Summary of work of water conservancy drilling team
In the past two years, we have focused on improving management, increasing efficiency, and promoting development, and have made great efforts to improve the quality of wells, so that the work of the well team has made considerable progress. The business situation in the past two years is briefly summarized as follows:
1. Basic situation of the well team
There are 27 employees in the well team, including 2 administrative cadres, 2 technical leaders, 2 economic leaders, 3 external personnel and 18 workers. Among the 27 employees of the unit, there are 2 engineers, 3 assistant workers and 4 well technicians. The total number of workers is 10 more than that of XX. The well team has 6 rigs, 12 diesel engines, 3 electric motors, 6 mud pumps and 6 tractors. The equipment has increased by 2 sets compared with XX.
2. Engineering projects and engineering quantities completed by the sinking team
Our Shazhen Water Conservancy Drilling Team is mainly engaged in sinking wells, and is also engaged in workover and foundation grouting projects. The business of the sinking team is centered on Shazhen, taking into account the surrounding township offices of Zhu Laozhuang, Li Haiwu, Zheng Jia and Hou Ying. The sinking depth of the sinking team is mainly in the middle and shallow wells. The annual average drilling depth is above XX meters, the average annual drilling number is 260, the average old well is repaired 350, and the average annual pile foundation is more than 50. It can independently undertake the construction work of sinking well with complicated geological conditions.
3. Economic benefits and increase and decrease of fixed assets
In the past two years, with the strong support of the relevant departments at the higher levels, the economic benefits have increased with the constant fixed assets. Under the guidance of the market economy, we have adopted the principle of combining contracted operation and leasing, and dare to increase the capital increase and increase the annual output value of the well team by 20% to 200,000 yuan.
4, old well repair work
Our well-drilling team strictly enforces the technical specifications of the well construction, eliminates the existence of construction safety hazards, and establishes safety, technology, quality and other management systems. The well-drilling rate is continuously increased to 99%, and no well-drilling accident has occurred in two years. . In the repair work of the old machine wells, we are in line with the principle of repairing and repairing, and we will never arbitrarily scrape a look at the old wells and maximize the benefits to the people.
5, daily management work
Strict rules and regulations ensure the healthy development of the well team. In the past two years, we have been paying close attention to the implementation of various rules and regulations, and have formulated rules and regulations for team discipline, technical management, and financial management. Each employee has signed a letter of responsibility, especially in the quality supervision and management of the well, and every quality inspector has put forward strict requirements.
In the past two years, we have continuously summed up lessons learned from our work and learned from the advanced technology of the external units to promote the healthy development of the sinking team. However, there are still many problems, such as poor economic returns and slow growth of fixed assets. We are confident and determined to strengthen management, expand business channels, and strive for greater economic benefits.
recommended article
- Outdoor expansion training work summary essay
- Summary of the Missionary Work in 2019
- Guangfeng County Land and Resources Bureau, 2019 year-end work
- Summary of the business climate survey work in 2019
- Summary of work at the port office in 2019 and work in 2019
- Summary of class work in the last semester of 2019
- Summary of the work of the street office in 2019 and 2019
- Summary of the work of the Youth League Committee in 2019
- In 2019, the cadre team of the county radio and television bureau rectified
- Summary of safety production work of safety supervision station
- Summary of Party Building Work of School Party Branch
- Summary of geotechnical engineering survey work
popular articles
- Time maxim
- Thank the teacher for the words
- Summary of the work of the teaching and research section in 2019
- Consolation of a bad mood
- Have to say
- Praise the sentence of the motherland
- Summary of news and publicity work in 2019
- Student Union Propaganda Department work summary
- Singing the famous sayings of the motherland
- Summary of the work of 2019 old cadres
- Written to the son 2019
- Summary of the work of the national small trade unions in 2019
- Learning aphorism
- Non-mainstream aesthetic sentimental sentence
- Summary of poverty alleviation work in 2019
- Sentences depicting autumn scenery
- Franklin's famous words
- Hyun dance family impression sentence
- Love and happiness sentence 2019
- Poems
- The sentence at the time of completion
- Describe the sentence of sweet-scented osmanthus
- Sad sentence 2019
- Summary of the 2019 Winter Conscription Work of the Armed Forces
- Joe Gillard's famous saying
- Financial Section 2019 Financial Work Summary
- Admit mistakes
- University Student Union Propaganda Department work summary
- Ji Yulin's famous sayings
- Summary of the work of party style and clean government construction in 2019