Work Summary > Summary of Rural Agricultural Work

Summary of township flood control work


In XX, under the leadership of the county party committee and the county government, the party committee and government of the town of xx took the "flood prevention and protection" as the main task, earnestly carried out flood prevention work, implemented various flood prevention measures, carefully organized and carefully deployed to ensure completeness. The summary of the flood prevention preparation work in our town is as follows:
I. Arrange early, implement early, and do a good job in preparation for the work. The water resources in our town are very rich. There are 2 rivers and 236 large and small ponds. In order to do a good job in "preventing floods, resisting major disasters, and looting big risks" At the beginning of the year, early arrangements were made for flood prevention work, a flood prevention work leading group was set up, members of the flood control headquarters were adjusted, the flood prevention work plan was improved, work measures were formulated, and the flood prevention responsibility system with the main leadership as the core was further fully implemented. When the idea is in place, the measures are implemented, and the village-level flood prevention plan is improved, and the responsibility is implemented to the people. The leaders have realized the position, the organization is in place, the responsibilities are in place, and the measures are in place to ensure the full transition.
1. Unify thinking and raise awareness
Xx Town carefully organized the work of the higher-level flood prevention work conference and archives, timely conveyed the instructions of the superiors on flood prevention work, and required all cadres and workers to overcome the paralyzed thoughts and luck in the flood prevention work, and clearly realized the flood prevention situation this year and conscientiously implemented the flood control responsibility system. It is no small matter to firmly establish flood prevention work. It is truly based on preventing floods, resisting major disasters, and looting major risks, further enhancing ideological understanding and actively doing various tasks.
2. Formulate emergency rescue plans, organize business skills training to address the current situation of flood prevention work in our town, and combine the work and operation situation last year, xx town carefully revised the XX year flood prevention and rescue plan and emergency plan. Organized the militia emergency rescue team to carry out flood control drills and organized 4 concentrated business skills training.
3. Implement the flood control responsibility system and strengthen inspection and supervision work
Xx Town actively implemented the flood prevention responsibility system and flood prevention duties of the leadership team, all units and village leaders, and timely reported and feedbackd. At the same time, strengthen the inspection and supervision of the flood control responsibility system, and formulate an inspection and supervision system, and require the town supervision and inspection team to conduct inspections at any time to further implement flood prevention duties.
4. Seriously prevent floods and disciplines, strengthen the flood control duty in accordance with the relevant provisions of flood prevention work, xx town timely revised the flood control duty system, implemented the flood control duty system, implemented flood control duty, on duty, and shift system. Adhere to the 24-hour duty system. The duty officers strictly abide by the flood prevention work system, adhere to the duty position, earnestly perform duty duties, closely monitor the weather changes and public opinion development, timely grasp and report important situations to the higher authorities, report the rain rainfall in a timely manner, and report the situation in a timely manner. accurate.
5. Strengthen the monitoring and management of geological disasters.
In the flood season, the staff will patrol the mountain to check the whistle, timely discharge the hidden dangers in the dangerous slopes, earth and rock flow, collapse and other dangerous sections, monitor the disaster changes at any time, report them in time, and the village team leader is responsible for monitoring, and do a good job in flood prevention and rescue teams, emergency materials and emergency Prepare a series of measures such as communication facilities and backup power supply, and do a good job in alleviating the floods. Once the disaster occurs, immediately invest in disaster relief and report the disaster situation to the flood control department.
Second, the existing problems
1. Due to the special geographical location of our town, there are two river courses, and it is difficult to prevent floods.
2. Lack of capital investment, insufficient strength in emergency rescue materials and personnel training.
Third, the future work plan
1. Conscientiously implement the spirit of the Archives Conference on flood control and drought relief at the higher level, guided by the important thinking of “xxxx”, and based on the effective maintenance of the interests of the people, continue to improve the flood prevention work plan and implement the flood prevention responsibility system.
2. Implement the management method of the target responsibility system, shift the focus of work to the village level, and implement group defense.
3. Strive for funds from relevant departments at higher levels, increase preparations for flood control materials, and improve various flood prevention facilities.
4. Strengthen the training of the flood control and rescue teams, and strive to improve their overall quality, so that the flood prevention team can draw it, use it, and work.
5, anti-mite work to achieve early arrangements, early implementation, work in place, responsibility to people.

recommended article

popular articles