Construction engineering technical consulting contract
Construction unit:____________________________
Address: ____________ Postal Code ____________ Telephone ____________
Legal representative: ____________ Position ____________
Consulting unit: ____________________________
Address: ____________ Postal Code ____________ Telephone ____________
Legal representative: ____________ Position ____________
In order to make the concept of ____ construction and installation engineering scientific, reasonable and reasonable in design and construction, the construction speed is fast and the error is small. The contract is fully negotiated by both parties.
Article 1 Party A shall, before ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Higher information is submitted to Party B.
Article 2 Party B shall conduct a feasibility study on the topography, geological conditions and architectural installation concept of the ________ building installation project according to the requirements of Party A, and finally prepare the design task book and the calculation form, in ________________ Delivered to Party A before ____ days.
Article 3 Party A shall pay Party B's consulting fee according to the engineering design fee standard stipulated by the competent national authority. Within ____ days from the date of signing this contract, Party A shall pay Party B ____ yuan first, and Party B shall pay Party B ____ yuan within ____ days after the design task book and calculation form are delivered to Party A.
Article 4 The travel expenses of the personnel who need to go to the field for investigation and data collection for the consulting project shall be borne by Party A.
Article 5 Party A’s liability for breach of contract
1. If Party A fails to deliver relevant files, drawings and materials to Party B at the time specified in this contract, Party B may post the time for delivery of the design task book and the calculation form according to the delay.
2. If Party A fails to deliver the consulting fee to Party B at the time specified in this contract, it shall be delayed by one day, and shall be fined ____‰ according to the delay.
3. If Party A interrupts the consultation request midway, Party B has already consulted more than half of the work, and all the consulting fees payable to Party B; the consulting work has not been more than half, and 50% of the total consulting fee is charged.
Article 6 Party B's liability for breach of contract
1. If Party B fails to deliver the design task book and the calculation form according to the time specified in this contract, it shall be delayed by one day and shall be fined ____ according to the total amount of the consulting fee.
2. If Party B interrupts the consultation midway, Party B shall pay a fine to Party B at the general consultation fee.
3. If the technical consulting service provided by Party B causes economic losses to Party A due to quality defects or faults, it shall be responsible for compensation. If a major accident is caused thereby and serious consequences are caused, the administrative responsibility or criminal responsibility of the principal responsible person shall also be investigated.
Article 7 Other Agreements ________________________________________
This contract shall not be changed at will from the date of signing. If there are any outstanding issues, they need to be resolved through negotiation between the two parties.
The original of this contract is in duplicate, one for each party, and one for each copy of the contract, one for each of the ________ construction engineering department, CCB ____ and other units.
Construction unit:________________________________
principal:__________________________________________
____year month day
Consulting unit: ________________________________
principal:__________________________________________
____year month day
Address: ____________ Postal Code ____________ Telephone ____________
Legal representative: ____________ Position ____________
Consulting unit: ____________________________
Address: ____________ Postal Code ____________ Telephone ____________
Legal representative: ____________ Position ____________
In order to make the concept of ____ construction and installation engineering scientific, reasonable and reasonable in design and construction, the construction speed is fast and the error is small. The contract is fully negotiated by both parties.
Article 1 Party A shall, before ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Higher information is submitted to Party B.
Article 2 Party B shall conduct a feasibility study on the topography, geological conditions and architectural installation concept of the ________ building installation project according to the requirements of Party A, and finally prepare the design task book and the calculation form, in ________________ Delivered to Party A before ____ days.
Article 3 Party A shall pay Party B's consulting fee according to the engineering design fee standard stipulated by the competent national authority. Within ____ days from the date of signing this contract, Party A shall pay Party B ____ yuan first, and Party B shall pay Party B ____ yuan within ____ days after the design task book and calculation form are delivered to Party A.
Article 4 The travel expenses of the personnel who need to go to the field for investigation and data collection for the consulting project shall be borne by Party A.
Article 5 Party A’s liability for breach of contract
1. If Party A fails to deliver relevant files, drawings and materials to Party B at the time specified in this contract, Party B may post the time for delivery of the design task book and the calculation form according to the delay.
2. If Party A fails to deliver the consulting fee to Party B at the time specified in this contract, it shall be delayed by one day, and shall be fined ____‰ according to the delay.
3. If Party A interrupts the consultation request midway, Party B has already consulted more than half of the work, and all the consulting fees payable to Party B; the consulting work has not been more than half, and 50% of the total consulting fee is charged.
Article 6 Party B's liability for breach of contract
1. If Party B fails to deliver the design task book and the calculation form according to the time specified in this contract, it shall be delayed by one day and shall be fined ____ according to the total amount of the consulting fee.
2. If Party B interrupts the consultation midway, Party B shall pay a fine to Party B at the general consultation fee.
3. If the technical consulting service provided by Party B causes economic losses to Party A due to quality defects or faults, it shall be responsible for compensation. If a major accident is caused thereby and serious consequences are caused, the administrative responsibility or criminal responsibility of the principal responsible person shall also be investigated.
Article 7 Other Agreements ________________________________________
This contract shall not be changed at will from the date of signing. If there are any outstanding issues, they need to be resolved through negotiation between the two parties.
The original of this contract is in duplicate, one for each party, and one for each copy of the contract, one for each of the ________ construction engineering department, CCB ____ and other units.
Construction unit:________________________________
principal:__________________________________________
____year month day
Consulting unit: ________________________________
principal:__________________________________________
____year month day
recommended article
- Shanghai housing rental (commercial housing pre-leasing)
- Shanghai Participatory Housing Agreement
- Construction Engineering Design Contract (3)
- Demonstration text of construction project contract (2)
- Urban residential area owner management committee charter
- Construction engineering technical consulting contract
- Shanghai Housing Sublease Contract Sample
- Engineering construction supervision commission
- Demonstration text of commercial housing contract
- Room decoration commission
- Qingdao Construction Project Construction Contract
- Construction project demolition house contract
popular articles
- Du Yuexi's famous sayings
- Sad love sentence 2019
- Taizai’s famous sayings
- I want to say something to the teacher.
- Temporary wall construction agreement
- Describe the fast time sentence 2019
- Construction engineering survey contract
- Bing Xin’s famous words
- Qingdao Construction Project Construction Contract
- The latest high school inspirational maxim
- Deaf people jingle 2019
- Thanks to the friend's words 2019
- Real estate mortgage loan contract
- Tao Xingzhi's famous sayings
- Construction project construction contract (general)
- Qq space mood phrase
- Team construction contract (construction team)
- Construction project demolition house contract (official model
- Teacher's famous saying
- Ministry of Construction, State Administration for Industry and Commerce
- Korean swear words
- a good saying that loves labor
- Construction project entrusted supervision contract (Chinese and English)
- 2014 is very touching words
- Contract conditions for construction of water conservancy and hydropower civil engineering
- Injured sentence
- Classical life motto
- Strong words
- College entrance examination inspirational quotes
- English famous words