Secretarial knowledge > Conference speech

Agricultural Comprehensive Development Land Management Project Proposal


Comprehensive Agricultural Development in Jiangsu Province

##市2005 Annual Land Management Project Proposal

I. Basic information of the project:

1. Location of the project area

The project area is located in ##路西西,##镇, involving 11 new administrative villages including Xinbang, Yewei, Zhengtuo, Qilu, Zhoukai, Pingyi, Jiangyan, Nanke, Sishang, Dongwei and Xiaoyuan. The total population is 20,600, of which the agricultural population is 19,209, and the total area of ​​cultivated land is 26,427.82 mu. In 2003, the total agricultural output value was 7,874,100,000 yuan, including: planting industry of 6,636,300 yuan, fishery of 8.862 million yuan, forestry and animal husbandry of 1.096 million yuan, and breeding industry of 4,879,900. Yuan, the per capita net income of farmers is 4008 yuan.

2. Agricultural resources in the project area

The proposed project area has a subtropical climate with four distinct seasons and mild climate. The annual rainfall is abundant. The total rainfall is about 1000mm. The sunshine is sufficient. The annual accumulated temperature is 2305.6 hours. The average daily temperature is 13-16°C, and the frost-free period is longer. 240 days. The terrain of the area varies from high to low, with a dense water network. The area of ​​the river ditch is 3,198 mu, and the area of ​​cultivated land of about 80% is increased by 1.8-2.5 m. The area of ​​the low-yield field is 9200 mu. Therefore, the agricultural structure has been adjusted in previous years. At the same time, nearly 380 mu of aquaculture fish ponds were developed. The soil in the area is a kind of muddy soil, the soil is fertile, the organic matter content is high, the ecological environment is excellent, the irrigation water quality is good, and there is no pollution. It is the development of rice-fish farming for pollution-free agriculture. The ideal base.

3. Agricultural production status in the project area

The project area involves 5 flood control joints, the existing joint foundation is better, the backbone water conservancy project has a good rate of 40%, there are 42 sluice gates in the joint, 15 live ports, 5 pumps for irrigation and drainage, and 50 pumps. Block, 2 cross-flow pumps, total power of 660 kW, 56 existing mechanical roads, 14 machine-grown bridges, infrastructure has a certain scale, basic facilities, farmland irrigation and drainage rate of 100%, canal water utilization coefficient of 100 %, the effective irrigation area is 24,200 mu, which lays a good foundation for the construction of the project area.

The industrial structure of the project area is dominated by rice and wheat, supplemented by water aquaculture, of which rice and wheat planting area is nearly 21,000 mu, accounting for 86.8% of the total cultivated land area. In recent years, due to the continuous changes in market conditions and the incomplete infrastructure, the promotion of improved varieties has not been comprehensive, especially in this year, the rice stripe disease has occurred in large numbers, and the farmers' planting benefits have dropped significantly, especially in floods. In the year, the situation is even more severe. This year's Wuyujing No. 3 rice has one-third of the rice harvest, one-third of the rice production is only about 200 kilograms, and one-third of the highest yield is only about 400 kilograms, and a small part of the rice produced is High-quality and pollution-free agricultural products are very popular. It can be seen that the implementation of medium and low-yield fields, the improvement of infrastructure facilities, the promotion of fine varieties, and the improvement of farmers' income and income, and the development of pollution-free agriculture are imperative.

4. Construction conditions of the project area

——The location advantage is very obvious. The traffic conditions are very good, ##路,##河从## The inner abdomen of the town passes through the north and south long 27 Huali, ### The road crosses the East and West 13 miles from the middle of the town, extending in all directions, and the water and land transportation is very convenient. Moreover, ##镇is is a major poultry breeding town located in the eastern part of ##市, east of Taodu Town, south of Daiyin adjacent, west to Heshang, north to Changshang town, radiation surrounding The township is popular, the wealth is relatively strong, and the location advantage is very obvious. Therefore, ##镇 is a favorable area for developing high-quality planting and pollution-free agriculture.

-- Infrastructure has begun to take shape. There are 26,400 mu of land in the project area. Although there are some low-yield fields and some water-raising cultures, the production facilities such as irrigation, drainage and prevention are relatively complete, the degree of standardization is relatively high, the planting conditions are very good, and the area of ​​the land consolidation is large. In the comprehensive development of agriculture.

- The ecological environment is better. There is no industrial pollution and environmental pollution in the project area. It is adjacent to Jingyan River in the east, Weihe River in the south, Tanggang River in the west, Chelu River in the north, Huaxin River and Jiehe River in the middle. The water system is very superior and the water quality is clear. Clean air is an ideal area for the development of rice-fish farming and integrated agricultural development.

-- The strength of science and technology is relatively strong. Rich in agricultural cultivation, water aquaculture, including many years of historical experience in poultry farming, the majority of the people in the practice have accumulated a wealth of new techniques of planting and breeding, a strong agricultural science and technology team, agricultural technology, agricultural machinery, aquatic products, water The leading functional departments are all within the project area. The construction of the high-quality weak gluten wheat project implemented by the province this year is in the project area, and the overall promotion of the pollution-free agricultural product base is underway. The pilot work of rice transplanting in the whole province was carried out in our town. The governor ### came to our town to inspect and guide, and the transplanting machine reached 50 sets, and the machine transplanting area was over 10,000 mu.

Second, the necessity of project construction

——Base of construction

Land management and low-yield field transformation are national key agricultural development projects. ##市 is a large agricultural city with high reputation in the whole province and the whole country. It is a typical “land of fish and rice”. The agricultural model is a new development and utilization of agricultural resources. Highlights, transformation of production areas, strengthening of facilities, promotion of new varieties, new technologies, is of great significance to promote the adjustment of the agricultural economic structure of the city, improve the quality of agriculture, and accelerate the process of industrialization.

- the necessity of construction

In the project area, there are acreage types and facilities with insufficient production areas, which seriously affect the adjustment of agricultural industrial structure and economic benefits. Infrastructure transformation and construction must be carried out to improve the comprehensive productivity and resistance to fragmentation of such low-yield fields. The ability to improve the quality of agriculture is not only the need for agricultural development, but also the need for competition in the agricultural product market. It is also the need for farmers to grow their income. It is urgent and urgent.

Third, project planning and design

(1) Design standards

1 The basic conditions and ecological environment of agricultural production in the project area have been significantly improved, the ability to withstand natural disasters has been significantly enhanced, and the comprehensive agricultural production capacity has been greatly improved. Through the project construction, the adjustment of agricultural and rural economic structure has been promoted, the comprehensive benefits of agriculture have been improved, and the income of farmers has increased. To accelerate the process of agricultural modernization in the project area.

2 The project area has obvious regional scope, which is planned according to the river basin or irrigation district, and is in line with the overall planning of agricultural development in the region. Comprehensive measures are taken to focus on rectification and contiguous development.

3 The project area reaches Tian Chengfang, Lin Chengwang, the canal is connected, the road is connected, the dry energy can be irrigated, the sputum can be discharged, the stain can be reduced, and the field can be realized.

(2) Water conservancy measures

1 Irrigation project: Scientific planning of irrigation system, field irrigation facilities, bridges, culverts, gates and other buildings are fully equipped, and performance and economic indicators meet relevant planning standards.

2 Drainage project: The drainage system is sound, the drainage outlet is smooth, and the canal, bridge, culvert and gate are reasonable in design and supporting the building.

(3) Agricultural measures

1 Farmland project: To achieve the field, the field should be in accordance with the requirements of agricultural mechanization and field management, and the field should be formed on the basis of forest roads or larger ditches.

2 Field roads: The layout is reasonable and the circulation is smooth. The construction of the road is divided into two levels: the main road and the branch road. The main road must be connected with the rural road to meet the traffic of medium-sized agricultural machinery. The width is more than 5m. The branch road can guarantee the agricultural machinery. Passing through, clear and rainy day, and supporting bridges, culverts and agricultural machinery, it is convenient for agricultural machinery to enter and leave the field operations and agricultural products transportation, the width of 3.5m or more.

3 Soil improvement: Through the application of farmyard manure, straw returning and other soil improvement measures, the organic matter content of the soil tillage layer increased by more than 0.1 percentage points.

4 Breeding and promotion of improved varieties: The coverage of improved crops in the project area is 100%. Establish high-quality breeding bases in the project areas where conditions are needed and need to build seed drying and storage facilities, and equip with necessary seed processing and testing equipment.

5 Agricultural Mechanization: Actively promote agricultural mechanization, and the main operations are basically mechanized.

(4) Forestry measures

1 The main roads, ditches and rivers on both sides of the project area should be planted in time for tree planting.

2 The artificial afforestation forest seedlings should reach the standard of two or more. The survival rate of afforestation in the same year and the preservation rate after three years should reach more than 85%. The forests are neat and the structure is reasonable.

3 The construction of farmland shelterbelt should meet the standards set by the forestry department.

(5) Scientific and technological measures

1 Agricultural technology service system: to equip with necessary equipment and equipment, improve the agricultural service system and quality inspection and inspection system in the project area, and strengthen the technology service function.

2 Technology promotion: During the construction of the project, promote certain advanced and applicable technologies, and vigorously strengthen the introduction, demonstration and promotion of technologies for agricultural products quality and safety, standardized production, etc. The contribution rate of agricultural science and technology progress in the project area is at least higher than that of non-projects. 3 percentage points.

3 Technical training: During the project construction period, we will provide advanced and applicable technical training for grassroots cadres, farmers' technology and technology demonstration households in the project area, so that each administrative village has 3-5 agricultural science and technology backbones, and there are 1 household for every 10 households. Technology demonstration households.

(6) Construction objectives

The project construction adheres to the principle of sustainable agricultural development, transforms low-yield fields through the implementation of farmland infrastructure construction, improves the comprehensive productivity of farmland and the ability to resist natural disasters, and achieves high productivity and high efficiency through the adjustment of agricultural industrial structure and the promotion of new varieties and technologies. Give full play to regional resource advantages and local characteristics, promote development, increase agricultural efficiency, increase farmers' income, and develop rural areas.

1 Strengthen the construction of farmland infrastructure, realize farmland standardization and square transformation of low-yield fields through field construction, improve the comprehensive agricultural production capacity and improve the mechanization level through the matching of roads, bridges, canals, stations, electricity and small buildings.

2 Cultivate pillar-type agricultural industries, improve traditional agricultural production methods, develop market-oriented stereotyped products to the market, form pillar-type ecological agriculture industries with local characteristics, and drive the development of related industries.

3 Develop technology-based leading enterprises. During the construction of the project, a number of scientific and technological leading enterprises will be cultivated and established, and an industrialized operation mechanism of “enterprise + base + farmers” will be established, and order production, standardized production, unified brand and unified sales will be implemented.

4 Play the demonstration function of the project area. The project area will be built into a demonstration model of high-yield and high-efficiency ecological agriculture, providing experience for ## and the province's agricultural development. Effectively promote regional economic development.

Fourth, the construction content

(1) Water conservancy measures:

1 Newly built machine bridge 12;

2 Newly built small electric irrigation station 25;

3 new Su II irrigation station 4;

4 new hard channel 0.48 km;

5 new 186 small ditch buildings;

6 set up power lines 14 km;

7 Add 4 sets of 100KV transformers.

(2) Agricultural measures

1 Comprehensive land consolidation to achieve farmland standardization of 20,000 mu;

2 new construction machine road gravel pavement 5.5 km;

3 Add 10 agricultural machinery harvesters and 100 rice transplanters.

4 New seed warehouse 800 square meters.

(3) Forestry measures: 100,000 plants were planted with protective forests.

(IV) Training measures: According to the seasonal characteristics of the project area, the farmer needs to organize relevant training in a timely manner.

V. Investment budget and financing measures

1. Investment estimate:

The total investment of the project is 8.5 million yuan.

Of which: water conservancy measures of 6,553,500 yuan;

Agricultural measures of 16.01 million yuan;

Forestry measures 300,000 yuan;

Technology promotion 3.25 million yuan;

The initial work fee is 13,000 yuan.

2. Fund raising:

Apply for the central government's financial resources of 4.8 million yuan; provincial and municipal local financial support of 1.6 million yuan, the people raised 2.1 million yuan.

Expected benefits

1. Economic benefits:

Through land management, after the completion of the project area, 26,400 mu, the output value will be significantly improved.

1 Through the transformation of low-yield fields, the net increase of 100 kg of wheat, the income of mu increased by 75 yuan, and the increase of 1.98 million yuan;

2 Through the transformation of low-yield fields, the net increase of rice is 150 kilograms, the income of mu is increased by 120 yuan, and the income is increased by 3.16 million yuan;

3 After the completion of the project, the cost per acre can be 55 yuan, and the cost of the plan is 1.45 million yuan;

4 After the implementation of the project, a total increase of 6.59 million yuan, 249 yuan per mu, 319 yuan per capita.

2. Social benefits:

1 After the project is implemented, it can produce 6 million kilograms of weak gluten wheat annually;

2 After the project is implemented, it can produce 9.5 million kilograms of high quality rice per year;

3 After the implementation of the project, the high-tech penetration rate of the main body will reach 100%, which is conducive to giving play to the advantages of resources and is conducive to improving the utilization of land resources;

4 After the implementation of the project, it will promote the rapid development of pollution-free green agriculture in our land and benefit the people's health.

5 After the implementation of the project, it will be able to drive the establishment and development of our leading technology-based enterprises, deepen the adjustment of agricultural structure, improve the level of land intensive management, promote the transfer of rural surplus labor, and promote the development of other industries.

6 After the implementation of the project, due to the construction and transformation of farmland infrastructure, the water system irrigation and drainage function has been improved, avoiding repeated investment of one household irrigation machine, saving energy consumption, saving water and reducing agricultural costs. The construction of gravel pavement has improved traffic conditions, increased the flow rate of agricultural and sideline products, and increased the efficiency.

3. Ecological benefits:

After the implementation of the project, due to the ground remediation, the low-yield fields will be transformed, the facilities will be strengthened, new varieties, new measures and new technologies will be promoted, the quality of agricultural inputs will be regulated, and the soil will be improved to make fertilizer and water supply. Reducing agricultural pollution and protecting the ecological environment are conducive to protecting and improving soil fertility, improving comprehensive agricultural benefits, increasing farmers' income, and promoting the sustainable and healthy development of agricultural industrialization in our town.

Seven, safeguards

1. Organization:

In order to ensure the smooth implementation of the project, the ##2005 annual land management project leading group was established, which was composed of ##市发展局,##镇人民政府 and the main responsible persons of the relevant villages and units implemented by the project. Daily work.

Project technical guidance group list

2. Supervision mechanism:

In the implementation of the project, the project management and fund management are separated, the accounts are established separately, and the independent accounting is established. The internal supervision mechanism of the project is established to ensure the normal operation of the project and fund management.

3. Safeguards:

The project management department and the project implementation unit will sign a target responsibility letter, decompose and refine the construction objectives, contents and standards, strengthen project management, project bidding, and project quality supervision to ensure that the project is completed on time.

recommended article

popular articles