Work summary > work summary essay

Maintenance electrician summary


Maintenance electrician summary

Time is like running water, and it always flows quietly without knowing it. In a blink of an eye, it will enter a new year. Looking back on 2019, although busy, it feels full. In the past year, great achievements and progress have been made in ideological learning, personal business literacy and management standards. The work in the past year is summarized as follows:

First, the ideological aspect

Continue to study Marxism-Leninism, Mao Zedong Thought and the important thinking of the "Three Represents", thoroughly study and understand the spirit of the party's 18th National Congress, implement the principles and policies of the party in the new era, strengthen political theory, and enrich itself. Political theory level, political stand firm, firm ideals and beliefs, focusing on the overall situation, consciously maintaining unity, paying attention to research, respecting facts, and paying attention to correcting their words and deeds with the standards of leading cadres, and guiding the usual work with theoretical standards.

Second, mechanical and electrical management work

1. Strengthen the management and maintenance of mechanical and electrical equipment, give full play to the advantages and performance of mechanical equipment, reduce mechanical and electrical accidents, and improve the management, maintenance and maintenance of all electromechanical personnel. Strengthen and standardize equipment management, and improve the posting of various signs such as cables. Standardized acceptance and electromechanical inspections are closely integrated and complement each other. In turn, the equipment's integrity rate is improved, the equipment explosion rate is reduced, and the downhole safety factor is improved.

2. Strengthen the education of safety concept. Starting from this unit, we will implement safe production in everyone's mind. In order to improve the safety awareness of each employee, strengthen the implementation of management methods and measures.

3. Strengthen monthly electrical and mechanical inspections and strengthen routine investigations. Strengthening the investigation of hidden dangers of equipment, the rate of equipment explosion has been greatly reduced, and the occurrence of safety accidents has been greatly suppressed.

4. Focus on reform and innovation. Actively cultivate the subjective initiative of employees, encourage employees to carry out small reforms, make equipment more adaptable to the production environment, and achieved great results in promoting safe production and energy conservation.

Maintenance electrician summary

My name is Cheng Fei. I was born on November 6, 1962. I am a member of the Communist Party of China. I am currently working for Inner Mongolia Kerqin Wang Wine Co., Ltd.

I joined the work in June 1986, at the Aershan Forestry Bureau. In 1992, I transferred to the distribution and distribution workshop of the State-owned Keyouqian Banner Winery in 1992. I studied maintenance electrician. In 1993, I worked as a workshop maintenance team. After the company was transformed from a state-owned enterprise to a joint-stock enterprise, it was appointed as the director of the power distribution workshop by the company. Over the years, from the grassroots work step by step, to today's link cadre positions, in addition to strict requirements, I also strive to specialize in electrical maintenance technology, training reserve talents, increase income and reduce expenditure, work hard to ensure the safe and efficient operation of enterprise electrical appliances. At the same time, it also contributed to the company's savings. I mainly do the following work.

First, consciously strengthen theoretical study and strive to improve personal quality

In many years of work practice, I deeply understand that without a firm and correct political direction, there will be no positive guiding ideology. In order to improve my ideological and political standards, over the years I have developed the habit of caring about national events, paying attention to domestic and international situations, and analyzing the impact of changes in the situation on the enterprise, and putting this idea into practical action to ensure that I Thoughts and actions are always loyal to the party's line and principles, constantly learning the important thinking of the "three represents," and "eight honors and eight shame", strictly demanding the use of party members' standards and learning from advanced model figures. Strengthening the construction of its own quality, and affecting the people around it to join the ranks of the pioneering competition, and provide suggestions for the development of the enterprise. Some people say that if a person wants to be a talent, he must be a man first. The reason is self-evident. In other words: if a person's career is successful, he must first learn how to be a person, especially to do a technically strong job of repairing electricians. Do things with care, and the officers must concentrate on learning, be open-minded, and be sloppy and mistaken. Work must first correct the attitude, develop a good professional ethos, be responsible for the work, obey the leadership arrangements, humbly listen to other people's instructions and suggestions, personal interests obey the company's interests, politeness, service enthusiasm, only in this way, can be qualified for their jobs.

Second, correct working attitude, play an exemplary role

In August 1992, I transferred from the Aershan Forestry Bureau to the then state-run Youqianqi winery as a maintenance electrician on duty. From the day I entered the post, I humbly learned from the teacher, passed the teacher, helped, brought, and I continued to study hard and quickly mastered the basic operation technology of the maintenance electrician. I officially became a qualified maintenance electrician on duty. The work includes all the safety equipment and quality maintenance work of the company during the construction period. During the work, I know the electrical work. Maintenance work is the top priority of the company's technical work, especially the introduction of new technologies and the inspection of hidden dangers of old equipment. It is also necessary to continuously learn new technologies, supervise and inspect at any time, and find that problems must be solved in a timely manner, and must not be ruined. Can no longer be eradicated. Affecting personal safety and corporate interests. This is also a question of testing the responsibility of a Communist Party member. Whether I was a duty electrician or a maintenance class and later a workshop director, I always strictly demanded myself, keeping in mind the principle of "nothing in electrical work." In the work, I not only asked my team members to be meticulous and meticulous when supervising inspections, but also know that they still need their own hard truths. I also made such strict requirements for myself: First, I met When you are dirty, tired, bitter, and dangerous, you are rushing ahead of the staff, and you have to do more than they do, and have more efforts. Second, when you encounter technical problems, you come forward and use your best efforts to overcome technical difficulties. I have always insisted that I have done my best to do everything well, focusing on the company's interests, including the company's technological transformation into the production process, sometimes working overtime to grab some time, scrambling to deal with technical problems, and winning valuable projects for the smooth production of the project. The time was highly praised by the company's leaders. Contributed to the rapid development of the company. It also provides a strong backing and strong guarantee for the company to create economic and social benefits. Third, I ask myself to be brave enough to take responsibility. I always think that since I am a technician, I have to be more in business and other aspects. It is better than the average staff, and it is necessary to strictly demand itself and take the lead in the model. Therefore, when the company assigns tasks, when the general employees complete the difficult tasks, they must actively undertake, and can not be arrogant with the employees. Out of the role model, brave and heavy burden. In peacetime, I am not only strictly demanding myself. In practice, I also do it according to these requirements. Therefore, these performances have been well received by leaders and employees, and they have also played a role as a technician. , established a good image that a technician should have.

Third, strengthen business learning and improve technical standards

Living to the old, learning to be old, art is endless, this is the motto of my many years of work, this year, science and technology continue to play this year, one day without learning, it is backward, special electrical maintenance technology, and with the continuous improvement of automation, no Anyone can be 100% proficient. It is constantly developing, constantly updating, and just like computer software. It is updated every day, and it is developing from time to time. Maybe you just learned to use and maintain it yesterday. It will be upgraded in two days. . I have to use advanced means to maintain and run. Therefore, I only have to strengthen my study to keep up with the pace of the times. I usually look at professional books as long as I have time. Over the years, my family The most of the middle pendulum is the electrical maintenance technology series. In addition to the training of the relevant departments at the higher level, some of the time in the spare time is used to study the electrical maintenance technology. Through learning, the company constantly enriches itself and constantly masters new technologies and new skills. Through study, I also combined with the actual work situation, overcome many technical problems, such as the frequency conversion step technology commonly used in electrical maintenance, visual inspection technology in electrical control system, etc. Through learning to broaden my knowledge, I still greatly improve my technical level, affecting the surrounding employees to join the ranks of learning, laying a solid foundation for the safe use of electricity and efficient operation of enterprises, and at the same time cultivated I have a strong interest in the study of higher level theoretical and technical knowledge.

Fourth, the development of skills, better service companies in my usual work, often with other employees for technical discussions and exchanges, the knowledge they have learned unreservedly shared with everyone, and learn from others I will use my business time to learn the basics of radio, study electrical operation and compensation technology, improve operational efficiency and complement electronic energy conservation, further accumulate experience, and improve my own technology by learning new technologies. Level, to achieve the company's electrical maintenance proficiency, the use of freely, from the company's power running to some micro-electric field to maintenance without dead ends, running technology freely, reflecting a technician's noble technical standards and good demeanor.

In short, as an electrical maintenance technician, there is a long way to go, but I am determined to continue learning, constantly improve the operational skills, to overcome the technical problems of the enterprise, based on my position, selfless dedication, to play a technician should have Model leadership to make due contributions to the development of the company

Maintenance electrician summary

I am a worker of the power supply company of the city of **, and I am currently a class of substation maintenance workshops of the ** city power supply company. I entered the ** City Power Supply Bureau in 1979. From 79 to 84, I was responsible for rural high and low voltage lines and distribution management and maintenance in the power supply. From 86 to 98, I was responsible for substation relay protection, investigation and maintenance, and maintenance of secondary construction. Installation, since 1998, has been the substation maintenance substation class, responsible for the overhaul, maintenance, electrical test, relay protection and substation engineering construction, equipment renovation and transformation of 17 substation equipment within the jurisdiction of our bureau. Obtain a senior work certificate. Looking back over the years of work practice, it is summarized as follows:

First, carry out the work of setting and setting the relay protection. Since the beginning of 86, due to the shortage of the original set-up personnel, I have assisted the unit to carry out the setting work of 110kv distribution line and 110kv user station relay protection setting. Since the work has been carried out, the relay protection setting data has been established, such as system impedance meter and sub-line. The impedance map and the system station fixed value list summarize the user station fixed value list, and the fixed value list is printed by the microcomputer for standard management. It also includes the calculation basis and calculation process of each re-setting value to form a relatively complete fixed value. Set the calculated management data. In recent years, the installation and review of the new 110kV and 35kV substation outlets have been completed. There is no mis-setting phenomenon, and the calculation of the short-circuit capacity of the system provides a basis for the selection of equipment such as distribution line switches. At the end of 1998, due to changes in institutional settings, junior technical personnel were instructed to carry out fixed-value setting work and successfully complete work handover.

Second, participate in the construction and transformation of the power grid. From 86 years to now, I participated in the main transformer capacity expansion of several 35kv substations in the city of **, and replaced the 10kv vacuum switch. As the main personnel, I cooperated with the leaders to carry out the whole process of the construction of the evil spirit 110kv substation, participated in the large-scale modification work of 110kV and 35kv lines, and cooperated with the 10kv line reconstruction project of the rural network, and gradually became familiar with the equipment and working procedures in the work. Assist in the completion of project project preparation, feasibility report for substation construction and transmission line transformation, participate in project quality acceptance and data collation, improve power supply capacity, meet economic operation needs, reduce line loss, improve power supply reliability and power quality It satisfies the requirements of economic development for electricity and has achieved good economic and social benefits.

Third, boldly participate in professional operation management and participate in the formulation of professional management systems. Since I used to study liberal arts, my writing skills are better. The unit leader was informed that I was working with the improvement and revision of the participation system. The contents include: power supply equipment maintenance management system; technical reform, overhaul project management measures; fixed assets management measures implementation rules; power supply equipment defect management system; operational analysis system; external project management regulations; production routine system; line and substation maintenance inspection System; technology progress management and incentive methods; scientific and technological progress and rationalization proposal management system; technical supervision management and assessment implementation rules; presided over the development of power supply business management distribution system basic system compilation. Participate in the formulation of production management standards, the content is: voltage and reactive management standards; line loss management standards; economic activity analysis and management standards; equipment process management standards; presiding to develop professional management responsibility system: line operation professional work management network and personnel at all levels Responsibility system; transformer professional work management network and personnel responsibility system at all levels; lightning protection work management responsibility system; cable operation professional work management network and personnel responsibility system at all levels; transformer implementation measures. Actively carry out seasonal work, arrange and arrange annual important power-saving work for festivals and power-saving arrangements for major political activities. The development of these tasks has effectively promoted the safe and stable operation of the power grid.

Fourth, carry out scientific and technological management work. In my work, I use computer sets as much as possible to manage my work, improve work efficiency and management standards. The first is to apply the fixed assets statistical application program to complete the work of unit fixed assets transfer, complete the work of adding, changing, scrapping, depreciation and other fixed assets. The second is to use the technical reform statistical program to complete the statistical analysis of technical transformation. The third is to assist in the completion of the development and application of the company's geographic information system, organize the completion of the distribution line parameters, the operation of data entry, the formation of a line database. The fourth is to assist the distribution line to install the automatic recloser pilot work, to form an automatic judgment of the fault, improve the reliability of power supply, and make a useful attempt for the automation of distribution lines.

5. Actively participate in business training and learning, strengthen their business skills, and raise awareness of safety and disease prevention.

Over the years, I have actively participated in the training and testing of simulation simulator training, electric shock emergency, and "safety regulations" knowledge training organized by the city company. In the previous study and training, I have actively consulted the instructors with a humility and eagerness to learn, and actively consulted the instructors, and worked hard to practise their own business, so that their thoughts always revolved around "all work for safe production, that is Responsible for my own personal safety, this also makes me more secure in the operation of the safety work.

I am deeply aware that there is no small matter in safety production. Once there is any negligence in safety work, all the work is done in vain. If you want to do a good job in the safety production of the substation, you must not panic or chaos under any circumstances. I have my own thinking, I can't misjudge the phenomenon of failure, I have to give the brain a clear and correct understanding! Production work, sometimes experience is more reliable than eloquence, and it is also more reliable to learn safe production knowledge and improve their skills. The accumulated results.

6. Actively study the cases of safety production accidents and organize the safety activities of the team to alert themselves to prevent accidents of safety production.

In my many years of work, I have been trusted by leaders and colleagues at all levels to let me work with the team to organize and organize four monthly safety activities. In the meantime, I have the hard work and hard work of my work, and I have the experience and happiness of harvesting safe production. In each case of a bloody accident, the victim of the accident may have to pay the cost of his own life only if he did not follow the procedures, or simply did not patrol the equipment in accordance with the requirements of the Safety Regulations, and may cause the main transformer to trip. Loss of load; on the one hand, it will affect the company's good reputation, on the one hand, it will also cause inconvenience and psychological panic to the public.

The above is a technical summary of my own work over the years, and my experience is to improve myself. In the future work and life, I will encounter various problems. I also have many shortcomings in my own life. I hope that I can get guidance and teaching from teachers and colleagues.

recommended article

popular articles