Work Summary > Summary of Rural Agricultural Work

Summary of the pilot work of the town people's government on the construction of new rural areas


According to the work requirements of the municipal party committee and the government on the construction of 14 new rural construction demonstration sites in Xikang, the town xx new rural construction project is included in one of them. Under the guidance of the higher level government and various departments, our town combined with the actual situation of the xx project, in accordance with the 20-word policy of the new rural construction, earnestly done the planning and construction of the demonstration site, worked hard, and made great efforts to make the pilot work Results. The pilot work is summarized as follows: 1. Strengthening leadership and implementing responsibility The Party Committee and the government have studied and established a new rural construction demonstration team leading group with the town party committee secretary as the team leader, specifically responsible for the planning and implementation of the new rural demonstration project area. At the same time, the relevant village has also set up a working group with the branch secretary as the team leader, and implemented the township cadre Baocun, the village cadre package group, and the group cadres to enclose the households, clear responsibilities, and responsibility to people.
Second, scientifically formulate the construction plan and combine the actual situation of the xx new rural construction project area, scientifically compile the "Xxx village socialist new countryside "xxx" economic and social development plan", "xx new central village supporting construction plan", "xx village control The new rural construction plan, such as “Detailed Planning”, “XX Village Industry Development Plan”, “xx Village Labor Training and Transfer Employment Planning”, provides scientific and powerful guidance for the pilot work of new rural construction.
Third, the implementation of the demonstration site construction situation, solid land development, improve xx production conditions. Xx land consolidation project total investment of 30 million yuan. The implementation of the project to change the dry land area of ​​2154 acres of terraced fields, 922.6 acres of grids, 2813 acres of agricultural land, 491.9 acres of homestead, 331.5 acres of wasteland. The project area will be rehabilitated by 21,104 meters, of which the “u” type channel is 12,428 meters long and the slurry channel is 8,776 meters long. The project has built a new reservoir and 21 remediation of the field roads. The cement road is 3.0 meters wide. The newly-built cement road is 1,526 meters long and the road is 2,117 meters. At the intersection of the road and the channel, the culvert is set at 150 meters and the Tiandao Bridge is located. Through land consolidation, the agricultural production conditions in the demonstration area have been effectively improved and the infrastructure level of the demonstration area has been improved.
Actively implement the construction of new villages. In conjunction with the land consolidation project, a xx central village was constructed. The construction of the central village has an investment of 11 million yuan, covering an area of ​​acre, with a construction area of ​​30,468 square meters, and 133 households with concentrated residence, accounting for 23% of the total number of households in the village. The infrastructure such as sewage and roads in the central village was improved, and the activity room of the standardized village committee was built to enable the people of Changba to enjoy the fruits of social development. The main project of the construction of the central village has been completed, and decoration and style are being built. Some farmers have already stayed.
Vigorously develop scale industries. Developing scale industries is an important part of the construction of new countryside and a fundamental guarantee for the construction of new countryside. In combination with land consolidation projects, we will promote the rational circulation of land, introduce owners to develop bean planting, build a demonstration base of 200 mu, and achieve good economic benefits. Actively cooperate with Datong Silk Co., Ltd. to develop a good variety of mulberry, build a 300-mu mulberry mulberry base, develop a sericulture industry, and at the same time make a plan to build a large-scale sericulture housing to achieve scale development. Vigorously develop dairy farming, select 100 groups to build 100 standard dairy farms, establish 50 acres of dairy farm grassland base, and have now achieved 60 cattle breeding. A total of 1,000 mu of giant pythons were planted in the village of Guangba, and the base of the stalwart forest was established. Guide farmers to develop commercial rabbit breeding, relying on Datong Silk Co., Ltd. to realize mulberry farming and raising rabbits. This year, 20 large households have been developed.
Seriously grasp the development of social undertakings. Actively carry out peasant vocational skills training and strengthen vocational education construction projects. XX and XX carried out six phases of labor training in two years, training 1,600 people, effectively improving the quality of labor and labor skills, and achieving 300 training and employment. Combine land consolidation to build village health stations and village cultural activity rooms to provide quality services to the public. Implement comprehensive rural environmental improvement, improve the rural environment, and change farmers' bad living habits. Construction of a planned birth culture compound, a new “three-in-one” base for family planning and birth, and help 30 family planning families to develop their economies. Actively implement village self-government, publicly promote the direct election of village branch secretary, implement the village committee election democratic elections, open village affairs, and promote democratic self-government. Formulate a democratic management charter for the central village, sign an agreement on village self-government, and guide the inhabitants to implement self-education and self-management.
Fourth, there are problems
1. The infrastructure and public facilities of the central village need to be further improved, and there are insufficient funds for follow-up;
2. Insufficient development of agricultural industrialization, especially the lack of large-scale, intensive agricultural leading industries, it is necessary to further integrate the actual situation, guide the establishment of leading enterprises, and increase farmers' income;
3. The rural environment needs to be further strengthened. The bad habits that farmers have formed for a long time still exist to varying degrees. It is necessary to continuously strengthen the guidance education for farmers and regularly carry out environmental remediation.
4. The cultural and sports facilities in Xincun are still insufficient, and funds need to be invested to further solve them.
Fifth, the next step
1. We will continue to do a good job in the follow-up work on the construction of demonstration sites for new rural construction, further improve the infrastructure of the central village, and complete the demonstration project with quality and quantity.
2. We will continue to do a good job in the development of agricultural industrialization in the demonstration areas, do everything possible to introduce leading enterprises, and develop large-scale agricultural industries in the form of “companies + farmers + associations”.
3. We will carry out rural labor training in a solid manner. We plan to conduct three training sessions each year and three skills training sessions to improve the quality of workers and promote the export of labor services.
4. Implement contractual central village management, democratically negotiate the central village management regulations, sign agreements with farmers, promote democratic management of central villages, and achieve clean and tidy villages.