Dear Governor of the Provincial Development and Reform Commission, and leaders of the Municipal Development and Reform Commission:
All leaders are welcome to visit our city to inspect and accept the city's urban water supply expansion project. Below I will briefly introduce the water supply project of the city.
**The city is the second city after the ** region, and it is one of the five super-developed cities in Shanxi Province. With the expansion of the city scale, the population has increased substantially due to the administrative area. Limitation, water shortage has become a bottleneck restricting the city's urban development. All previous municipal committees and municipal governments have attached great importance to urban water supply. In XX, we actively strived to run the project. With the strong support of the province, the city and the relevant departments, on September 12, XX, the Provincial Development and Reform Commission issued the document [XX] No. 904 in the Jincheng City. The approval of the feasibility study report for the urban water supply project was officially approved and submitted to the National Development and Reform Commission as a provincial government bond project in XX. In XX, the “February Report on the Feasibility of Urban Water Supply in the City” was compiled by the Shanxi Urban and Rural Planning and Design Institute, and the “Report on the Demonstration of Urban Water Supply Sources in the City of the City” prepared by the Shanxi Provincial Survey and Design Institute was passed. The Development and Reform Commission and the Construction Department organized the “Engineering Feasibility Study Report” Review Meeting and the Provincial Water Resources Committee “** City Water Source Argument Report”.
On December 15th, XX, the Provincial Development and Reform Commission issued the [XX] year No. 1239 "Shanxi Provincial Development and Reform Commission on the preliminary design of the water supply project in the urban area of ​​the city." ** After the municipal water supply expansion project was approved by the Provincial Development and Reform Commission, the municipal party committee and the municipal government attached great importance to it. On March 19, XX, the deputy secretary of the municipal party committee was established as the chief commander, and the executive deputy mayor of the municipal party committee was the executive deputy commander. The water supply expansion project headquarters composed of the bureau, the Development and Planning Bureau, the Public Utilities Bureau, and the Water Supply Company shall be responsible for the preliminary preparation project approval, engineering survey, design commission, and bidding.
Entrusted by the municipal government, the municipal water supply expansion project headquarters is the legal entity of the project. In order to ensure the quality of the project, bidding is carried out in strict accordance with the procedures prescribed by the state, and Shanxi Huaan Tendering Co., Ltd. is entrusted to act as agent. Entrusted Shanxi Provincial Urban and Rural Planning and Design Institute to compile and water resources argumentation commissioned by Shanxi Provincial Survey and Design Institute to conduct exploration and mining combined with sinking wells, the other projects were all bidding, and the supervision bidding was Shanxi Unicom Construction Supervision Engineering Co., Ltd. For the ** City Water Resources Exploration Drilling Team, the water plant project bidding is the third branch of ** City New City Construction and Installation Co., Ltd., the distribution and distribution network project is the third branch of ** City Construction and Installation Company, ** Municipal Municipal Corporation **City Jian'an Headquarters, ** City Water Supply Company, Shenjing Pump House Project is **Kaiji Construction Company, Automation Control Engineering is Shanxi Keda Automatic Control Engineering Technology Co., Ltd., Transmission and Distribution Engineering is Shanxi Xintian Electric Power Industry Co., Ltd. Limited. After bidding, Shanxi Unicom Engineering Construction Supervision Co., Ltd. supervised the whole process of the project's water distribution, water plant construction, automation and other projects. The construction quality supervision station of the city carried out quality supervision of the project. The project was completed in April XX. The groundbreaking of the foundation was officially started. It was completed in April XX and began trial operation in January XX.
According to the initial establishment, the total investment of the project is 46.82 million yuan, and the total investment of the actual project is 39.776 million yuan, of which the water source project is 11.582 million yuan, the water plant construction is 7.158 million yuan, the water pipeline is 7.903 million yuan, and the water distribution pipeline is 9.727 million yuan. Equipment investment was 3.403 million yuan.
The water source engineering sinking project began in July XX and was completed in August XX. A total of 18 wells were drilled and 18 well pumping houses were built. The total water output was 23,280 cubic meters per day. The municipal government invested 5.86 million yuan to purchase 10 eyes of water wells to be delivered to the water company for unified management. The above 28 wells were subjected to water sample collection and water quality assessment, all of which met the sanitary standards for drinking water.
The construction of the water plant began construction in April XX and was completed at the end of XX. It has completed a 3,000 cubic meter clear water tank, a pressurized pump room, a comprehensive office building, an auxiliary room, a chlorination room, a boiler room, and a laboratory test. Room, etc.; the Dongshui Plant was rebuilt, the original pressurized pump room was rebuilt, 4 sets of pressure pumps were replaced, a new transformer room was built, and frequency conversion cabinets and electrical control equipment were added.
The water pipe network project started construction in XX and was completed in XX. A total of 42115 meters of water source to water plant area dn160mm-dn400mmpvc water pipeline was completed, and 58 valve wells were completed.
The water distribution network project started construction in XX, and was completed in May XX. The water plant area was completed to 33115 meters of dn110mm-dn250mmpvc water distribution pipeline and 126630 meters of PVC distribution pipeline below dn110mm. After the installation of each pipe network, the strength test was carried out strictly, which met the requirements of design and construction acceptance. All the pipe networks have been operating normally since the grid connection.
Water supply equipment: centrifugal pumps, electric single beams, various valves, power distribution cabinets, transformers, automatic control cabinets, etc. have all been commissioned and operated, and passed the on-site inspection and acceptance to meet the acceptance criteria. All equipments are operating normally.
Leaders, the city's water supply expansion project under the care and support of the leaders of the province, the city, and the city, through the joint efforts of the participating units, officially connected to the water in XX, the construction of water supply projects It laid the foundation for the sustainable development of the city, provided reliable guarantee for residents and all walks of life, solved the problem of long-term water pressure and water quality in urban water, and greatly eased the tension of urban water supply. The formation of an interactive and complementary water supply network with two water sources and two water plants for urban water supply has completely changed the situation that the water supply of a water plant in the past was insufficient and unstable, ensuring safe and stable water supply for the city and enhancing urban functions. It has improved the level of urban modernization and laid a solid foundation for building the city into a regional central city.
Thank you again for your leadership.