Power supply contract template


Enter into the contract:

Power supply unit: __ City Power Supply Bureau, hereinafter referred to as the power supply side;

Power unit: __, hereinafter referred to as the power side.

In order to coordinate the relationship between the power supply and the use of the two parties, clarify the responsibilities of both parties, establish a normal order of supply and use, and use electricity safely, economically, and reasonably. According to the provisions of the National Electricity Supply and Electricity Regulations, both parties to the supply and use of electricity will fully consult. This contract is entered into in order to comply with it.

1. Power receiving location, power receiving voltage, power receiving capacity and time limit

1. Powered location: ________

2. Power receiving voltage: __ kV __ line three-phase AC __ kV. Among them, the voltage fluctuation range of 35 kV and above and the special requirements for voltage quality is ±5% of the rated voltage; the voltage fluctuation range of the high voltage power supply and the low voltage power of 10 kV and below is ±7% of the rated voltage; The voltage fluctuation range of the lighting power is +5% and -10% of the rated voltage. Electricity

For those with a network capacity of 3 million kilowatts or more, the allowable deviation of the power supply weekly rate is ±0.2 weeks/second. If the power grid capacity is less than 3 million kilowatts, the allowable deviation of the power supply weekly rate is ±0.5 weeks/second.

3. Power capacity: three-phase AC __ kVA, of which __ kVA __ Taiwan, __ kVA __ Taiwan, ....

4. Contract term: The contract term is __year, from __year__month__day to __year__month__day.

Second, the use of electricity to install, increase capacity and change electricity

1. If the electricity party newly installs or increases the electricity consumption, it shall apply to the power supply party for the application for electricity, and handle the relevant matters as required.

2. The power supply side is the power supply plan determined by the newly installed or increased power consumers. The effective period of the high voltage is 1 year, and the effective period of the low voltage is 3 months. If there is any special situation, the power supplier shall promptly negotiate with the power supplier to extend it.

3. If the electricity supplier newly installs or increases the electricity consumption, it shall pay the post fee to the power supplier in accordance with the relevant provisions of the State to share part of the cost of the power transmission, substation, power distribution project construction or renovation for the power sector. The dedicated line power supply or the project that the user has included in the infrastructure project is invested by the user.

4. After the power transmission, power transformation, and distribution facilities invested by the electricity party are built, after the power transmission is completed, the ownership of the property shall be determined according to the provisions of the National Electricity Supply and Consumption Regulations.

5. The electricity supplier proposes to reduce the power consumption. The power supplier shall retain its original capacity according to the time limit provided by the power supplier. The maximum retention period shall not exceed 2 years. When the electricity is restored within the retention period, the post will not be delivered; if the renewed period is required to resume the use of electricity, the new installation and capacity increase procedures will be followed. The power consumption of the basic electricity bill calculated according to the capacity of the transformer must stop the operation of the whole or the entire set of transformers.

The calculation is suspended. From the date of expiration of the power outage, all basic electricity charges shall be paid regardless of whether the electricity party applies for restoration of electricity or not.

6. If the consumer uses the power to change the nature of the power, change the name of the account, reduce the power consumption, suspend or stop the power, move the epitope, and relocate the power address, the power supply party should go through the formalities in advance.

When the power is stopped, the electricity fee should be settled.

When the power supply address is changed and the power supply point is changed, the new site power is processed according to the new power.

Third, design, installation, test and power

1. The design, installation and test of new installations, installations or modifications of electrical installations shall comply with the relevant national standards. If the state has not yet established standards, it shall comply with the regulations and regulations of the former Ministry of Water Resources and Electric Power or the __ provincial power department.

2. The power supply side of the high-voltage mode shall provide the power supply party with the design files and materials of the following electrical devices:

Electrical design instructions;

Electricity load distribution map;

Load composition, nature and maintenance of electricity;

Calculation of electrical power factor and reactive power compensation and capacity;

Primary wiring and arrangement of high voltage equipment;

Overvoltage protection, relay protection and metering devices.

The power supply for low-voltage mode power supply shall provide a list of load composition and power equipment. The low-voltage power supply of 100 kVA and above shall also provide calculation of power consumption and reactive power compensation data.

The design files and materials provided by the electricity supplier shall be in duplicate. After the power supply party reviews and submits written comments, the electricity supplier shall return the data for one construction. If the power supplier changes the design, the change plan should be submitted to the power supplier for review. After the installation of the power supply is completed, the power supply shall be provided with the test of the high-voltage electrical equipment and the setting of the relay protection device, and the power supply shall be inspected until it is qualified.

3. Reactive power should be balanced locally. The electricity supplier shall design and install reactive power compensation equipment on the basis of improving the natural power factor of the electricity, and timely input or cut off with the load and voltage changes to prevent reactive power reversal. The power factor of the electricity supplier at the peak load of the power grid specified by the power supplier shall meet the following requirements:

High-voltage power supply industrial power and high-voltage power supply are equipped with power supply with load adjustment voltage device, the power factor is above 0.90;

Other electricity consumption above 100 kVA, power factor is above 0.85;

For sale and agricultural use, the power factor is 0.80.

4. The electricity supplier shall apply for the electricity consumption index before power supply, and sign the power supply contract with the power supply party for the power supply mode, the installation capacity, the electricity consumption time, the property rights division, the dispatch, the communication, the measurement method, and the electricity charge. You can install the meter and connect it.

5. If the impact load, asymmetric load and rectification power of the electric power have influence on the power supply quality and safety and economic operation, technical measures shall be taken to eliminate the impact, otherwise the power supply may not supply power.

4. Safe use of electricity, electricity for planning, and electricity conservation

1. Electricity safety:

The planning, repair, calibration and test work of the power supply facilities shall be arranged in a unified manner. When power is cut off, the annual output of 35 kV or more shall not exceed 1 time; 10 kV shall not exceed 3 times per year. The power outage should be notified 7 days before the planned power outage.

The electricity supplier shall regularly inspect, repair and test the electrical equipment and protection devices to prevent electrical equipment accidents and erroneous operations; when the electrical equipment of the power supply endangers the personal and operational safety, it shall be repaired immediately; the power supply of multiple power supplies shall be used. The party shall install the interlocking device and perform the dispatching operation according to the agreement signed by both parties; the power supply party with the self-supplied generating unit shall file the record and shall take the preservation.

Measures to prevent reverse power transmission to the grid when the grid is out of power.

If there is any accident such as personal injury or death, major electrical equipment damage and power failure caused by power failure, the power supply shall be reported immediately and an accident analysis report shall be submitted within 7 days.

The relay protection mode of the electricity supplier and the power system shall cooperate with each other and be adjusted and inspected in accordance with the relevant regulations issued by the former Ministry of Water Resources and Electric Power. The relay protection device set by the power supply side and its sealed relay circuit and its secondary circuit and the relay protection setting value specified by the power supply party shall not be changed by the power supplier.

The power supply party shall supervise and inspect the safe use of electricity by the consumers, and actively assist the relevant competent departments and consumers to do a good job in technical training and management of the electrician's electricians, and conduct regular safety technical assessments.

2. Planned electricity:

The electricity supplier shall regularly submit an application for the project electricity consumption index, including: production tasks during the planning period, power consumption per unit product, electricity demand, maximum power load, production shifts, and energy conservation measures.

The maintenance of the electrical equipment should be arranged in the dry season as much as possible.

Both the power supply party and the power consumer shall obey the unified dispatch of the power grid, strictly supply and use electricity according to the indicators, and shall not exceed the overuse. The power supply party should conscientiously implement the principle of "who is over-restricted" and "super-use deduction". The power supply side shall install a power metering device, and the power supplier shall not refuse.

3. Save electricity

The electricity supplier shall regularly plan the plan for saving electricity and complete the task of saving electricity; the power supplier shall supervise, inspect and help the electricity-saving work of the electricity supplier.

The electricity supplier should actively adopt technical measures to save electricity and promote effective cost-saving experience. The electricity supplier thus saves electricity, and the “three electricity” office must not reduce its electricity consumption index. Where the state promotes the use of energy-saving technical measures, the electricity supplier must incorporate the plan for saving electricity and implement it. If the electricity supplier does not use it, the “three electricity” office can deduct the electricity consumption index accordingly.

The power supply party and the electricity supplier shall strengthen the management of non-production electricity, cancel the package and fee system for household living electricity, and pay the fees according to the actual electricity. The use of non-productive electric furnaces should be approved by the power supply bureau.

V. Maintenance management and property rights boundaries

1. The scope of maintenance and management of power supply and power supply electrical equipment is divided according to the boundary point of property rights. The principles for determining are as follows:

For low-voltage power supply, the last support of the power supply line is the demarcation point, and the support is the power supply side;

For high-voltage power supply of 10 kV and below, the first circuit breaker or the incoming casing before the power supply or the power distribution room is used as the demarcation point;

For high voltage power supply of 35 kV and above, the first base pole outside the power sector or the power substation shall be the demarcation point, and the first base pole shall be the power supply side;

The property right belongs to the line of the electricity supplier, and the branch point or the first base pole outside the power supply substation is used as the demarcation point.

2. The power supply and power equipment maintained and managed by the power supply party and the power supplier shall not be operated or moved without the consent of the management unit. If it is necessary to operate or change due to an emergency, the responsible unit should be notified promptly afterwards.

3. Due to the needs of engineering construction or line maintenance, the power supply side should provide convenience when drilling walls, digging trenches, digging pits, and patrol lines. The power supply personnel shall abide by the relevant security system of the electricity supplier. When the electricity is used to work in the equipment area maintained by the power supplier, the power supplier shall obtain the consent and work under the supervision of the power supplier. After completion, they should be repaired in time.

Sixth, electricity metering and charging

1. The purchase, installation, movement, replacement, verification, demolition, sealing, unsealing, etc. of the billing meter and its subsidiary files are handled by the power supplier. The complete set of equipment for high-voltage electric power is equipped with self-prepared electric meter and its attached files. After the power supply party agrees and passes the inspection, it can be used as a billing meter and handle the transfer of fixed assets without charge. During the period, the power supplier is responsible for maintenance management. End of electricity

After that, the procedures for returning assets without compensation will be processed.

The billing watt-hour meter installed at the measuring point of 63 kV and above shall use the special secondary circuit of the transformer; the billing watt-hour meter installed at the measuring point below 63 kV shall be set with a special transformer, which shall not be Protection, measurement and other circuits are available for use. If they are shared, they should be gradually modified.

2. The billing meter should be installed at the boundary of the property rights. The active, reactive power loss and line loss of the transformer are borne by the owner of the property.

3. The charging meter and the auxiliary files installed by the power supplier shall be responsible for the custody. If it is lost or damaged due to the responsibility of the electricity supplier, it shall compensate or bear the repair fee. When the meter needs to be moved due to the power consumption, the labor cost is borne by the electricity supplier.

4. When the electricity supplier requests to verify the metering power, the power supplier shall handle the data as soon as possible. If the verification is passed, the calibration fee shall be charged; if it is not qualified, the calibration fee shall not be charged. If the power supplier still has any objection to the verification result, the power supply party's superior measurement supervisory authority may be required to participate in the processing by the national metrology bureau. The electricity supplier shall accept the repair and verification and charge the fee.

5. If the error of the billing electrical metering device exceeds the allowable range or the record is not accurate, the power supply party shall refund or replenish the electricity fee according to the actual error and the starting time. When the starting time cannot be checked, it can be calculated according to the provisions of the National Electricity Supply and Consumption Rules.

6. The power supply party shall fix the date of meter reading and charge the meter on schedule. The electricity supplier shall pay the electricity fee according to the time limit specified by the power supplier. For those who fail to pay within the time limit, they will be charged with late payment and the power supply will be stopped.

The power supply party allocates electricity to the electricity consumers who use more electricity, and the meter is settled at the end of the month. The power supply party may entrust the bank or rural credit cooperative to collect or collect the electricity fee.

7. Liability for breach of contract

1. When the power supply party fails to supply power to the electricity supplier according to the planning indicators, it shall replenish the less-supplied power and electricity afterwards, and shall pay the electricity supplier a __% liquidated damages for the electricity supply fee. The liquidated damages shall not be sufficient to compensate the electricity consumers. In case of loss, the power supplier shall compensate the loss of the electricity supplier; when the electricity supplier exceeds the power consumption of the indicator, the power supply party shall, in addition to deducting the excess power consumption, and impose a breach of contract,

Jokin is calculated as __% of the multi-use electricity bill.

2. When the power supply party loses power due to operational or operational liability accidents, the power supply party shall compensate the power supply for 5 times the electricity consumption of the electricity that may be used during the power outage time. The possible power consumption shall be used before the power failure. The electricity is calculated by the normal electricity consumption. However, the power system switch is turned off, and the automatic reclosing is well-coordinated or the power supply with the standby power supply is only stopped.

When the power supply of one power source can meet the capacity of the power supply standby power supply equipment, the power supply party shall not be liable for compensation.

3. Due to the responsibility of the electricity supplier, the power supply party shall lose power to the outside, and the electricity supplier shall compensate the electricity fee according to the small power supply. If an accident caused by the electric power is used to expand the power outage range due to the responsibility of the power supply party, the electricity supplier shall not be responsible for the expansion of the compensation for the accident.

4. When the supply voltage exceeds the fluctuation range specified in this contract, the power supply party shall compensate 20% of the unqualified electricity consumption fee actually used by the electricity supplier. However, the power factor of the electricity used by the electricity does not meet the requirements of this contract, or the voltage fluctuations caused by the internal causes of other consumers, the power supply is not responsible.

When the voltage fluctuation exceeds the allowable fluctuation range, the record of the automatic voltage recorder that the user has prepared and verified by the power supply party shall prevail; if the power supply does not install the meter, the voltage of the power supply substation shall be recorded as quasi.

5. When the power supply weekly rate exceeds the allowable deviation specified in this contract, the power supply party shall compensate 20% of the electricity cost of the unqualified electricity used by the electricity supplier.

The time when the weekly rate changes beyond the allowable deviation is subject to the automatic record of the weekly rate meter that is self-provided by the power supplier and qualified by the power supplier.

6. If the power supply party is disconnected from the high-voltage power supply line to the low-voltage power supply line due to construction errors or due to the responsibility of the power supply party, the equipment shall be repaired or compensated reasonably.

7. If the electricity supplier uses the power supply equipment with low electricity price or privately change the power consumption category, the electricity supply fee will be paid to the power supply party according to the actual use time, and the penalty of 1 to 2 times the electricity fee will be imposed. . For those who are difficult to determine the date of use, calculate at least 3 months.

8. If the electricity supplier exceeds the reported capacity to increase the electricity capacity privately, the electricity fee shall be recovered, and a penalty of 20 yuan per kilowatt shall be imposed, and the equipment shall be dismantled and sealed. If the user uses the suspended electrical equipment or activates the sealed electrical equipment, he shall recover the electricity fee, impose a fine of 20 yuan per kilowatt, and seal up the unauthorized electrical equipment.

9. The electricity party shall impose a fine of 20 to 50 yuan for the self-transfer, change and unauthorized operation of the power metering device, power metering device, line or other power supply facilities. The power supplier shall, without the consent of the power supplier, introduce the backup power supply by itself and impose a fine of 50 yuan per kilowatt according to the capacity.

Eight, other

______________________________________________________.

After the contract is in force, neither the supply nor the use of electricity shall be modified or abolished without authorization. If there are special circumstances in the contract that need to be revised, or there are unfinished matters, a supplementary agreement shall be made in accordance with the National Electricity Supply and Demand Rules, and the supplementary agreement shall have the same effect as this contract.

This contract is officially in duplicate, one for each party for supply and use of electricity, and one for each unit of __ share, paying, etc.

Power supply side:

address:

legal representative:

Contact:

phone:

Bank account and account number:

Power consumption:

address:

legal representative:

Contact:

phone:

Bank account and account number:

Signing time: year, month and day