Freight waybill (car)
××Provincial Cargo Waybill
──────────
Shipper: Manager: Phone: Address: Waybill number:
┌───┬─┬─┬───┬──┬─┬──────┬──┬───┬─┐
│Consignor │ │Address │ │Phone │ │ Loading Location ││Factory Day │ │
├───┼─┼─┼───┼──┼─┼──────┼──┼───┼─┤
│Consignee │ │Address│ │Phone│ │ Unloading Location││Factory Day │ │
├───┼─┼─┼───┼─┼─┼───┬─┬┴─┼─┬─┴┬┤
│Payer │ │Address │ │Phone │ │Agreement │月│Agree to │月│Need ││
│ │ ││ ││ │Transport Time│Day│Time │Day │Vehicle ││
├─┬┴┬┴┬─┴───┼─┼─┼─┬┴─┼───┴┬┴─┬┴┤
│Cargo │Pack │ │ Volume │ Part Weight │ Heavy │ Insurance │ Goods │ │ │ │
│Name│装│件│长×宽×高│ │克)│ │Price│Level││重量│ Price│
│Specification│式│ │ ││Ton│││││ │
├─┼─┼─┼─────┼──┼─┼──┼──┼────┼──┼─┤
││ │ │ ││ │││Freight ││ │
││ │ │ ││ ││├────┼──┼─┤
├─┼─┼─┼─────┼──┼─┼──┼──┤Loading and unloading ││ │
││ │ │ ││ ││├────┼──┼─┤
││ │ │ ││ │││││ │
├─┴─┴─┴─────┴──┴─┴──┴──┼────┼──┼─┤
│ │││ │
├─┬─┬─┬─────┬──┬─┬──┬──┼────┴──┴─┤
│合│ │ │ ││ ││Billing│ │
│计│ │ │ ││ ││Yours │ │
├─┴─┼─┴─┬───┴┬─┴┬┴─┴┬─┴┬────┬───┤
│Consignment│ │Payer││Carrier ││Carrier │ │
│Record │ │Bank Account ││Record ││Bank Account │ │
├─┬──┴───┴────┴──┴────┴──┴┬───┼───┤
│Note│1. Shippers should not fill in the items in the thick line. │ Shipper │ Carrier │
│意│2. The name of the goods should be filled in with the specific product name. If the name of the goods is too much, │ signature │ signature │
│Things │ You cannot fill in the list of items separately in the waybill. │ │ │
│Item│3. Insurance or insured goods, fill in the goods declaration in the corresponding price column │ year, month, day │ year, month and day │
│ │Price. │ │ │
└─┴─────────────────────────────┴────┘
[description]
1. The goods filled in one cargo waybill must be the same shipper. For the assembly and unloading of goods, each assembly or disassembly shall be indicated in the note of the waybill. Corrosive, brittle goods, liquids that are easy to spill, dangerous goods and ordinary goods, and goods with different nature and different transportation conditions may not be consigned by the same waybill. When the shipper and the carrier modify the waybill, they must sign and seal.
2. This transport single type 2 copies: 1 accept stubs; 2 check receipts.
──────────
Shipper: Manager: Phone: Address: Waybill number:
┌───┬─┬─┬───┬──┬─┬──────┬──┬───┬─┐
│Consignor │ │Address │ │Phone │ │ Loading Location ││Factory Day │ │
├───┼─┼─┼───┼──┼─┼──────┼──┼───┼─┤
│Consignee │ │Address│ │Phone│ │ Unloading Location││Factory Day │ │
├───┼─┼─┼───┼─┼─┼───┬─┬┴─┼─┬─┴┬┤
│Payer │ │Address │ │Phone │ │Agreement │月│Agree to │月│Need ││
│ │ ││ ││ │Transport Time│Day│Time │Day │Vehicle ││
├─┬┴┬┴┬─┴───┼─┼─┼─┬┴─┼───┴┬┴─┬┴┤
│Cargo │Pack │ │ Volume │ Part Weight │ Heavy │ Insurance │ Goods │ │ │ │
│Name│装│件│长×宽×高│ │克)│ │Price│Level││重量│ Price│
│Specification│式│ │ ││Ton│││││ │
├─┼─┼─┼─────┼──┼─┼──┼──┼────┼──┼─┤
││ │ │ ││ │││Freight ││ │
││ │ │ ││ ││├────┼──┼─┤
├─┼─┼─┼─────┼──┼─┼──┼──┤Loading and unloading ││ │
││ │ │ ││ ││├────┼──┼─┤
││ │ │ ││ │││││ │
├─┴─┴─┴─────┴──┴─┴──┴──┼────┼──┼─┤
│ │││ │
├─┬─┬─┬─────┬──┬─┬──┬──┼────┴──┴─┤
│合│ │ │ ││ ││Billing│ │
│计│ │ │ ││ ││Yours │ │
├─┴─┼─┴─┬───┴┬─┴┬┴─┴┬─┴┬────┬───┤
│Consignment│ │Payer││Carrier ││Carrier │ │
│Record │ │Bank Account ││Record ││Bank Account │ │
├─┬──┴───┴────┴──┴────┴──┴┬───┼───┤
│Note│1. Shippers should not fill in the items in the thick line. │ Shipper │ Carrier │
│意│2. The name of the goods should be filled in with the specific product name. If the name of the goods is too much, │ signature │ signature │
│Things │ You cannot fill in the list of items separately in the waybill. │ │ │
│Item│3. Insurance or insured goods, fill in the goods declaration in the corresponding price column │ year, month, day │ year, month and day │
│ │Price. │ │ │
└─┴─────────────────────────────┴────┘
[description]
1. The goods filled in one cargo waybill must be the same shipper. For the assembly and unloading of goods, each assembly or disassembly shall be indicated in the note of the waybill. Corrosive, brittle goods, liquids that are easy to spill, dangerous goods and ordinary goods, and goods with different nature and different transportation conditions may not be consigned by the same waybill. When the shipper and the carrier modify the waybill, they must sign and seal.
2. This transport single type 2 copies: 1 accept stubs; 2 check receipts.
recommended article
- Express service agreement
- Provincial car transport ticket
- List of items (1)
- Transport contract (waterway 1)
- Vehicle transportation contract
- Charter charter agreement
- Moving freight contract
- Freight waybill (car)
- Cargo transportation contract
- Contract for the carriage of goods by sea
- List of items (railway)
- Entrusted financial management and account supervision agreement
popular articles
- Maritime transport agreement
- Container trailer transport contract
- Lincoln's famous sayings
- The most sad sentence 2019
- Modest and famous sayings
- The most common words of Satay
- Give the teacher 2019
- Waterway cargo waybill
- Handling contract model
- Courier contract sample
- Transport management agreement
- Honesty and good words
- Freight waybill (waterway)
- a good saying that loves labor
- Earthmoving agreement
- Participle phrase
- Sentence of life
- English joint test composition omnipotent sentence
- Encouraging words 2019
- Grasp the opportunity
- Praying the mother's famous words
- Sentences describing mental activities
- English four-level composition omnipotent sentence
- Deng Xiaoping's famous sayings
- Cherish the time of the famous sayings
- China Civil Aviation Cargo List
- a famous saying in the face of difficulties
- a famous saying of adversity
- Latest praise to the teacher
- List of items (3)