Fan Wen Daquan > Contract Model > Construction Engineering Contract Model

Contract for termite prevention project for new (reconstruction, renovation, expansion) houses in Hanjiang District, Yangzhou City, Jiangsu Province


Party A: _________________________

Party B: _________________________

In order to protect the house from termites and to ensure property and personal safety, in accordance with the Ministry of Construction Order No. 72 "Regulations on the Management of Urban House Termites" and _________ requirements, in the service first, quality first The principle is to sign this contract for the termite prevention project of the following houses after consultation between the two parties.

The first basic situation of Party A's new housing project

project name

construction place

Total building area

Project opening date

From year to month

Project approval unit and document number

House structure

level

Housing construction number

Building times

The main purpose

other

Article 2 Prevention and Control Scope and Quality Standards

Scope of prevention: The grounding, wood components and some walls of newly built buildings are treated by spraying drugs to prevent the termites from harming the main body of the house.

Quality standard: After the prevention and treatment, the main body of the above-mentioned houses will not suffer termite damage within 15 years from the date of prevention of completion.

Article 3 Party A shall be responsible for matters

1. Provide the project approval document plan, structural plan and other related drawings and advance the project start date one week ahead of schedule, and notify the Party B three days in advance of the actual construction date of the branch project, so as to prepare for the preventive construction plan.

2. Do a good job in coordination and coordination with Party B, provide Party B with necessary construction conditions such as water and electricity, and urge the construction unit to provide Party B with necessary preventive construction.

3. During the contract period, Party B shall provide Party B with a description of the occurrence of the ant damage and provide Party B with the convenience of returning the visit to the preventive project. If the ant is caused by the decoration in Party A, Party A shall be responsible for its responsibility.

4. During the application of Party B, Party A’s unrelated personnel should withdraw from the application site.

5. The termite prevention fee for this project is charged according to the _________ file, ie __________ yuan per square meter of building area, total _______ _______ million _______ _______ _______ _______ yuan _______ corner _______ points, Party A shall pay Party B at one time when signing the contract. If Party A repeats the construction due to Party A's reasons, the additional costs shall be paid by Party A separately.

Article 4 Party B shall be responsible for matters

1. We must adhere to service first, reputation first, quality first, and do a good job in termite prevention construction management to ensure that preventive and treated houses do not suffer from ant damage during the prevention and treatment period of this project.

2. If Party A is unable to properly carry out termite prevention construction due to Party A's reasons, if the above-mentioned house has ant damage during the package period, Party B shall, with the cooperation of Party A, perform the remedy for the one-time killing of termites. If the ant is reoccurring, Party B shall charge Party A the corresponding cost of extinction according to the relevant regulations on the elimination of termites.

3. After the construction of the termite prevention project, Party B shall promptly issue the “Completion Report of the New House Termite Prevention Project” and the “New House Termite Prevention Project Completion Acceptance Form” to Party A as the basis for the completion and acceptance of the new house termite prevention project, and Regularly review and review the projects for prevention and treatment.

Article 5 Other agreed matters ________________________________________________________.

Article 6 This contract is in duplicate, Party A has two copies, and Party B is responsible for it.

Article 7 This contract shall come into effect on the date of signature by both parties, and shall terminate at the end of the period of prevention and treatment agreed upon in this contract.

person A person B:___________

Person in charge: _________ Person in charge: _________

Manager: _________________ Manager: ______________

Contact number: _______________ Contact number: __________________

Contact address: _______________ Contact address: _______________

_________ years _____ month _____ days _________ years _____ months _____ days

recommended article

popular articles