Building engineer self-identification
Part 1: Self-identification of construction engineers
Time flies, I graduated from the South China Agricultural University in June 2007 with a bachelor's degree in garden design. In July 2007, I started working in the garden room of Foshan Urban and Rural Architectural Design Institute Co., Ltd., and I have been working for one year in October 2008. In the course of more than a year, I not only deepened my understanding of the knowledge I had learned, but also had a better understanding of the knowledge that was not touched or touched in previous books. Since the work, under the cultivation and guidance of the leaders and supervisors, through their own efforts, both in learning and in work, they have made great progress and great gains. The work is summarized as follows:
In learning, since I joined the work, I have been strict with myself, taking my work seriously and working hard to improve my ability. At this point, the company gave me good conditions: a large number of practical engineering cases, which really have a good guiding effect for the graduates we just worked on; there is a wealth of books and materials that can give me a very good It is a good opportunity to open up knowledge and timely information and understanding of the development and changes of the industry. There is also a positive working environment and a high-quality staff team in the design institute to encourage me to continue to learn, constantly surpass myself and constantly improve myself.
At work, the first project I participated in was the design of the garden project for the Dongdong and Guidongyuan. In this project, I was familiar with the basic process of project design, and applied the Tianzheng architecture, cad and photoshop skills learned in the school to the actual situation. In the work, I learned a lot of practical experience, and I also know how to communicate with Party A and deal with the problems encountered in the design. The construction drawings of the last two projects were successfully completed in January of 2008 and July of 2008 and delivered to Party A. During this period, I have been working conscientiously with the contract work. I followed the supervisor's guidance arrangement. In the project, I clearly understood the project's detailed process of the project-expansion-construction drawing, and learned many specifications in the design. Strengthened the ability to interact with others and deal with problems at work. My professional knowledge and skills have been greatly improved during the direction of the supervisor and the communication with senior staff. After that, I also participated in the design of projects such as Limao, Bicui Huating, Jinxiu Huating and Beihuan Road. During this period, I paid a lot and gained a lot. After more than a year of work and study, I felt that as an engineering technician, I must be careful and careful, do every step of the work, and design the process. Be familiar, familiar with the drawings, familiar with the specifications, continue to learn and design related, professional-related knowledge, arm yourself with knowledge, and learn to communicate with others at work, how to behave, establish the right Outlook on life and values.
With the development of society, people's requirements for design quality are getting higher and higher. Quality is a solid foundation for the survival and development of an enterprise. The improvement of quality depends on the overall quality of employees and the improvement of technical management level. Competition, training high-quality, high-level professional technology and management personnel is the company's focus. In the past year's work, with the support of the leaders and the support and help of my colleagues, through continuous efforts, I have adapted to the pace of work and have a certain technical ability, but there are still some shortcomings in the future work. It is necessary to strengthen study, overcome shortcomings, and strive to continuously improve their professional and technical level. At the same time, I clearly understand that in order to adapt to the new situation of garden design, we must continue to strengthen theoretical study in the future, especially the study of new technologies and new theories. Require yourself, constantly seek truth and innovation, exercise and grow in practical work, accumulate work experience, cultivate work ability, and strive for greater achievements.
Part 2: Self-identification of construction engineers
In 2019, I served as the deputy chief engineer of the company's construction and installation and dean of the Jian'an Institute. Under the correct leadership of the company's party and government, the members of the united Jian'an Academy closely focused on various tasks and permeated the ideological line of facts in practical work. Grasping safety production, management, and focusing on strengthening the construction of the workforce, fully mobilized the enthusiasm and creativity of all employees, enhanced the cohesiveness and combat effectiveness of the overall team, and ensured the smooth completion of construction and work.
The construction and installation work in 2019 has created the best level in history. The enthusiasm of employees, the enthusiasm and initiative of the work are very high. The comrades almost gave up all the rest time and put them into the work. Through the joint efforts of all the staff, the output value is near. 240 million yuan, the profit level has increased significantly.
In order to ensure the quality of building installation products, we have formulated and improved management systems and standards in strict accordance with the requirements of the quality management system, such as process management standards, equipment management standards, technical standards, and personnel work standards. Always adhere to the "quality first" policy, to ensure quality as the center, the combination of prevention and inspection as a means, the participation of all employees, strictly implement the various management systems, clarify the responsibilities of personnel at all levels in product production and management, and strengthen Check and accept the quality of the results. The construction of the field industry strictly followed the procedures and standardized operations, fully implemented the quality standardization work, strengthened the equipment management and personnel training, reduced the quality accidents, and significantly improved the quality of work. The excellent rate of achievement is 75%, the product qualification rate is 100%, and the service satisfaction rate is over 90%.
In the safety management, we strictly carry out the work in accordance with the requirements of the safety production management system, adhere to the principle of “safety first, prevention first”, strengthen safety training and safety education, strengthen the implementation of safety measures in production activities, and clarify the responsibility of safety posts. System, strengthen on-site safety inspections, timely rectification of problems in the safety production investigated and inspected to ensure safe production, no major safety accidents.
Summarizing the work of the year, there are also some shortcomings. The internal management of the unit is to be strengthened. The corresponding rules and regulations need to be further improved, and the study should be strengthened. Communication and contact should be strengthened in the work. In the future work, I will carry forward my achievements, overcome the shortcomings, and do my job well.
Part 3: Self-identification of construction engineers
Through this month's internship, I have gained a lot in practical knowledge. The instructions I have learned from textbooks have also been confirmed in practice, and I have learned a lot of concrete construction knowledge, which is more flexible and operative than theory.
During the internship, I established a good teacher-student relationship with technicians and workers. Exchange ideas with each other and respect the guidance and arrangement of the internship instructors. Upon entering the internship site, first of all, I have an understanding of the basic situation of the whole project and the construction site. I have seen the construction and structural construction drawings of the project, and understood the type, structure, scale of the project, production process, building structure and structural system. The characteristics of the foundation and foundation, as well as the progress of the project, the provision of technical strength and the quality of the workers, as well as the main problems existing in the project and the measures to be taken. By looking at the construction drawings, on-site investigations, and talking with workers and technicians, there is a basic understanding of the project, that is, knowing that the project has completed those tasks, and which tasks are to be completed, which tasks I will participate in.
In the whole construction process of any project, civil construction plays a vital role. It is very important to understand the whole construction process. From the basic to the main body, every link is very important. The foundation is related to the stability of the whole project. The foundation is not well played, and the beauty of the main body can not change the fate of the entire project. Once the foundation is out of the problem, the whole project is a bean curd residue project;
The building determines its function from the beginning of the project. The design is only to fulfill its functional requirements. The construction is the value period to realize it. It is also the main process of capital consumption. Therefore, the quality must be guaranteed throughout the construction process. Therefore, obeying the construction engineering program is a natural requirement.
Construction must adhere to the process of “exploring, redesigning, and post-construction first”. Never reverse it. Otherwise, some problems may arise, and it is too late to regret it.
When I came to the construction site, the engineering foundation had already been set up. I only witnessed the whole process of the main construction. The pillars were first tied with steel bars in the formwork and then poured concrete. The construction of the beam was first to support the beam bottom mold and then to tie the beam. Reinforcement, the side mold of the beam, and then the side mold of the beam. Then the template assembly of the plate is carried out; finally, the concrete pouring work of the beam plate is carried out; the following problems often occur in the construction concrete pouring operation: the dimensional deviation of the honeycomb, the leakage rib, the hole, the gap and the slag layer, and the beam-column connection The deviation of the flatness of the oversized, cast-in-situ floor and stair steps is too large.
During the internship, I compiled more engineering materials, such as "Application for Concrete Watering", "Concealed Engineering Inspection Record", "Engineering Materials Entry Inspection Form", "Materials, Construction Parts Access Inspection Record" and so on. For example, “Application for Concrete Watering”, the construction team will pass the project department and supervision after the steel bar is tied. The project staff of the project department will report the quantity and location of the required concrete to the concrete mixing station. Then, the concrete transport vehicle will be submitted when entering the site. For the opening of the concrete, such as the small ticket, the project department fills in the watering application and submits it to the supervisor for filing. Through the collation of these materials, I have learned about the relevant programs and specifications for engineering construction.
During the internship process, I also learned about the organization of the construction industry and the way in which the business is managed. Including the organization management system of the construction unit, the functions and related relationships of each department and the composition of the construction project manager department, and the responsibilities and business scope of the technical personnel at all levels, as well as the responsibilities of the parties in the construction project management.
This internship made me deeply understand the lack of knowledge, and there is still a lot of knowledge to learn, both in books and in practice. It has enhanced my confidence in returning to school and working hard to learn. I took advantage of this internship to get in touch with the society and got a good workout, which clarified the direction that should be developed in the rest of the university life. And it really makes me like this industry, I will work hard to improve myself, in order to have better development in this industry in the future.
Chapter 4: Self-identification of construction engineers
Since I joined the work, I have strictly abide by the laws and regulations of the country, and have never participated in various activities that violate laws and regulations, and the personal work summary of construction engineers. Resolutely support the leadership of the Communist Party of China, adhere to the party's reform and opening up, take the "three represents" spirit as the work program of its own work, and make its due contribution to building China's distinctive socialism. I have strictly abide by the rules and regulations formulated by the unit, strictly obey the self-discipline, treat others with wideness, and play a leading role. In my work, I continue to study, research, sum up experience and lessons, from a "outside the door" in the construction industry to a full-fledged project manager with professional technical capabilities and management capabilities, independently undertaking housing construction, bridges, roads and The construction of drainage works has achieved great results in political thought, professional ethics, professional level, etc., and is summarized as follows:
I. Political Thoughts In my work, I strongly support the party's policies and guidelines. Every day, I insist on watching news and TV programs, care about and learn about the current affairs of the country, and apply the party's political ideas and guidelines to the construction of the project. The personnel conduct seminars and organize project staff to learn and publicize the party's policies and guidelines. I carefully study and understand the party's "Three Represents" and "16th National Congress" spirit, regard the "three represents" as the yardstick of our work, and take the "16th National Congress" spirit as the goal of our struggle. Building a "small well-off" social life, and contributing a little to the cause of "adding bricks and tiles".
Second, the work attitude and career path Since joining the work, I like the construction industry, work hard, hard work, and have a beginning and end. For projects that are harder and harder, I have insisted on completing them satisfactorily and making achievements, never thinking about personal gains and losses. I often work overtime, and I am working hard all night. Whether in the cold wind, under the scorching sun, or under heavy rain, I stick to my post and direct the completion of each project. I look at a tall building and a strip of silver ash. When the completion of the avenue was completed, I felt extremely proud and glorious in my heart. I have received countless hardships and sweats from my society, and I have been praised by the society. I have no regrets and no satisfaction in my heart.
Third, the level of knowledge, professional ability In the work, I continue to learn cultural knowledge and professional knowledge, and strive to improve their level of knowledge and special ability. I have been participating in the national e-professional self-study exam since October 1991. Now I have obtained the certificate for 6 courses, and I have used the computer as a compulsory course for my work. I have been able to use the computer for office work. For the new norms, new standards and new quotas of the construction industry, every time I come out, I will purchase and study and study carefully, master new norms, new standards and new quotas, and apply norms, standards and quotas to the construction of the project. Lessons learned and lessons learned. When each project is completed and accepted, I carefully prepare the project acceptance records, organize them into a book, and deposit them into my own project completion acceptance record file. I often analyze and study the completion acceptance records and find out what problems exist in the construction of the project. What is worth improving and what is worth promoting. Some of the technical treatments summarized in my project management are summarized as follows:
1. The prefabricated joints in the brick-concrete structure are cracked. The precautionary measures are as follows: the prefabricated slabs are cleaned and dried, then the bottom mold is supported under the slats, and the slabs are covered with cement slurry, and then the seam is filled with 1:2.5 cement mortar. The height is 1 /3, vibrating and compacting, the sand is best to use coarse sand, and finally the spar is filled with fine stone shovel and vibrated and compacted. Strengthen conservation. Thus, the seam is not easily cracked.
2. In the bridge construction, the retention and rafting sequence of the splicing trough: the bridge closing trough should be left at one third and the top of the span of the bridge arch, and the arch is prohibited from staying.
3. In the road construction, the treatment method of the expansion joint: the traditional treatment method of the expansion joint is to set the force transmission rod, and often the treatment will not be broken, which will affect the appearance and function. I introduce the vibrating beam type expansion joint, which does not need to set the force transmission rod. The method is as follows: the base layer is grooved at the expansion joint, and its size is length × width × thickness 2. Expansion joint length × 50CM × 20CM, pouring after trenching C30砼, whose surface is flat with the base layer, then lay two layers of oil felt on the surface of the crucible, and finally pour the pavement, and use the wood wool board or foam board to separate the telescopic area. The width is 2CM, and the asphalt is filled with asphalt and grease. . IV. Project Management The construction project management is a complex and varied work. The quality of management is directly related to the economic and social benefits of the project. After years of management work, I believe that project management is a system that makes overall arrangements, rational use, and comprehensive management. Personnel, materials, machinery, articles, etc. must be carefully organized, deployed, and rationally utilized. We will ensure the safety production to the maximum extent, adhere to the principle of "safety first", ensure the quality of the project, adhere to the principle of "quality for survival", strictly control the quality of the project, strive for rapid progress, comply with the construction contract, and reduce the project cost. In the shortest time, create the best quality, safest production, and lowest engineering cost. The construction industry is a very knowledgeable industry involving a wide range of knowledge. It can be said to be an industry that is "old and old". In the future work, I will study cultural knowledge and expertise more hard. , continue to practice, do a good job, and make more contributions to the society.
I have been identified as an assistant engineer in December 1999. I was identified as an assistant engineer in Hebei Province. I was successively in Hebei Second Engineering Construction Co., Ltd. and Tangshan Modern Construction Engineering Co., Ltd., and in September 2000, I worked in Tangshan Modern Building Installation Engineering Co., Ltd. Section chief. In the meantime, I have worked hard to delve into professional and technical knowledge, and strive to promote "new processes, new structures, new materials, new equipment" in the process of technology management, and devoted my passion to technological innovation and technological progress. After serving as an assistant engineer in professional and technical positions, he served as the technical person in charge of the Fengnan City State Taxation Bureau residential residential area project and the Tangshan No. 1 Middle School Building Project. After the completion of these two projects, they were rated as Tangshan City Quality Engineering. And the second teaching building project of Tangshan No. 1 Middle School was awarded the 2001 Hebei Provincial Quality Project on the basis of the evaluation of the municipal excellent project. In the few years of construction first-line exercise, through the theory and practice, the professional theoretical knowledge learned during the university was quickly transformed into business ability. As the company's technical and quality management department, under the direct leadership of the company's chief engineer, the company is meticulous in technical management and strictly controls the quality of the project. After several years of hard work, the company has established a strict management system and obtained the three major certifications of internationally recognized construction companies: quality management system certification, occupational safety and health management system certification, environmental management system certification, which is the first in Hebei Province. A construction company with three certifications. In the past five years, in the process of contributing to the development of talents and talents for the development, the professional and technical capabilities have also been enriched and improved.
In short, I have done some useful things in the past five years, but there are still many problems to be improved. The professional skills for several years are as follows:
I. Actively promote the use of "four new" technology to create architectural fines In December 1999, I was the technical director of the second teaching building project department of Tangshan No.1 Middle School. The quality of engineering is the life of a construction company. To obtain good engineering quality, technical management personnel are required to have an advanced sense of creating excellent engineering. As the technical leader of the project, I will take the lead in setting up and improving the project. The relevant technical and quality management systems of the Ministry. In accordance with the project construction method, I will be the first to decompose the project quality objectives into various professional and technical positions, and organize the construction according to the requirements of technical posts. It has successively established a series of management systems that are conducive to ensuring the quality of the project, such as the technical review system, the project quality inspection system, the concealed acceptance system, the quality common disease control measures and the semi-finished product protection measures. According to the characteristics of the large opening of the project and the large amount of concrete pouring, the template support uses the tool-type quick-release system, and the plastic-coated bamboo stencil is used together to ensure that the gap between the bamboo stencils is not more than 1mm; the height difference of the joint is not more than 1mm, and the surface is flat. No more than 2 mm, the ceiling can eliminate the plastering process, which can save the cement dosage, and completely eliminate the quality hidden danger of the ceiling plastering, and achieve both economic and social benefits. The surface of the inner and outer wall tiles is smooth, clean and consistent in color. The joints are densely packed, straight, wide and narrow, and the colors are consistent. The roof waterproof layer is carefully treated, and the method is consistent and beautiful. The doors and windows are clean, without scratches and bumps. Injury, the surface of the rubberized coating is smooth, flat, uniform in thickness, and free of pores; the width and height difference between the two steps of the stair step are not more than 10 mm, the tooth angle is neat, and the anti-slip strip is straight. During the construction process, the construction is strictly in accordance with the design and construction drawings and the requirements of the national codes, regulations and general atlas, and each sub-project is carefully completed in accordance with the requirements of the details of the creation of fine engineering projects, achieving the quality goal of “creating high standards and high quality projects”. Through the direct participation and control of the engineering technology, the quality, progress and benefits of the project have achieved good results. The second teaching building project of Tangshan No. 1 Middle School won the 2000 Best Quality Engineering Gold Medal and the 2001 Hebei Provincial Quality Engineering Award.
Second, efforts to delve into the professional and technical business, do a good job since the work of Tangshan Modern Building Installation Engineering Co., Ltd., the work is even better. After being transferred to the head of the technical quality department, it coincided with the establishment of the iso9001 quality management system. Due to the tight schedule and heavy tasks, the comrades voluntarily gave up the rest time and worked hard on the preparation and revision of the quality management manual, program files and work instructions. Adding a little, no complaints, fully embodies the vanguard and exemplary role that a young professional technician should have. In the context of establishing a quality management system, I formed the article "Analysis of Building Quality Management System" and won the first prize of Hebei Province Construction System Technology. In the daily work, the comrades have a solid professional knowledge and theoretical foundation, work in the water, from the construction site technical guidance and quality inspection and verification of the construction technical data, and all the work is well-versed. The technical files and various application materials formed in the paper have been structured with strict structure, terminology, unique insights, and arbitrarily determined. The technical files sent to the city for communication have been repeatedly controlled by the Tangshan Construction Bureau and the Tangshan Quality Supervision and Inspection Station. The praise of the leadership has won honor for the company. With the gradual deepening of the company's management system reform, the leaders decided to start the oshms occupational safety and health management system certification and the iso14001 environmental management system certification. In the process of establishing the above two management systems, the comrades have continued to invest in system file preparation, initial state evaluation, identification of major hazards and environmental factors, and development of management plans, which have made outstanding contributions to the successful registration of enterprises. . In the process of participating in the establishment of enterprise quality management system, occupational safety and health management system and environmental management system, I also learned a lot of international management knowledge, and as the internal auditor of the three systems, I also always have three management systems. The continuous improvement has made painstaking efforts.
Third, the implementation of paperless office, using high-tech means to improve the economic efficiency of the company. While concentrating on the professional and technical knowledge, the comrades also strive to explore and study the software and hardware knowledge of the computer, Microsoft Office series office software and autocad series The software is successfully used in daily construction management. In continuous learning and practice, it strives to promote the paperless management of engineering management materials, applies word completion word processing, prints various record forms and text materials, and uses excel to complete engineering information. Storage and analysis processing, providing quantitative basis for engineering decision-making; applying powerpoint to produce electronic slides for training, using modern multimedia forms, vividly and vividly explaining construction technology knowledge and construction structure common sense, completely changing the way of traditional education and training To make high-tech, modern technology truly serve production and quality management. Autocad computer-aided design. The promotion of the drawing software in the work, so that the construction technicians completely rid the burden of the cumbersome drawing board and pencil hand drawing, making engineering drawing very easy. By studying and delving into computer software and hardware knowledge, I have completed the construction of the internal computer network of the enterprise, enabling the computers of each department to realize resource sharing. In addition to sharing data, I can also share such as printers. Hardware devices such as plotters save a lot of valuable money and achieve good economic benefits. As for the deeper application, such as sharing internet connection, the use of netmeeting to realize video conferencing and other connection means is more promising. All of this has laid a solid foundation for paperless management of the files within the final enterprise. For the construction industry to achieve paperless office, I wrote a "Building Enterprise Office Area Network - Building an Example" article; in order to meet the needs of enterprise technology and technical literature retrieval, I wrote a "Web browser query engineering information resources" article These two papers were reported to the Construction Department of Hebei Province to participate in the scientific and technological review of the construction system of Hebei Province, and both won the second prize.
4. Adapting to the needs of the development of the times, constantly learning and constantly updating knowledge. The development of modern society is changing with each passing day, and knowledge is updated very rapidly. If new knowledge is not added in time, and continuous learning and communication are not frequent, it will not be able to adapt to the needs of enterprise technology management. It will be eliminated. To this end, I use every opportunity to participate in various training courses and technical exchange activities. During his tenure as an assistant engineer, he has participated in various special trainings organized by relevant departments for more than ten times, and obtained qualification certificates for quality inspectors, construction workers, safety officers, civil engineering three-level budgeters, and information workers; obtained internal audit of ISO9001 quality management system. Member, ISO14001 Environmental Management System Internal Auditor, oshms Occupational Safety and Health Management System Internal Auditor Qualification Certificate; obtained the qualification certificate of the 贰-level project issued by Hebei Provincial Construction Department. Through various continuing re-education training courses, I have always maintained a strong desire for knowledge, and at the same time, I have continuously improved my professional skills. The above is the situation of the main technologies I have been engaged in for the past five years. By learning from books, learning from practice, learning from others, and adding my own analysis and thinking, I have indeed made great gains and progress. Achievements and shortcomings exist at the same time, and the lessons are accompanied. I will continue to work hard to overcome the shortcomings, learn the lesson, and do my own better.
Chapter 5: Self-identification of construction engineers
Years of large-scale project construction site management experience, responsible for engineering technology, schedule, quality, cost, safety and other aspects of management. Familiar with building construction specifications and acceptance specifications; familiar with the whole process of project operation, master the technical requirements of each project. It can effectively organize, lead, coordinate the work of the general contractor and each subcontracting unit, strictly fulfill the contract requirements, and complete the set quality, progress and cost targets. Dedicated to work and lead by example, it has strong team coordination and management capabilities. Holds the intermediate professional title of the construction profession and obtains the national first-class construction engineer qualification certificate. Skilled in using autocad, office series office software.
I have a wealth of knowledge, excellent self-regulation, good health and good working conditions for a long time. Indifferent personality, growing in military families, strong self-discipline, teamwork awareness. The work attitude is serious and responsible, and the duties of the post are perfect. He has worked in China Construction First Bureau, Zhongjian-Dacheng Company and other units. He has been engaged in on-site management of construction general contractors for a long time. He is familiar with the project management process of the general contractor, the contractor and the supervisor, and the construction organization, construction process, communication and coordination. I have deep experience in other aspects. In the first batch of XX, I took the national registered first-class construction engineer and worked hard to become an outstanding project manager, reflecting my life value.
In XX, he joined the work until April of XX, and has been working in the project department of Beijing Construction Engineering Construction Engineering Co., Ltd. Mainly involved in bidding, writing plans and cross-border, drawing on-site construction drawings, handling negotiations, dealing with supervision, Party A, and drawing drawings. From April XX to present, he worked as an on-site civil engineer in the construction of an electronic factory building.
I have been working for nearly 20 years and have worked in the construction field for many years. From initial maintenance and leaking to supervising high-end decoration, high-rise buildings, municipal roads, bridges, etc., I have experienced extensive experience as a infrastructure engineer and construction worker. Deputy manager of the project, project manager, project director and other positions. From the grassroots to the management, it is under heavy work pressure.
I know that only with mastery of professional skills, good communication skills and teamwork spirit can we work effectively. At the same time, I also used my spare time to actively improve myself, completed the self-study undergraduate course, and successfully passed the second-level construction division examination. I am eager to have more room for development in the new environment.
He has also worked in Beijing Construction Engineering Group Construction Company for nearly 20 years. He has been the chief technical officer and project manager of the project for a long time. Among them, he has served as the chief engineer of more than 200,000 square meters of project and more than 100,000 square meters of project. Manager with extensive experience in construction practice. Active and motivated, with good interpersonal skills.
recommended article
- Excellent graduate self-identification
- [Boutique] Correspondence self-identification
- [Boutique] self-identification
- [Boutique] The latest work self-identification
- [Boutique] self-study exam self-identification
- Surgical practice self-identification
- Self-evaluation of Chinese graduates
- High school military training personal identification
- New teachers turn to self-identification
- Obstetrics and Gynecology Practice Self-identification
- Fresh graduate self-identification
- [Boutique] Graduate self-identification
popular articles
- Teacher's famous saying
- Injured sentence
- Party school students self-identification
- Big four school year identification
- Self-identification during school
- Party member review self-identification
- Student cadre self-identification
- Accounting internship self-identification
- The latest high school inspirational maxim
- Sad love sentence 2019
- Postgraduate ideological and political self-identification
- Tao Xingzhi's famous sayings
- I want to say something to the teacher.
- English famous words
- Taizai’s famous sayings
- Strong words
- Qq space mood phrase
- Buyer self-identification
- Thanks to the friend's words 2019
- Du Yuexi's famous sayings
- Describe the fast time sentence 2019
- Deaf people jingle 2019
- 2014 is very touching words
- Party school learning self-identification
- a good saying that loves labor
- Bing Xin’s famous words
- College entrance examination inspirational quotes
- Classical life motto
- [Boutique] self-identification 300 words
- Korean swear words