Supervisory information staff year-end summary


In January XX, I served as a xx community information clerk. I took over the relevant materials of the four buildings in the community from the former staff, and formed, accumulated, and organized the data of the first, eighth, and subcontracting projects during the construction phase. Supervise and inspect with the archives to ensure the integrity and accuracy of the construction materials and meet the relevant requirements.
In September 2000, the subcontracted engineering materials and supervision materials successfully passed the pre-acceptance and acceptance of the archives to meet the eligibility criteria, and also passed the quality inspection station acceptance. The smooth acceptance of the information laid the foundation for the completion and acceptance of the project. The smooth passage of the information was achieved by the full cooperation of the various construction units, but certain achievements were made, but there were also some shortcomings.
During the semi-annual period of the supervision department, I have done my due diligence from supervising and inspecting the construction materials of each construction unit or doing the supervision information of the supervision department. My main job as a supervisor is as follows:
1. Cooperate with professional supervision engineers to strictly control the engineering materials of each construction unit. Because the engineering data is a true reflection of the results of the construction of the project, the information is formed in the form of various forms of information in the construction process, and only with the supervision engineer, the construction unit information staff to fully complete and do the job. 2. Responsible for the supervision of supervision materials, and collect, organize and archive supervision materials. The supervision data is a true record of the supervision and monitoring during the construction of the project, and is a systematic project. It involves the substantive work of the construction unit, construction unit, construction unit, design unit and other engineering construction units, and is a sign of scientific, standardized and legalization of supervision work. The supervision data reflects the level of supervision work and is an important basis for measuring and assessing supervision work.
3. According to the contract, in the survey and design stage, the formation, accumulation, organization and archiving of survey and design files.
4. Prepare meeting minutes and supervision monthly report. The supervision monthly report is a summary of the project progress and supervision work within one month of the supervision department. It is also an important basis for the relevant departments to inspect and evaluate the work of the supervision department. Therefore, it is very important to do this work well. It is also very important.
5. Transfer the supervision materials listed in the receiving scope of the Urban Construction Archives to the Urban Construction Archives in accordance with the data regulations. Only after all the previous links have been completed can the project be smoothly transferred to the archives, and the supervision work will be completed smoothly.
There are also many shortcomings in the completion of the above work:
First of all, there is a certain slack in the inspection of the construction unit's engineering materials. Often the construction unit reports the project information to the supervision department after the construction is completed. The project data shall be collected, collated and handed over as required by the progress of the project.
For the supervision and management of construction units to do a good job of engineering materials, so that the project information is true, effective and complete, there are also deficiencies. The construction unit does not attach importance to the compilation of engineering data, and the engineering materials do not use engineering materials to make information, so that the data cannot be Unified governance.
The preparation of the supervision monthly report is incomplete. The construction unit can also cooperate with the supervision in a timely manner to make a monthly report. When the project is nearing the end of the project, it will start to delay, so that the supervision monthly report cannot be collected and compiled in time, and a complete supervision monthly report is required. Fully cooperate.
Here, I also made a small suggestion to the supervision department. Since taking over the supervision information, the company has no leadership of the data clerk, lacks a formal data room, and many materials are not piled up, causing many data to be lost. The formation and management of engineering materials requires a long process, and the personnel who manage the materials are also frequently replaced, which makes it difficult for the next one to take over the governance work.
The above is the problem I encountered in the work of the supervision department in the past six months. It is also the shortcoming in the work. A professional data administrator is trained in the long-term work practice, whether it is construction or not. Data, supervision materials, and construction materials can all be well managed, and although I have been working on data management for four years, I have some experience in data management at different levels. However, there is a certain gap in achieving a professional information staff.
Summarizing the work that I have done in the past six months, I have met with different levels of familiarity and improvement in terms of taking over the supervision and supervision materials. Faced with the new construction period is about to begin, I will do my best to do every data management work.