[Boutique] proof of supply
Article 1: Proof of supply
Product Supply Certificate Contract Number:
Project name is required
Use unit name is required
Required areas of the project must be filled in the required city
Use unit address is required
Use unit contact is required
Use unit contact number is required
Product details
Name model number
Fire alarm controller JB=TBZL-JF998
Smoke detector D11
Temperature detector D12
Manual alarm button D13
Input module M01
Input and output module M02
Fire alarm controller JF998X
Floor display SP2
Fire hydrant button M06
Sound and light alarm SG01
Smoke detector D08
Temperature detector D02
Manual alarm button D03
\
The product supply certificate needs a few copies, please specify, if there is no description, the default is three
Supply contract
buyer:
Legal representative: Legal person code:
Attorney: Phone:
Postal Code: Fax:
mailing address:
Bank of account:
Bank account:
Supplier:
Legal representative: Legal person code:
Attorney: Phone:
Postal Code: Fax:
mailing address:
Bank of account:
Bank account:
The term “car” as used in this contract refers to the new car. In order to reflect the voluntary principle of both parties, there are blank lines in the relevant clauses of this contract for the parties to agree or supplement the agreement. After the contract takes effect, the unmodified text is deemed to be the content agreed by both parties.
On the basis of equality, voluntariness and consensus, the two parties shall, in accordance with the relevant laws and regulations of the State, enter into this contract on the supply of automobile agreements of the central state organs, in order to abide by:
First, the purchase model, quantity, price, delivery time:
Automobile brand manufacturer
Car model origin
Body color seat several fuel
Unit price
Total amount
Freight element
Total amount
Delivery date
Total number of cars:
Total amount: yuan
Second, delivery and acceptance:
1. After receiving the payment from Party A, Party B will deliver the vehicle to Party A.
2. Party A shall pick up the car at the delivery place of Party B.
3. Vehicle acceptance shall be carried out at the delivery place. Party A shall conduct preliminary inspection and confirmation of the appearance and basic function of the purchased vehicle. If there is any objection, it shall be submitted on the spot.
4. After the vehicle has been checked and accepted, both parties shall sign the vehicle handover book, which is the official delivery of the vehicle.
5. After the vehicle is delivered, the ownership and risk of the vehicle will be transferred from Party B to Party A.
Third, the car file and attached files:
Product certification
2. Technical data sheet
3. Product instruction manual
4. Vehicle Maintenance Manual
5. List of on-board tools and spare parts
Fourth, quality assurance and after-sales service:
1. Party B guarantees to provide new vehicles that have not been repaired in accordance with the national product quality standards and the quality standards of the manufacturers of this model, and are legal vehicles that can meet the requirements of national-home-an-all and environmental protection requirements.
2. The quality of the vehicle and other standards or requirements must be in full compliance with the corresponding requirements of the effective archives of this government procurement, and should also apply to relevant national laws and regulations, as well as relevant regulations of the ministries.
3. After-sales service is the responsibility of the company's special service station. According to the specific provisions of the Maintenance Manual.
5. Force majeure:
1. A force majeure event is an event that neither party can foresee, its occurrence and consequences cannot be avoided when it enters into this contract, and cannot be overcome and is not the fault of the party causing negligence resulting in failure to perform its obligations under this contract, including but not Limited to a major natural disaster that is sufficient to affect the performance of this contract, or a longer period of interruption or suspension of utilities.
2. In the event of a force majeure event, the party claiming to be force majeure shall notify the other party as soon as possible and provide notarized documents of the notary office. At the same time, it shall seek various reasonable means to reduce the damage caused by force majeure to both parties.
3. Neither party shall be liable for any delay or failure to perform any of the losses or expenses incurred by the other party due to delays or failure to perform the obligations under this contract due to force majeure events within the scope of the above agreement.
Sixth, other:
1. In relation to the signing, entry into force, performance, etc. of this contract, and the resolution of any disputes arising out of or relating to this contract, in addition to the application of this contract, the relevant files validly established in this government procurement process shall also be applied.
2. This contract is made in two copies and the stamp is effective.
3. If there is a dispute, it should be settled through consultation first. If the negotiation fails, either party may sue in the court of the plaintiff's domicile.
person A person B:
Address: Address:
Representative: Representative:
Year, month, day, month, day
Article 2: Proof of supply
To:
Our company promises to participate in the project name for this authorization: Medical Equipment S System Procurement Project Number: Provide the following quality assurance and bear the corresponding legal responsibilities:
1. The goods provided are brand new, in line with national quality standards, and the relevant departments of China are well-established.
Prepare the goods of the manufacturer's quality assurance book.
2. The goods provided meet the technical requirements of the tender file commitment and the contractual requirements. 3. To ensure the satisfaction of all the contents of the “bidding goods after-sales service commitment”. 4. Guaranteed supply within the specified delivery time.
Guaranteed unit name:
date:
Part 3: Proof of supply
I hereby certify:
Our factory is a registered enterprise for the production, processing and storage of export feed and feed additives approved by the Inspection and Quarantine Bureau. The registration number is . The following feed/feed additives provided by our factory on the date of the year are all from our factory and comply with the relevant regulations on inspection and quarantine of import and export feed and feed additives. If there is any falsehood, they are willing to bear relevant legal and economic responsibilities.
Product Name Product Type Specification Quantity Remarks
Signature of the person in charge of the registration company:
Date: Year Month Day
recommended article
- Proof of application
- Birth certificate
- Proof of study abroad school
- Marriage and child status certificate
- Quality certificate
- Do you have to get a marriage certificate?
- [Boutique] legal representative qualification certificate
- First marriage certificate
- Aluminum material 6061 material proof
- Company employee certificate of employment
- First home purchase certification format
- Student proof essay
popular articles
- Describe the fast time sentence 2019
- Classical life motto
- Format of certificate loss certificate
- I want to say something to the teacher.
- Thanks to the friend's words 2019
- Proof of acceptance
- College entrance examination inspirational quotes
- Taizai’s famous sayings
- Teacher's famous saying
- Du Yuexi's famous sayings
- The latest high school inspirational maxim
- Unit certification employee format
- Tao Xingzhi's famous sayings
- Legal representative certificate
- Student certification template
- Korean swear words
- 2014 is very touching words
- a good saying that loves labor
- English famous words
- How to open the salary income certificate
- Qq space mood phrase
- Injured sentence
- Sad love sentence 2019
- Deaf people jingle 2019
- Company departure certificate
- Company employee certificate
- Salary certificate
- Strong words
- Bing Xin’s famous words
- Resignation certificate