agreement
Party A:
Party B:
For some details, please discuss with the local people who have built the house...
Party A is building a building with two floors, one floor is about square meters, and the second floor is about square meters. It is contracted by Party B. The two sides adhere to the principle of equality, mutual benefit and good faith to ensure the safety, quality, efficiency and low consumption of the project. The two parties have agreed to sign the two parties in order to abide by:
First, the contracting method
Contracted by contractor without contracting.
Party A provides the materials needed for building houses, including: red brick, river sand, gravel, lime, cement, steel, water pipes, sewer pipes, nails, wire, water and electricity, and so on.
Party B provides labor services, construction techniques, construction tools, and all tools for production and life.
Second, the construction project
Party B shall undertake construction in accordance with the design drawings or the requirements of Party A. Buildings of the main building of Party A's houses, including walls, beams, columns, stairs, floors, moulds, demouldings, steel bars, cast-in-place concrete and floors, front stepped linings; decorative interior roughing, front façade Tiling, trailing edge exterior wall flour cement mortar, bathroom floor and wall tiling, installation of porcelain basins, sewer passages, downpipes; top layer level grouting and polishing treatment.
Third, the contract price
RMB capital per square meter: Yuan, the building area is calculated according to the outer wall of each floor. The scope of construction includes all walls that require cement mortar to be applied.
Fourth, payment methods
After the contract is signed, the tools will enter the site, the personnel will be in place, 30% will be paid in advance, the first floor brick will be completed and the floor will be paid 50%, the second floor and the roof will be paid 75% of the payment, and the project will be completed. After the completion of the inspection, 90% will be paid, and 10% will be reserved for the quality guarantee. There will be no quality problems within one year after completion, and the final payment will be made.
V. Liability of both parties
Party A is responsible for the timely supply of water and electricity and raw materials, daily lunch, daily lunch
Party B must ensure the quality and progress of the project, construct according to the design drawings and the requirements of Party A, save materials, and keep the materials safely, and must not be lost.
Sixth, quality requirements
Party B shall organize the construction in accordance with the housing quality standards and requirements stipulated by the State. Party B shall be responsible for rework when unqualified, and the rework fee shall be borne by Party B or deducted by Party A from Party B's construction cost.
Seven, pay attention to safety
Labor protection measures, construction protection measures in place, safe construction. If Party B's construction personnel have accidents due to their own reasons or Party B's safety protection measures are not in place, or cause damage to others due to construction, Party B is responsible for all, Party A does not bear any responsibility and expenses. Civilized construction, pay attention to professional ethics, pay attention to cleanliness.
Eight, construction period requirements
The construction period of the main project is 75. From the day after the signing of the contract, Party B must complete the main project before the date of the year and the year. Due to the weather, Party B cannot delay the completion time of Party A for various reasons. In case of the materials required by Party B, Party A shall submit a plan to Party A in advance for timely preparation.
Nine, late maintenance
The maintenance costs incurred by Party B’s quality problems shall be borne by Party B and shall bear the relevant compensation and liabilities arising therefrom.
Ten, other
Other unfinished matters, the two sides negotiated to resolve, and strictly enforced according to national and local standards.
This contract is made in two copies, one for each party, and one for each party, effective from the date of signature.
Party A’s signature:
Signature of Party B:
recommended article
- [Boutique] parking space lease agreement
- [Boutique] Exhibition Agreement
- Installation project subcontracting agreement
- Express Delivery Collection Agreement
- Cooperative housing agreement
- [Boutique] Dealer Agreement
- [Boutique] Tripartite Cooperation Agreement Template
- [Boutique] two-person partnership agreement
- 2019 Rental Agreement
- [Boutique] employee confidentiality agreement
- [Boutique] loan agreement
- [Boutique] Traffic Accident Compensation Agreement Template
popular articles
- Sima Yi's famous sayings
- Model of compensation agreement
- Persuade
- The dirtyer the words, the better
- Evaluation teacher's words 2019
- Optimistic quotes
- Strictly speaking
- Gu Yanwu's famous sayings
- Apologize to my wife 2019
- Cooperation agreement
- Touched sentence
- Strategic cooperation agreement
- Partnership agreement
- [Boutique] Investment Cooperation Agreement Template
- Diligent maxim
- English inspirational quotes
- Grateful parents' famous words
- Introspection
- Vehicle sale and purchase agreement
- Lenin's famous sayings
- Site cooperation agreement
- Uncomfortable sentence 2019
- English learning maxim
- Recovering his girlfriend’s words
- [Boutique] Technical Cooperation Agreement Template
- Sentence 2019 depicting snow scene
- Celebrity maxim
- [Boutique] Strategic Cooperation Agreement Template
- Touching words
- Consultation cooperation agreement