Summary of work of water conservancy drilling team


In the past two years, we have focused on improving management, increasing efficiency, and promoting development, and have made great efforts to improve the quality of wells, so that the work of the well team has made considerable progress. The business situation in the past two years is briefly summarized as follows:

1. Basic situation of the well team

There are 27 employees in the well team, including 2 administrative cadres, 2 technical leaders, 2 economic leaders, 3 external personnel and 18 workers. Among the 27 employees of the unit, there are 2 engineers, 3 assistant workers and 4 well technicians. The total number of workers is 10 more than that of XX. The well team has 6 rigs, 12 diesel engines, 3 electric motors, 6 mud pumps and 6 tractors. The equipment has increased by 2 sets compared with XX.

2. Engineering projects and engineering quantities completed by the sinking team

Our Shazhen Water Conservancy Drilling Team is mainly engaged in sinking wells, and is also engaged in workover and foundation grouting projects. The business of the sinking team is centered on Shazhen, taking into account the surrounding township offices of Zhu Laozhuang, Li Haiwu, Zheng Jia and Hou Ying. The sinking depth of the sinking team is mainly in the middle and shallow wells. The annual average drilling depth is above XX meters, the average annual drilling number is 260, the average old well is repaired 350, and the average annual pile foundation is more than 50. It can independently undertake the construction work of sinking well with complicated geological conditions.

3. Economic benefits and increase and decrease of fixed assets

In the past two years, with the strong support of the relevant departments at the higher levels, the economic benefits have increased with the constant fixed assets. Under the guidance of the market economy, we have adopted the principle of combining contracted operation and leasing, and dare to increase the capital increase and increase the annual output value of the well team by 20% to 200,000 yuan.

4, old well repair work

Our well-drilling team strictly enforces the technical specifications of the well construction, eliminates the existence of construction safety hazards, and establishes safety, technology, quality and other management systems. The well-drilling rate is continuously increased to 99%, and no well-drilling accident has occurred in two years. . In the repair work of the old machine wells, we are in line with the principle of repairing and repairing, and we will never arbitrarily scrape a look at the old wells and maximize the benefits to the people.

5, daily management work

Strict rules and regulations ensure the healthy development of the well team. In the past two years, we have been paying close attention to the implementation of various rules and regulations, and have formulated rules and regulations for team discipline, technical management, and financial management. Each employee has signed a letter of responsibility, especially in the quality supervision and management of the well, and every quality inspector has put forward strict requirements.

In the past two years, we have continuously summed up lessons learned from our work and learned from the advanced technology of the external units to promote the healthy development of the sinking team. However, there are still many problems, such as poor economic returns and slow growth of fixed assets. We are confident and determined to strengthen management, expand business channels, and strive for greater economic benefits.