Installation project subcontracting agreement


Total package unit: xxxxxxxxx new district project department

Subcontracting unit: xxxxxx ID number:

The xxxxxxx hydropower installation project contracted by Party A, after deliberation and comparison, decided to

The installation fee part of this project follows the principle of equality, fairness and honesty and trustworthiness.

This Agreement is entered into by consensus.

First, the project overview:

1. Project name: xxxxxxxxxx

2. Project location: Chengnan Road

3. Project content: Hydropower installation

Second, the construction date:

Based on the owner's construction period requirements, Party B can only advance in advance, and may not delay. If Party B's construction period fails to meet the requirements of the owner, all the liabilities and economic losses caused by Party B shall be borne by Party B.

Third, the quality of the project:

Party B carefully organizes and standardizes the construction according to the principle of creating a high-quality project and the image of the company. It obeys the command of the project department of Party A to ensure that the construction of the project meets the requirements of Party A and the owner. According to the national acceptance criteria, Party B guarantees a one-time acceptance of the project. % meets the eligibility criteria. If Party B fails to meet the requirements of the owner due to the failure of Party B, all the responsibilities and economic losses caused by the requirements of the owner shall be borne by Party B.

Fourth, civilized construction:

1. Party B should work as uniform as possible on the construction site. When entering the construction site, it is necessary to wear a safety helmet, fasten the seat belt, and fasten the insurance belt and other labor insurance products.

2. Party B shall, in accordance with relevant regulations, adopt strict safety precautions, assume responsibility for accidents caused by improper safety measures, and effectively implement civilized construction and safe production.

3. During the work period, construction workers are not allowed to drink alcohol or fight. If they are found to be fined 200 yuan each time, it is strictly forbidden to steal the materials on the site. If it is found to be a fine of 10 times the unit price of the stolen materials, it will be sent to the public security organ for serious treatment.

4. The dormitory should be clean and tidy. The water for temporary construction and use should be standardized. If Party B is responsible for the fines imposed by the owner, the supervisor and the safety supervision department due to Party B’s illegal operation or no safety precautions, Party A has the right to be in Party B’s own 3 times more fine.

5. Party A shall be equipped with a full-time security officer. Party B must obey the command and achieve no ordinary accidents and eliminate major casualties.

6. If any of the above is not complied with by Party B, Party A has the right to impose corresponding punishment and dismissal, and the salary is settled at 50% of the tasks completed in the subcontracting agreement.

V. Construction scope:

The xxxx site includes installation, pressure testing, and commissioning in all the contents of the tender contract project until the completion acceptance is passed.

6. Engineering materials:

1. Party B shall provide Party A with process inspection, concealed project acceptance, partial project acceptance and relevant engineering materials in time during the construction period, and provide Party A with completed drawings after the completion of the project.

Seven, material supply:

1. The construction materials required by Party B shall be reported to Party A in writing two days in advance. After approval by the project department, Party A shall report to the Materials Department for procurement. Scattered materials arrived in the field for three to seven days, and large materials were delivered for ten days to half a month.

Eight, payment method:

1. Party A shall pay monthly living expenses according to the on-site construction personnel and construction progress and quality of Party B, but shall not exceed 70% of the amount of work completed on the installation project subcontracting agreement.

2. After the completion of the project is completed and accepted, Party A will settle the Party B in one month.

3. Party B shall report the progress monthly report of the month and the attendance form of the construction personnel. Party B may withdraw 1000~XX yuan of standby funds every month.

9. Settlement method for project installation fee:

According to the total construction cost of Party A and Party B, the total construction cost is 90,000 yuan. According to the contents of the drawings, no adjustment is made at one time. The amount of work outside the drawings is calculated according to 10% of the cost.

X. Duties of both parties:

1. Party A shall provide Party B's engineering drawings and carry out related disclosures, and shall be responsible for coordinating the various links in the construction to ensure the smooth progress of Party B's construction.

2. Purchasing the main materials and auxiliary materials to the construction site in time according to the on-site construction progress.

3. Responsible for technical disclosure and safe disclosure of Party B personnel, comprehensively supervise and urge Party B to do all kinds of safety production work, and take necessary fines for Party B to violate safety production regulations.

4. According to the opinions of the owner and the supervision unit, timely formulate the construction plans at various stages, and notify Party B in writing to ensure that the construction of the project is carried out in an orderly manner.

5. Party B shall cherish the construction equipment and tools provided by Party A, and arrange the construction team with excellent technology to carry out the construction. If Party B causes rework, material loss and economic loss, Party B shall bear the responsibility.

6. After receiving the project payment, Party B shall not default on the living expenses and wages of the construction personnel.

7. When the materials enter the construction site, Party B shall actively arrange the personnel to unload the goods into the warehouse, and the materials should be properly handled.

8. The materials of Party B shall be in accordance with the construction drawings, and the finished product protection work shall be completed after the completion of the project.

9. Party B shall not waste materials or use large materials during the construction process. If it is found that it is deducted according to the price of the finished material, the labor fee is charged.

10. If Party B causes damage to the equipment and equipment provided by Party A due to improper use or man-made damage, Party B shall pay compensation according to the price, and the expenses shall be deducted from the contracted project.

11. Party B shall complete the work and clear the materials. The construction equipment and tools and the remaining materials shall be collected and handed over to the warehouse, and the handover records shall be made. If it is found that there are lost materials and tools on site, Party A has the right to impose corresponding penalties.

XI. The above provisions of this Agreement shall become effective on the same day after the signatures of both Party A and Party B are confirmed, and the conditions for deletion or addition shall be invalid.

XII. Other unsuccessful matters in this Agreement shall be settled through consultation between the two parties.

XIII. This Agreement shall be made in triplicate. Each Party A and Party B shall hold one copy and submit it to the competent department for an archive for reference.

person A person B: