Summary of the village committee census work
1. Leaders attach importance to building a strong leadership team
With the spirit of the meeting and the requirements of the work, on the morning of July 2, our Huazhuang Village Committee immediately convened a special census meeting under the leadership of Secretary Shao Zhonghua. At the meeting, 14 members of the sixth census leading group of our village were identified: leader: Ni Huaming; deputy leader: Feng Yuting; instructor: Zhu Huiqun, and 8 village leaders and 3 external assistants as members. Shao Shuji pointed out: Although there are not many permanent residents in Huazhuang Village, the migrant population is relatively mobile. Moreover, there are currently Wanda Plaza site, Jiangqiao No. 1 base and the Beijing-Shanghai high-speed rail shed in the scope of my village. Therefore, the situation of the migrant population is complicated. Although the Wanda Plaza and the new Miaotou villager's residential area do not belong to our village in the true sense, we must also pay full attention to it. We must also visit the site, and we must do a good job in the census of the boundary of the village boundary, and strengthen the project with Shahe Village and Jin. The communication and information exchange between neighboring villages and communities such as Lai Community should be truly concrete, meticulous, not missing, and not repeated.
Second, actively participate in and organize training, and earnestly study hard to learn people's knowledge
On the afternoon of July 2, 14 members of our census team conducted a meeting and training. We divided 14 members: 8 village leaders each launched a household registration rectification work for the villagers of their production team; the two team leaders and three foreign exchange coordinators, in addition to publicizing the census, also On-site visits and coordination of factories, sheds, and construction sites within the scope of the field; together with the instructors, the regional division of the census community. The instructor will number, draw, and organize the list of 16 census plots. On the afternoon of July 8, the instructors participated in the training of “population census community division, address coding, building plotting” held by the town people's general office; and the town people's general office held on the afternoon of July 19th. In the case of the exchange, I carefully studied the division of the community, the confirmation of the boundary line, the numbering, and the precautions when drawing. From August 10th to 12th, the instructors participated in the three-day training held by the Jiading District People's General Office in Kunshan. During the training, they learned the mapping of the census, the household survey, the preparation of the household number, and the sampling of the long form. Relevant business knowledge, such as filling in various census forms and reviewing census forms. Listen carefully during the whole training process, and communicate with the personnel of the superior census office in time for the problems and difficulties in the actual operation process to achieve the training effect. On September 6 and September 10, under the leadership of the instructors, our 11 census enumerators conducted two internal trainings. The main contents were: 1. Propaganda census program and census responsibilities; 2. Introduction census types; 4. Introduce the census standard time point; 4, census object; 5, census fill in instructions; 6, household skills; 7, work rules; 8, census form short form instructions; 9, census form death form fill instructions; Fill in the instructions; 11, registration review rules; 12, non-special code and special code interpretation and so on.
Third, seeking truth from facts on the ground, truly do not miss, do not repeat
During the census, we made full use of the "two real" and population information materials as a guide. The census enumerators visited 16 census communities from house to house, carefully and carefully reorganized the household registration, household registration, formal household registration, etc. jobs. Among them, three foreign exchange coordinators - we call the "three people" working group, braved the heat to visit the Wanda Plaza site, Jiangqiao No. 1 base, Beijing-Shanghai high-speed rail, Jiayu elevated work shed several times, will be the site The work shed on the picture was drawn out, and the bottom was recorded. There were several buildings and several floors. How many people lived, and even some construction sites simply did not allow outsiders to enter, so it brought certain difficulties to the census work. Fortunately, the superior leaders have already made arrangements in advance, and made internal announcements on the contact details of the person in charge of each building base, so that we can carry out the census work smoothly. We also confirmed the census of Shanghai Jiangmei Co., Ltd., Shanghai Nano Factory, Shanghai Jiangqiao Welding Rod Accessories Factory and Shanghai Shunwei Electric Co., Ltd. at the border of the two villages with the census area of Shahe Village, and truly did not miss or repeat. As this census divides the new Miaotou villager's residence originally belonging to the Shahe Village 8 team, it is within the scope of our village. Therefore, we specially approved the leadership of Shahe Village, and asked the village leader of the village team, Master Zhang, to conduct field visits and visits. Household registration, etc., and at the suggestion of Master Zhang, we will divide this into three census communities, although not large, but the places with large foreign population and complicated living conditions are truly concrete and meticulous.
Fourth, carefully and carefully fill in the verification, complete the task on time, according to quality, quantity
Due to the tight schedule and heavy tasks of this census, our censuses have carefully completed the census form after completing the formal household registration work on the spot. When they encounter the ignorance, they ask questions, learn from each other, learn from each other, share information, and learn from each other. Check and strive to reduce the error rate. The instructor is also quick to summarize while verifying the book, and sometimes encounters the situation of inaccurate, but also has to look through the bottom table until it is correct; there have been numerous times to fill in the census form, mistakes, handwriting Unclear, traditional Chinese characters, and mismatched census forms are replaced, and re-copying... From November 1st to 15th, daily census progress is reported; and census enumerators are organized to fill in and check the census forms. Table code mutual check and other work, at the same time do a good job of reporting the people's general newsletter, complete tasks on time, quality, and quantity.
Today, the total number of registered 16 census communities in Huazhuang Village is 4,083, and the total number of registered households is 1,416. When we announce these data to the census enumerators who have worked hard for more than half a year, don't mention how happy they are! Because this is the result of their hard work and hard work, because they also know that the census work is an important national condition investigation, which is related to the overall situation of China’s economic development, and is related to the formulation of the national development strategy. The overall arrangement of material and cultural life is of great significance to the formulation of public resources, population and social management policies! They fully realize that the development of the social economy and planning need to conduct a census. They feel that they can be honored to take this job. It is very important to do this work well. Now, they feel very glorious for finding out the strength of our country's population!
recommended article
- The total work of the Shizhu County Agricultural Bureau Economic Management Station in 2019
- Summary of the comprehensive management work of the village in 2019
- Summary report on the new rural construction design and birth work
- Summary of the year-end work of village officials in 2019
- Summary of township education work in 2019
- Summary of the new rural construction assistance work
- Summary of the work of the township civil affairs office in 2019 and 2019
- Summary of the 2019 new rural construction work
- Summary of new rural construction
- Summary of the work of township politics and law in 2019
- Village director assistant college student official summary
- Personal summary of resident work in the village
popular articles
- Tao Xingzhi's famous sayings
- English famous words
- College entrance examination inspirational quotes
- Summary of the work of the township agricultural technology station in 2019
- Summary of the work of the village committee in 2019
- Deaf people jingle 2019
- 2019 village official personal work summary report
- Classical life motto
- 2014 is very touching words
- Bing Xin’s famous words
- Korean swear words
- I want to say something to the teacher.
- Teacher's famous saying
- Summary of the work of township political associations in 2019 and 2019
- Qq space mood phrase
- a good saying that loves labor
- Describe the fast time sentence 2019
- The latest high school inspirational maxim
- Summary of the work of the Agricultural Bureau in the first half of 2019
- Summary of the work of the Agricultural Technology Promotion Center in 2019
- Thanks to the friend's words 2019
- Injured sentence
- Summary of township population and family planning work in 2019
- Summary of the work of the village committee in 2019
- Strong words
- Taizai’s famous sayings
- Summary of village work in 2019
- Sad love sentence 2019
- Summary of agricultural machinery work in 2019
- Du Yuexi's famous sayings