Work Summary > Safety Work Summary

Safety Inspector Personal Work Summary


If I say that my XX year is a word, I think it should be - enrichment. In the past year, the words such as pipeline positioning, valve wells, pressure regulating boxes, and rectification have always appeared in my work. Every day, I collaborate with colleagues in the departments such as the inspection office, the engineering office, the comprehensive coordination office, and the pressure regulation center. I am doing a good job in my own job; although the construction is relatively fluid, I still know most of them. With the freezing of the Yitong River, the work of the year will also be drawn to a full stop. Now I will summarize my work for one year as follows:
First, the work situation
1. Pipeline positioning work: This year, a total of pipeline positioning times were carried out, and the total number of kilometers was measured on foot; the foreign side assisted PetroChina and Sinopec units in pipeline positioning; the internal assistance engineering department, the inspection line inspection department, and the gas service center The Department of Integrated Coordination and other departments conduct pipeline positioning; they have made their own efforts for engineering construction, emergency maintenance and pipeline protection. This year, due to the return of the pipeline locator to the factory for one and a half months, the new inspection pipeline locator at the inspection line and the fact that I participated in the rectification, the number of pipeline positioning was reduced compared with the previous year, but the pipeline positioning task was successfully completed. .
2. Renovation of valve wells and surge tanks: During the year, I participated in the rectification of safety hazards of valve wells and surge tanks from mid-April to the end of November; the rectification of the pressure regulating tanks and the rectification of the valve wells were carried out. jobs. I am mainly responsible for the contact work between the construction team and various departments, leading the construction team to carry out the inspection on the construction site, assisting the rectification team leader in the construction process inspection and post-construction inspection, collecting and sorting data. After 7 months of rectification work, the expected rectification work objectives were completed.
3. Other work: Participated in many large-scale dangerous work during the year, responsible for on-site safety monitoring during hazardous operations and gas detection using leak detectors; participated in many rescues such as the rescue of ф325 pipeline in Chaoda District Work; and cooperate with the leadership to carry out other daily work.
Second, the harvest is about the past year is also the year I have the most harvest. In this year's work, through continuous practice, I can more skillfully use pipeline locators, leak detectors and other instruments; can complete some independently The task of the leadership. Through one year of pipeline positioning work, I am more familiar with the location of some pipelines; through rectification work, I am not only familiar with the geographical location of some users, but also familiar with the position of the surge tank and the position of the valve well, which will be my future. Work has accumulated a valuable asset.
A full year has passed and a new year is coming. In the future work, I will work harder to learn from my colleagues around the world, learn their experiences and some new knowledge, and apply them to my daily work. I will work harder and add my own confidence to the long-term safe production blueprint!

recommended article