Electricity supply contract (3)


In order to coordinate the relationship between the power supply and the use of the two parties, clarify the responsibilities of both parties, establish a normal order of supply, and use electricity safely and economically, according to the "Contract Law of the People's Republic of China" and the "National Rules on Supply and Use of Electricity", The parties have fully negotiated and specially entered into this contract for mutual compliance.

Party A: _______________ City __________________ Chemical Factory Address: ________________________
Party B: _______________ City __________________ Power Supply Bureau Address: ________________________

Party A and Party B signed the power supply contract in the _________________________________________________________________________________________________________________________________________________________________________________________________________________________

1. Because the _________ city ______ district is now only _________ kV industrial line, the line is running at full capacity, the voltage quality is not good, and the power supply load cannot be increased. Party A _________ kV substation is now running at light load. In order to solve the production power consumption of the users in the _________ area, the two parties negotiated the new load to be powered by Party A.

2. Party A _________ kV substation _________ kVA main transformer due to internal discharge sound, suspended operation and maintenance, replaced with _________ kVA main transformer into operation. Party B agrees to retain the _________ kVA power contract capacity and will not re-apply for capacity expansion when investing.

3. Party A agrees to temporarily take Party B's power load with a total of _________ kilowatts _________ amps, to master its power consumption, and to be responsible for the safe operation of power supply and equipment.

4. The method of collecting electricity charges: Party B's users shall directly charge the meter to charge the electricity fee. Party A's total electricity meter subtracts the rest of the electricity consumption of other users, and Party B collects the electricity fee from Party A.

5. Party A's external B-party users and other user loads are temporary power supply measures. After the completion of the _________ district substation, the 10 kV grid planned by Party B will be used for the ___________ zone load.

6. This contract expires after the completion of the _______________ district substation.

Party A: __________________
Legal representative: ______
Party B: __________________
Legal representative: ______