Hangzhou residential decoration and construction contract
Party A: ______________
Party B: ______________
Signing time: ____________________
Signing location: ____________________
In order to standardize the decoration and decoration of residential buildings and protect the legitimate rights and interests of both parties, according to the "Chinese People's Republic of China Contract Law", "The People's Republic of China Consumer Protection Law", the Ministry of Construction Order No. 110 "Residential Interior Decoration Management Measures", Hangzhou The Municipal People's Government has ordered the "Measures for the Administration of Urban Residential Decorations in Hangzhou" No. 141 and other relevant laws and regulations, and in accordance with the specific conditions of this project, the two parties reached the following agreement and abide by them.
I. Project Overview
1. The conditions of both parties: Party A's decoration of the house is legal residence. Party B is the unit approved by the industrial and commercial administration authority for the city and has obtained the residential decoration and decoration qualification certificate issued by the real estate management department.
2. Decoration construction site: _____ district _____ road _____ building _____ _____ room.
3. Housing structure: _____ room _____ hall _____ structure, building area _____ square meters.
4. Decoration construction content: See Attachment File 1 "Construction Content Table" for details.
5. Contracting:.
6. This project was designed by _____.
7. Construction period: The project period is _____ days, starting from _____ years _____ months _____ days, and _____ years _____ months _____ days are completed.
Second, the project price and settlement method
1. The total price: _____ yuan, tax dollars. If the construction content is changed by both parties, the engineering cost of the changed part shall be calculated separately.
2. After the contract is signed, Party A shall pay _____% of the total price, which is _____ yuan. Before the date of the year, Party A pays _____% of the total price, _____ yuan; before the date of the year, Party A pays _____% of the total price, _____ yuan; before the date of the year, Party A pays the total The _____% of the price shall be calculated as _____ yuan; the final payment shall be paid in _____ days after the completion of the project.
Third, construction preparation and obligations of both parties
Party A's work
1. Before the commencement of work, Party A shall register with the property management unit or the property owner. If it is necessary to change the structure and the nature of the use of the house, the unit with the corresponding qualifications shall be required to issue an appraisal and reinforcement plan. After approval by the real estate management department, the house decoration permit shall be obtained. single.
2. Party A shall make an on-site payment to Party B _____ days before the start of construction. Empty the houses, remove obstacles that affect the construction, and take protective measures for the furniture and furnishings that are left in the houses that can only be partially vacated. Provide Party B with water and electricity required for construction, and explain the precautions for use.
3. Coordinate the work of temporarily using common parts during construction and generating behaviors that affect neighborhoods.
4. Designated as a representative of Party A, responsible for contract performance, supervision, acceptance, change, registration procedures and other matters for project quality and progress.
Party B's work
1. Party A shall submit the construction drawings or practices to the scene, draft the plan and schedule, and submit it to Party A for approval.
2. Designated as a representative of Party B, responsible for contract performance. Organize the construction as required, guarantee the quality, quantity and complete the construction tasks on time, and solve all the matters that Party B is responsible for.
3. The structure and nature of the house shall not be arbitrarily changed without the consent of Party A and the approval of the local real estate management department.
4. Signed the “Residential Interior Decoration Management Service Agreement” with the local property management unit.
5. Strictly implement the regulations on construction site management, and must not disturb the people and pollute the environment.
4. Supply of materials: Materials provided by Party A: See Attachment File 2 “List of Materials and Equipment Provided by Party A”. The materials and equipment that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements and must conform to the state. Standards, quality environmental inspection certificate and product name, specification, model, manufacturer name, factory address, etc. with Chinese logo, shall not use the building decoration materials and equipment that have been eliminated by the state. It should be supplied to the site on time, and Party B should go through the acceptance procedures. If the materials or equipment supplied by Party A are inferior in quality problems or specifications, or if the relevant certificates cannot be provided, Party B shall promptly submit to Party A in writing, and Party A still indicates that it is used, and if it is approved in writing, it may continue to be used, resulting in engineering losses. The responsibility shall be borne by Party A. Materials provided by Party B: For details, please refer to the materials provided by Party B in the Attachment File 3 “List of Materials Provided by Party B”, which must meet the national standards, the quality and environmental protection certificate and the name, specification and model of the product with the Chinese logo, the name of the manufacturer and the site. Etc., shall not use the building decoration materials and equipment that the State has ordered to eliminate, and shall be approved by Party A. The residential decoration specified in this contract shall not be used for other purposes without the consent of Party A. If Party B violates this regulation, it shall compensate Party A with double the price of the misappropriated material. If the materials provided by Party B are fake or inferior commodities, they shall be compensated to Party A at double the price of the materials provided. Materials and equipment provided by Party B shall be prohibited if they do not meet the requirements of quality and environmental protection requirements or specifications. If it has been used, Party B shall be responsible for the losses caused to the project.
V. Safe production: The construction drawings or practices provided by Party A and the construction site shall meet the requirements for fire prevention and accident prevention, including electrical, communication lines, gas pipelines, tap water and other pipelines that are unimpeded and qualified. Party B shall take necessary safety protection and fire-fighting measures during construction to ensure the safety of operators and neighboring residents and prevent blockage of pipes in adjacent residential buildings. Accidents such as water leakage, power outages, and damage to items. All kinds of solid, flammable liquid and other wastes formed during the decoration process shall be piled up and removed according to the specified location, mode and time. If the above situation occurs and Party A is responsible, Party A shall be responsible for compensation; if Party B is responsible, Party B shall be responsible for repair and compensation. During the construction period, the party shall strengthen safety production and civilized construction. Party B shall be responsible for any work and death.
6. Changes in construction contents and construction period: During the construction process, Party A shall contact Party B in advance when designing revision opinions and additions and subtractions of the project. After signing the “Project Change Order”, the construction of the project can be carried out. If the cost increase or decrease or the construction period changes, it will be agreed by both parties. Party A shall compensate Party A for any loss caused by Party A's private agreement with the worker to change the construction content. Party A shall be responsible for the loss caused to Party B.
VII. Measures for project quality and completion acceptance
1. The project is based on the construction drawings, practice descriptions, design changes and the “Hangzhou Residential Decoration Engineering Construction Quality Industry Code” as the quality assessment acceptance criteria.
2. After the completion of the decoration and decoration project, the project quality and environmental protection requirements shall comply with relevant national standards.
3. Due to the quality of the project caused by Party A's reasons, the rework costs will be borne by Party A and the construction period will be postponed.
4. Due to the quality accident caused by Party B, the rework cost will be borne by Party B and the construction period will remain unchanged.
5. Party B shall promptly notify Party A to go through the inspection and acceptance procedures for concealed works and intermediate works. Party A shall not participate in the acceptance inspection according to the date specified in the appointment, and Party B shall organize the personnel to conduct the inspection and acceptance, and Party A shall acknowledge in writing.
6. After the completion of the construction period, Party B shall promptly notify Party A of the acceptance, and Party A shall accept the acceptance within seven days after receiving the acceptance notice.
Eight, liability for breach of contract
1. After the signing of this contract takes effect, both parties shall perform the terms and conditions stipulated in the contract and may not change or cancel it without authorization. Otherwise, the defaulting party will pay 10% of the total project cost of the other party, and bear other economic losses. .
2. Party A shall compensate Party B for the losses caused by the suspension of work or work due to the delay of construction or the suspension of work due to Party A’s reasons. For each day of work stoppage or work, Party A shall pay Party B ___ yuan; if Party A fails to pay according to the contract, each time the one day is overdue, the liquidated damages shall be paid _____% of the overdue payment.
3. If Party B fails to complete the work due to Party B's reasons, Party B shall pay Party A _____ yuan for each day.
5. Without the consent of Party A, Party B will arbitrarily change the structure and use nature of the house, and Party B shall be responsible for and bear the loss caused by the loss or accident.
Nine, engineering warranty
1. The “double-package” project for all-inclusive labor and materials shall be calculated from the date of completion and acceptance, and the warranty period shall be two years. The leakage resistance of kitchens, bathrooms and exterior walls with waterproof requirements is five years. The warranty period shall be calculated from the date when the residential interior decoration project is completed and accepted.
2. Due to the quality problem caused by Party B, Party B shall perform the repair unconditionally.
3. Damage caused by improper use of Party A, or improper use, is not covered by the warranty.
4. This warranty is valid after both Party A and Party B have signed and sealed.
X. Disputes Dealing with disputes over residential interior decoration projects may be settled through negotiation or mediation. If they are unwilling to negotiate, adjust mediation or negotiate, or mediation fails, the parties may deal with the following ____ methods: a. Submit to the Hangzhou Arbitration Commission for arbitration; b. Prosecuted to the people's court according to law.
XI. Other agreed matters
1. Party B will enter the construction after Party A pays the down payment.
2. no.
12. This contract is in one piece and has the same legal effect. The subordinated file of the contract is an integral part of this contract.
Party A: ___________________________
Name: ___________________
company name:_______________
address:___________________________
Legal representative: _____________________
Zip code: ______________________________
phone:___________________________
Business license number: _______________
Residential decoration enterprise qualification certificate number: _______
Bank of deposit: _______________________
account number:___________________________
Tax ID: ___________________________
Party B: ___________________________
address:___________________________
Attorney: _____________________
Zip code: ______________________________
phone:___________________________
___________year month day
Visa advice: _______________________
Visa ___________________________
Visa authority ___________________
___________year month day
Attached file
List of materials and equipment provided by the subsidiary file
List of materials provided by the subsidiary file
Subsidiary file four project change order
Subsidiary File Five Project Quality Acceptance Form
Affiliated file six engineering warranty
Subsidiary file seven construction business notice
recommended article
- Shanghai Participatory Housing Agreement
- Engineering construction supervision commission
- Demonstration text of construction project contract (2)
- Construction project demolition house contract
- Shanghai Housing Sublease Contract Sample
- Shanghai housing rental (commercial housing pre-leasing)
- Demonstration text of commercial housing contract
- Urban residential area owner management committee charter
- Construction Engineering Design Contract (3)
- Construction engineering technical consulting contract
- Qingdao Construction Project Construction Contract
- Room decoration commission
popular articles
- Construction project entrusted supervision contract (Chinese and English)
- Construction project construction contract (general)
- Describe the sentence of sweet-scented osmanthus
- Construction project demolition house contract (official model
- Hyun dance family impression sentence
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Ji Yulin's famous sayings
- Learning aphorism
- Construction engineering survey contract
- Praise the sentence of the motherland
- Qingdao Construction Project Construction Contract
- Non-mainstream aesthetic sentimental sentence
- Time maxim
- Singing the famous sayings of the motherland
- Love and happiness sentence 2019
- Have to say
- Real estate mortgage loan contract
- Sad sentence 2019
- Ministry of Construction, State Administration for Industry and Commerce
- Temporary wall construction agreement
- Admit mistakes
- Thank the teacher for the words
- Sentences depicting autumn scenery
- Consolation of a bad mood
- The sentence at the time of completion
- Franklin's famous words
- Team construction contract (construction team)
- Joe Gillard's famous saying
- Written to the son 2019
- Poems