Article 1: The duties of the HVAC constructor

1. Under the leadership of the project manager, carry out construction management work.
2. Responsible for the overall deployment and general layout of the construction site.
3. Coordinate the construction progress, quality and safety of the labor layer. Implement the overall construction plan.
4. Supervise the labor layer to follow the standard construction to ensure full production and civilized construction. Comprehensive and reasonable implementation of the program to keep the construction site safe and effective.
5. Propose measures to ensure construction, safety and quality and organize implementation.
6. Supervise the construction materials and equipment to enter the site on time, and be in a qualified state to ensure the smooth progress of the project.
7. Participate in the completion of the project and be responsible for the integrity of the project.
8. Record the construction log accurately on time.
9. Reasonably allocate production factors, strictly organize construction to ensure project progress and quality, organize project acceptance, participate in quality assessment of sub-projects, and participate in the preparation of drawing review and project schedule.


Chapter 2: Job responsibilities of HVAC construction workers

1. Accept the work arrangement of the company's engineering director.
2. Familiar with the construction drawing of this major, and formulate the department's construction process report department review.
3. According to the drawings, according to the actual situation of the site, the materials before the construction of the professional are calculated, reported to the manager for review, and submitted to the materials department for preparation.
4. Responsible for the construction management of air-conditioning ventilation pipes and water supply and drainage pipes and fire pipes throughout the project.
5. Strictly abide by the construction safety management system. Strictly follow the national customs regulations and strictly control the quality.
6. Registration of the materials of this major is subject to registration verification.
7. Coordinating the relationship between the major and other related majors and cross-job work, can not solve the time report to the superior.
8. Go deep into the construction site, timely discover and correctly handle the general technical problems that arise during construction, and discover major technical problems. If it is not possible to solve the problem yourself, it should be reported step by step.
9. Familiar with the construction drawings, participate in the drawing review, and be responsible for the construction of air-conditioning ventilation pipes, water supply and drainage pipes, fire-fighting pipes according to the construction organization design, plan and schedule.
10. Do a good job of finishing the construction materials of this major. Do a good job in the hidden record of this profession.
11. Do a good job in the forensic work of the additional project of this major. Cooperate with Party A to do a good job in verifying the engineering quantity of this professional.
12. When the work is completed, do a good job of the inventory of the remaining materials of the profession and list the list of the fines to report to the materials department for verification of the inventory for the next project. Improve the completion data of this major, and cooperate with other majors to adjust the test of the whole project.


Chapter 3: HVAC Construction Workers' Responsibilities

1. Responsible for on-site construction management, communication and coordination of HVAC projects, responsible for the progress, quality, safety and cost of HVAC projects;
2. Manage the progress and quality of the project;
3. Responsible for the formulation, tracking and implementation of the project implementation plan within the profession;
4. Coordinate the work between various departments and between the company and the external units.


Chapter 4: HVAC Construction Worker Job Responsibilities

1. Complete the implementation of each project in accordance with the engineering design and construction drawings.
2. Have the ability to independently complete the general technical work of the project, and control and manage the whole process of project quality, safety, schedule and cost;
3. Prepare a list of engineering materials and place an order with the purchaser;
4. Acceptance of engineering materials;
5. Manage the construction team, arrange and supervise the construction team according to the project construction plan;
6. Record the construction log and coordinate the relationship between Party A and the supervisor;
7. Assist in project acceptance;
8. Familiar with HVAC/Mechanical engineering construction technology and related engineering construction regulations, collect and organize relevant materials of the entire project;