Work plan > Office unit work plan

Water Affairs Bureau 2019 work ideas


In XX, the overall idea of ​​water work in our county is: guided by the spirit of xx, in accordance with the overall arrangements of the state, provincial and state water work, combined with the requirements of the central government to expand domestic demand, in-depth practice of the scientific development concept, adhere to the "reform to protect Stable, promote development by project, grasp management and promote harmony, focus on implementing the construction of dangerous reservoirs for danger elimination, flood control, irrigation, soil and water conservation, drinking water safety, river management, etc., and accelerate the construction of drinking water safety guarantee system and flood control and disaster reduction system. , synergy guarantee system, water ecological environment security system, optimize the water conservancy development environment, promote the county's water conservancy work to environmental water conservancy, resource water conservancy, benefit water conservancy, provide a strong water conservancy for the county's economic and social development Support and security. In XX, we must focus on the following tasks:

Carry out good water routine work

The first is to grasp the construction of water conservancy projects on the surface. Ensure that 4742 types of water conservancy projects will be completed within XX, the investment will be 800.614 million yuan, the newly added irrigated area will be 0.71 million mu, the irrigated area will be improved by 5.07 million mu, the soil erosion area will be controlled by 10.55 square kilometers, and the rural area will be solved and improved by 3.13 million, 1.12. Dingtou big livestock have difficulty drinking water.

The second is to conscientiously grasp the construction of construction in progress. The Babao Reservoir Project was approved by the superiors in June this year. The four-sick and dangerous reinforcement project of Naima, Weimo Reservoir, Longgushan, Sand Dam, Bomo and Muyi was completed and accepted by the project and delivered for use.

The third is to prevent floods and droughts on flood control and drought resistance. Further strengthen the implementation of the flood control responsibility system, strictly guard against discipline and discipline, strengthen the flood control duty, and strictly guard against death during the main flood season. Within the scope of normal flood standards, ensure that one medium-sized reservoir, 13 small reservoirs, 28 small reservoirs and important The river section is safe. Continue to strengthen the construction and management of water projects, strictly control the quality, carry out safety inspection activities in a solid manner, ensure full production, and conscientiously implement various drought-resistance measures to ensure that agriculture increases production and income.

The fourth is to effectively carry out the basic construction of farmland water conservancy based on winter and spring repairs. Find ways to raise funds through multiple channels, further increase investment in rural water infrastructure construction, serve the construction of a new socialist countryside, accelerate agricultural and rural development, and increase farmers' income.

The fifth is to focus on the people's livelihood and strengthen the construction of rural drinking water safety projects. Accelerate the construction of drinking water projects, build a rural drinking water safety system, adhere to the rural drinking water safety issue as a breakthrough in the construction of new rural water conservancy projects, and increase the construction of rural drinking water safety projects. The plan solves the drinking water safety problem of 31,300 people.

Sixth is strict water administrative law enforcement. Strengthen the publicity of water laws and regulations, and raise the awareness of the county people's water law. Focus on standardizing management and investigating cases, and do a good job in law enforcement management of water administration and soil and water conservation. Seriously do a good job in approval, supervision and management, collection of fees, and resolution of major water disputes. Increase the intensity of crackdowns on illegal activities, effectively stop and investigate violations of water and fishery.

The seventh is to pay close attention to soil erosion control. Actively strive for project implementation of small watershed comprehensive management projects. At the same time, it is necessary to further strengthen the law enforcement of water conservation, strictly control the quality of water and soil conservation plans, prevent humans from causing new soil erosion, and promote a virtuous cycle of ecological environment in our county.

Do a good job in water conservancy project work

Promote development with projects, actively coordinate with relevant departments, strive for funds, and implement a number of water conservancy projects.

First, actively promote the preliminary work of the medium-sized reservoir, and strive to enter the central and provincial projects to expand domestic demand.

The second is to strive to implement the project to reinforce the four small reservoirs of Mawiao, Khantan, Xiluo and Songshupo, and strive for a national and provincial investment of 16 million yuan.

The third is to strive for the implementation of five small-risk reservoirs to reinforce the dangers, and strive for a national and provincial investment of 12 million yuan.

[nextpage] The fourth is to strive for the implementation of a comprehensive watershed management, with a total area of ​​193.5km2 and a management area of ​​103.35km2. The total investment is 37.128 million yuan.

The fifth is to strive for the implementation of a river management project. The total investment is 20.632 million yuan, and the state investment is 20.632 million yuan.

Sixth, actively strive to implement the project to implement the construction of Xiluo Irrigation District, improve the irrigated area by 2,500 mu, increase the irrigated area by 2,589 mu, and benefit 4,210 people. Strive for national and provincial investment of 6.145 million yuan.

Seventh, it plans to implement 160 small water rafts and 122 self-flowing water supplies to solve the problem of unsafe drinking water for 31,300 people in rural areas. The total investment of the project is 15.7886 million yuan.

Pay attention to people's livelihood and serve the people

Continue to do a good job in people's livelihood and ensure stability and harmony. In XX, we must address the treatment of internal self-supporting self-supporting units and implement water conservancy and benefit-minded measures as the main direction of people's livelihood work, create conditions for the gradual realization of the industry's poverty alleviation and the prosperity of workers, and provide reliable water conservancy for the production and life of the people. Social services.

The first is to strengthen the management of small reservoir management and township water supply projects. Strengthen and expand the reservoir surface aquaculture industry, adopt various business methods such as contracting and leasing, carry out water conservancy project management and management, break the current wage distribution system, and implement remuneration according to work, thereby improving the enthusiasm, initiative and anxiety of employees. Overcoming financial difficulties, we will work hard to carry out self-supporting units and employees to participate in social pension insurance and medical insurance operations on time.

The second is to carry out the action of human and animal drinking water. According to the total number of rural drinking waters that have not been approved by the Provincial Water Resources Department in the county, under the premise of the people's willingness, actively strive for the support of the higher level funds and solve the problem of drinking water for the unsafe population as much as possible.

The third is to carry out water conservancy and benefit the people and serve the people. Efforts will be made to improve the level of socialized service of aquatic product technology promotion and water conservancy science and technology promotion, and provide high-quality pre-production, post-production and post-production technical services for farmers, and truly solve the practical problems they encounter in the actual production process. Strengthen technical guidance for flood control, drought relief and water conservancy basic construction, provide water conservancy for the county's economic and social development, and provide water conservancy support for the people's lives in the county.

Strengthen engineering construction and internal management of the unit

In-depth study and implementation of the spirit of the party's XX conference, promote sustainable development of water conservancy, strengthen party building and institutional style construction, comprehensively implement the responsibility system for party style and clean government construction, carry out special rectification efforts to combat corruption and promote honesty, strengthen engineering audit supervision, and strive to build anti-corruption prevention Change the ideological and moral defense line and achieve the goal of “project safety, capital security, and cadre safety”. Combining with the reality of the water department, we will start with the weak links in management and the hot issues that the people are generally concerned with, and start with engineering management, resource management, financial management, and environmental management to further rationalize the management system, improve the management system, and strengthen management. Means, improve management methods, and bring the management level of the whole water system to a new level.

Fourth, the main measures and methods

First, we must further play a functional role. In accordance with the working principle of “Resistance to drought and water conservation, safety protection, and water damage repair and production”, we will focus on flood control and drought relief and reinforcement, and make overall planning and rational arrangements for water conservancy work in the county, strengthen technical guidance, and improve Construction quality is ensured to ensure project quality and construction progress.

The second is to strengthen cooperation with relevant departments such as finance, development and reform, tobacco, agriculture, and poverty alleviation, and take all effective measures to timely allocate construction funds, materials and manpower to jointly carry out various water conservancy construction work.

The third is to effectively cooperate with the county party committee and the government to strengthen the leadership of water affairs work, meticulously organize and rationally arrange, make every effort to ensure water conservancy investment, and truly implement the basic position of water conservancy construction to ensure the smooth implementation of various projects. Extensively mobilize the people to work and invest, and do a good job in engineering repair. Fully mobilize the enthusiasm of the broad masses of cadres and people, mobilize the people to invest in labor, and do a good job in water damage engineering and old-age repair projects.

The fourth is to concentrate manpower, material resources, and financial resources, and do a solid job in key projects.

The fifth is to strengthen the publicity of water laws and regulations and strengthen the enforcement of water administrative law enforcement.

Sixth, we must do a good job in building the party's work style and clean government, building spiritual civilization and building ideological and political work, do a good job in the construction of water conservancy "sunshine projects, clean projects", and achieve the goal of "project security, capital security, and cadre security." Combining with the reality of the water department, we will start with the weak links in management and the hot issues that the people are generally concerned with, and start with engineering management, resource management, financial management, and environmental management to further rationalize the management system, improve the management system, and strengthen management. Means to improve management methods. Strictly administration according to law, promoting open government affairs, strong internal quality, and external image; innovative forms to establish a good image of the water industry.

recommended article

popular articles