Summary of hidden danger investigation and management
Summary of hidden danger investigation and management
In order to conscientiously implement the policy of “safety first, prevention first, comprehensive management”, implement the spirit of Huaneng Power Safety Supervision [2011] No. 67 file “Notice on Immediately Conducting Hazard Detection and Management Actions for Safe Production”, and combine with our Ministry The actual situation of the construction, the safety organization headed by the project manager of our department attached great importance to it, and immediately organized the hidden danger investigation and management action led by the project safety department. The project will cover the entire project from August 11, 2019 to June 13, 2019. Centralized inspection. And set up a safety production hidden dangers investigation and governance action work leading group and hidden danger investigation and governance action work office.
Leader of the Leading Group for Hazard Investigation and Management: Deputy Team Leader: Members:
Office is located in the project office
Now I will report on the investigation and management of hidden dangers in various construction work areas as follows: 1. Construction of the 5# construction hole
At the present stage, the excavation of the 5# branch hole has been completed, and the inspection of the 5# branch hole was carried out.
1. The construction power lines in the 5# branch hole are messy and the materials are not stacked neatly. In this regard, the Leading Group for Hazard Investigation and Management issued a verbal warning to the person in charge of the site, demanding immediate rectification and eliminating the recurrence of similar situations.
2. During the inspection, two people at the entrance of the 5# branch hole were not hanging the badge.
In this regard, on-site duty personnel are required to supervise the construction personnel in the cave to hang the badge on the work every day.
If you make another crime, you will be given a certain economic penalty according to the circumstances. Second, the diversion tunnel
1. The materials on the construction site are piled up in disorder, and there is water accumulation.
In this regard, my leading group ordered the person in charge of the operation to immediately rectify, stack the materials neatly, and rationalize the drainage ditch, so that there is no water in the hole to ensure the construction of the full text.
2. There is insufficient lighting in the construction of the face in the cave.
The on-site duty technicians were ordered to immediately rectify and ensure sufficient lighting for the construction of the face. Third, 2# construction road
1. The reinforced stone cage protection slope on the Linjiang side has not been completed.
August is the peak of flood season, and it is required to improve the steel cage protection slope on the riverside as soon as possible to ensure that the 2# construction road in flood season is not washed away by river water.
2, 2# There is a blockage in the drainage ditch of the construction road, and the drainage is not smooth in rainy days, making the rain flowing around. It is required to immediately straighten out the drainage ditch to ensure smooth drainage.
The 2# construction road drainage ditch was cleaned up. Anyone who discovered that the drainage ditch was not cleaned up in the future during the construction process will be given corresponding economic penalties and exposed. Fourth, the surge tank
1. When the pressure regulating well was found to be sprayed and supported during the inspection, the safety frame was not installed on the erection frame.
The person in charge of the site shall be ordered to immediately install a protective net, and at the same time, a safety net shall be installed at the corresponding location to prevent the occurrence of a safety accident.
2. When the high-slope shotcreting operation of the surge tank was started, it was found that a construction worker did not wear a seat belt.
Seek immediate rectification and prevent similar phenomena from happening again.
In this regard, the Ministry immediately notified the site management personnel and the head of the operation team, demanded immediate rectification, and gave serious warnings, and informed the person in charge of the operation team. If a similar phenomenon occurs again, the corresponding economic punishment will be given and the exposure will be handled. Let all employees take the lead. V. Vehicle management
1. During the inspection, it was found that the vehicle maintenance records were incomplete in June and July.
Requires immediate rectification and supplements the vehicle maintenance records in June and July. 2. The speed of the construction vehicle is too fast.
The person in charge shall be ordered to immediately rectify and ensure that the vehicle is in the speed limit range. If there is another situation in which the vehicle is driving too fast, the penalty will be imposed according to the circumstances. Summary
1. Strengthened the inspection of duty on duty during the flood season; 2. Strengthened the publicity and education of vehicle management; 3. Strengthened the safety management of the site;
4. Taking the opportunity of this hidden danger investigation and management as an opportunity to further strengthen the awareness of safety and prevention; 5. Implement the archives and conference spirit issued by the owners, popularize safety education knowledge, and comprehensively improve the safety awareness of all employees.
In accordance with the project safety production tenet of “safety first, prevention first, comprehensive management”, the Ministry will continue to adhere to the publicity and education work for the operators, aiming at improving the safety awareness of workers and the self-consciousness of obeying discipline. Strictly implement the safety production responsibility system and safety supervision and management system, strengthen on-site routine inspections, increase vigilance, prevent hidden dangers, eliminate possible unfavorable factors in the bud, and ensure the safety of production and life of all personnel. This will serve as the cornerstone of the next phase of safe production and ensure the achievement of annual safety production targets.
Summary of hidden danger investigation and management
In 2019, the investigation and management of the safety hazards of the Shaxian Airport Project Department was carried out in accordance with the provisions of the “China Electric Power Construction Group Co., Ltd. Safety Accident Management Measures” and the “Notice on Deeply Conducting the Hidden Dangers of Safety Production” and related requirements. For the special work of the construction safety hazard investigation and management of the project department, the following points are summarized:
1. The project department determines the monthly safety hazard investigation and management work, and carries out carpet inspection on the construction site, camp, equipment and repair workshop. Daily security officers patrol, side stations on habitual violations, hidden dangers immediately stop, rectification for failure to correct in time. Each link of the construction process of the project department, each type of work, and the construction of the operator shall be safely handed over, and each party shall sign one copy.
2. Employees, construction workers, and laborers are all safely entered into the tertiary education. After the education, fill out the education form and sign the case. The training of full-time safety management personnel shall be reported by the labor department and organized for training. Special operators and vehicle drivers must obtain valid documents and report to the security department for review and filing.
3. The project department analyzes the characteristics of the construction: object strike, mechanical injury, vehicle injury, fire and explosion prevention, etc., and formulate corresponding management measures, and emergency rescue plans to effectively curb the occurrence of accidents. The safety management rules and regulations of the project department are basically sound and effective, and all rules and regulations are formulated for this project. The analysis of dangerous point sources, machinery, vehicles, safety operation regulations, safety production responsibility system, safety education regulations, safety Inspections, equipment vehicle operation management, and casualty accident investigations performed well.
4. Safety equipment is carried out according to regulations, caps, dust masks, protective covers, safety ropes, etc. Construction machinery and equipment have operating accounts and operating procedures, operating records, usage records. The special equipment shall be put into use after being qualified by the local metrology bureau, and all mechanical equipment certificates shall be reported to the security department for record.
5. Through the quality and safety department and construction site supervision, on-site materials and equipment can be stacked neatly and discharged in an orderly manner, and 156 pieces of on-site protection warning signs are advertised. The project department set up a road and dust control group, equipped with two sprinklers, long and late shifts, equipped with loader leveling construction main and secondary roads, and equipped with two maintenance personnel to effectively create a good atmosphere for construction. The project safety investment is invested in the project production according to the ratio of 1.5% of the company, which lays a good foundation for production and construction.
6. The project department strengthens the safety management of the hot season and flood season in summer. High temperature in summer
During the season, the construction workers' schedules during the high temperature period were properly adjusted, avoiding the construction of high temperature period, reducing the labor intensity, and equipped with heatstroke prevention and cooling supplies, carrying out publicity and education on heatstroke prevention and heatstroke first aid knowledge; The project department set up an anti-Taiwan leading group. The company pays close attention to the changes in the weather, receives typhoon information, promptly informs the various work areas to prepare for anti-Taiwan, and takes effective measures to prevent safety accidents caused by natural disasters according to actual conditions.
Through this year's safety production hazard investigation and management activities, the project department's responsibility for safety production was further implemented, and a long-term mechanism for monitoring and improving major hazard sources and hidden dangers was established and improved, effectively eliminating accidents and promoting my project. The Department of Safety Production continued to develop steadily. In order to fully implement the policy of “safety first, prevention first, comprehensive management”, we have consistently implemented the investigation of hidden dangers and laid a solid foundation.
Summary of hidden danger investigation and management
According to the relevant notices and work plan requirements of the company to carry out the safety hazard investigation and management activities of the two insurance associations, combined with the actual situation of safe production, the Ministry of Change will formulate the “Special Action Plan for the Hazard Investigation and Management of Substation Safety Production” in a timely manner, and establish the safety of the head of the director. The special action team for hidden danger investigation and management, carefully organized, widely mobilized, and fully deployed, focusing on “three investigations and six preventions”, all employees comprehensively and comprehensively investigate hidden dangers and safety weaknesses, implement safety responsibilities, and strengthen safety awareness and responsibility awareness of all employees. Risk awareness, effectively curb the occurrence of power grid accidents, and ensure the safety and stability of equipment during the two sessions and the Lantern Festival. Specifically, we will summarize the safety hazard investigations of our ministry during the two sessions; 1. Strengthen responsibility, meticulous organization, and careful deployment.
Implement rules and regulations, improve organizational structure, and formulate work plans.
2. Implement responsibility, each responsibility
In accordance with the principle of “who is in charge, who is responsible, who implements, and who is responsible”, the responsibility for the investigation of hidden dangers is implemented step by step. Each station personnel perform their duties, and in the scope of their respective duties and scope of work, the safety production hidden dangers are treated as near-term safety. The center and main line of production work, earnestly implement the principle of “preventing prevention, combining prevention and control” and carrying out investigations on potential safety hazards.
Comprehensively carry out standardization of standard operation tickets, standardization inspection and rectification, and conscientiously do a good job in troubleshooting hidden power systems used in substations.
3. Quickly implement and achieve initial results.
The focus is on safety management, grid security, power supply security and power supply services, major equipment, infrastructure security, information security, and anti-violation. 4. Extensive publicity and intensive supervision
In order to give full play to the role of public opinion propaganda and supervision and management, in the safety hazard investigation and control action, the bureau opened a news column on the safety hazard investigation and management on the homepage of the bureau, widely publicized the significance of the special action, and timely released the latest special action for safety hazard investigation. Dynamically, all units and departments rushed to issue manuscripts, exchanged action highlights for safety hazard investigations, and investigated the effectiveness of governance, forming a good publicity atmosphere, encouraging safety hazard investigations to penetrate the hearts of the people, and mobilizing all employees to consciously and independently integrate into the safety hazard investigation and management actions. . Strengthen the supervision and management of safety hazard investigation and management, set up a special action inspection team for safety hazard investigation and management led by the leaders of the municipal bureau, supervise, guide and inspect the implementation of the safety hazard investigation and control actions of various units and departments, conduct irregular flight inspections and unannounced visits. Activities, in the spirit of accountability of cadres, strictly pursue the responsibility of relevant personnel, and urge the investigation of safety hazards to be carried out. Third, the problems identified by the safety hazards 1. Concerning the hidden dangers of power supply safety:
There are mainly a few integrated land-to-ground distances are not enough or the installation is not standardized, and some are still in the middle of the road; the safety distance between residents' building and the line is insufficient, and the safety distance between the high and low voltage lines is insufficient. The specific departments and relevant departments of the units have prepared detailed tables. Account. In response to such hidden dangers, if it is caused by the user, the bureau will promptly issue a notice of hidden danger to the user, urge the rectification or assist in the rectification; if it is caused by the reasons of the unit, we have arranged the plan, before December. Will be rectified. 2. Concerning the hidden dangers of infrastructure security:
Through the special inspection of the infrastructure site, the overall situation is better, but it is also found that the safety fence around the foundation pit in the construction area does not meet the requirements of the specification, and there is no safety warning sign; the paint on the construction site is stored in the hardware warehouse, and there is no fire extinguisher in the dangerous goods store. Hidden dangers. For such hidden dangers, some of them can be rectified immediately and we have immediately rectified them. The rest are also required to be rectified within one week to ensure the safety of the infrastructure construction site.
Fourth, the next stage of work plans
At present, the safety hazard investigation and management actions of the bureau are in full and in-depth progress, and the preliminary investigation of safety hazards has achieved initial results. However, it is still a long way to go before the victory in comprehensively taking out safety hazard investigation and management. In the next stage, in addition to the safety hazards found in the investigation, the rectification plan was formulated, the rectification personnel, funds and measures were implemented, and the rectification efforts were intensified. The spirit of the relevant meeting and the archives requirements will continue to be earnestly implemented, and the provincial company’s safety risks will be accepted. To supervise and supervise the supervision of the Special Action Inspector Group, further consolidate the results of the special activities for the investigation of hidden dangers, establish a long-term mechanism for the investigation and management of hidden dangers, strengthen the safety awareness, responsibility awareness and risk awareness of the overall employees, improve the safety production management level of the Bureau, and maintain Safety production is stable and the company is harmonious and stable.
1. Summarize the stages of investigation and management of hidden dangers, organize extensive exchanges and exchanges between various units and departments, and actively promote good experiences and good methods.
2. Continue to combine the autumn and winter safety inspections and the second round of safety assessments to carry out in-depth safety hazard investigation and management activities; take safety hazard investigation and treatment as an important basic work to effectively prevent safety production accidents, and actively combine hidden dangers investigation We found problems in rectification, summed up lessons learned, strengthened measures, and strived to achieve controllable, controlled, and controllable safety production.
3. Actively establish and improve the management system for the investigation of hidden dangers of safety, and combine the activities of safety inspection, safety evaluation and safety risk assessment in spring and autumn to make the investigation of hidden dangers regular and institutionalized, and continue to grasp them consistently.
4. Strengthen technical transformation of equipment, strengthen safety basic management, carry out in-depth safety special rectification, vigorously carry out education and training and electricity safety publicity, comprehensively do all kinds of safety production work, resolutely prevent the occurrence of electric safety accidents, and ensure the safety production of our bureau. keep it steady.
recommended article
- Summary of dance club activities
- A hotel building - total work in the first half of XX
- Teaching and research advanced individuals summary
- 2019 year-end summary of the Youth League Committee
- Summary of the construction of new socialist countryside
- "Eleventh" Tourism Golden Week work summary (three
- Summary of outstanding personal work for three years
- Work summary essay
- Maintenance electrician summary
- Accounting year-end summary essay
- Customer service work summary and plan
- A summary of the work of studying "eight honors and eight shame"
popular articles
- Ideal famous saying
- Praying the mother's famous words
- Summary of 2019 Ideological and Political Work
- Summary of the establishment of spiritual civilization in 2019
- If you swear, the more poisonous, the better, without the dirty words.
- Life perception phrase
- Describe bad sentences
- Year-end summary of bank tellers in 2019
- Car maintenance internship summary
- Thanks for the words 2019
- Classic talk mood phrase
- Encourage your child’s words
- Learning endless famous words
- Classical life motto
- Happy famous words
- Praise the teacher's maxim
- Personal summary of party members in 2019
- Valentine's Day confession
- Warehouse manager work summary
- Describe the sentence of the river
- Thinking sentence
- Summary of comprehensive governance work in 2019
- Valentine's sentence
- Year-end summary of the designer in 2019
- Thanksgiving teacher's sentence
- Father's love
- a famous saying that protects the environment
- Life perception phrase
- Year-end summary of the library in 2019
- Clothing store manager's work summary