Internal business responsibility


Party A:

Party B:

In order to strengthen the management of the internal construction contract of our company, improve the quality of the project, shorten the construction period, ensure the full production, improve the economic benefits of the enterprise, and combine the responsibility, power and profit, and the specific conditions of the project, the two parties reached the following agreement.

The first project overview

1. project name:

2. Project Content: Area Layer

3. Contracting scope:

4. Contract cost:

5. Construction site;

The second construction period

Start date: Completion date:

The construction period will be delayed for one day, and the contract price of Party B will be awarded one day in advance for the contract price of Party B.

Article 3 Project Quality

1. Engineering quality level

2. The project is excellent, and Party A is responsible for the person in addition to the rewards given by the superior.

3. The project does not meet the quality level requirements, and the penalty party is responsible for the person.

4. 4. The political and economic losses caused by major quality accidents. Handle in accordance with relevant regulations.

5.

Article 4 Construction Safety

1. Eliminate major casualties.

2. The frequency of minor injuries is controlled below.

3. A fatal accident occurred during construction. In addition to the penalties prescribed by the superior, the construction team leader Yuan, the site safety officer Yuan.

4. A serious injury occurred, in addition to the penalties prescribed by the superior, the construction team captain Yuan. Site safety officer.

5. The frequency of minor injuries and injuries is increased by one thousand points for the construction team leader.

6. The economic loss of a casualty accident

7. There was no safety accident award during the construction period.

8.

Article 5 Social Security

1. Implement the higher-level laws and regulations, take people as the foundation, and take precautions.

2. The safety system is not perfect. No full-time security personnel, fine B yuan. Every time there is a public security case, the penalty is Fang Yuan.

Every time a criminal case occurs, the penalty is square.

3. During the construction period, there will be no major public security and criminal cases to reward Party B.

4. .

Article 6 Cost Control

1. Project cost range: Executed in accordance with the scope specified by the head office [1998] No. 9 file.

2. Savings in engineering materials. Party A and Party B are divided according to proportion, and over-expenditure is handled according to relevant regulations.

3. The labor fee content is controlled within the upper-level specified coefficient. The manager of the building number will pay the monthly salary amount. After the final settlement of the project, the surplus will be reissued and the deducted amount will be added. The loss will not be reissued.

4. Other matters:

Article 7 Turning over the comprehensive management fee and distribution

1. Party B's comprehensive management fee rate paid to Party A is %.

2. The distribution ratio of the Engineering Excellence Award is

3. After the completion of the project, the balance between Party A and Party B will be distributed proportionally.

4. The project losses are the proportion of both parties.

Article 8 Rights and Obligations of Both Parties

Contractor

1. According to the contractual contract, the supervision and management are good, the contract is fulfilled, and guidance, coordination and service work are done.

2. If the contractor is not well managed and has major economic losses or incompetence, the contract may be cancelled and the person in charge of Party B shall be replaced.

3. The reward and punishment clauses are honored according to the contract.

4.

Contractor

1. 3. Seriously implement the relevant laws and regulations of the higher authorities. Full responsibility for the management of the project.

2. Fulfill this Agreement. Establish a production management system headed by the construction team leader within the scope permitted by the system.

3. The risk gold mortgage is based on the total cost of the project.

4.

Article 9 Matters not covered in this contract. Execute according to the relevant policies and systems of the superior and Party A.

Article 10 Other

Article 11 This contract shall be in duplicate. Each party shall hold one copy and report to the head office. The signatures shall be effective after the signature of the two parties, and the project shall be terminated upon completion of the settlement.

person A person B:

Head office comments:

Date of signing: Year, month and day