Summary of engineering safety supervision work


The project is xx company xxx community, the building area of ​​the community is about xxxxx square meters, there are twenty-four single projects, including small high-rise 1 ~ 5 # floor, multi-storey 6 ~ 24 # floor and basement a, b and pump house project . There are Maoshi drainage ditch, Maoshi retaining wall, slope protection and mountain construction. The supervision unit is Shanghai Shenfeng Engineering Construction Supervision Co., Ltd., and the construction unit is Bianli Construction Group Co., Ltd.

Since the official start of construction on August 1st, XX, our unit has completed the construction quality, safety and progress of the project according to the construction drawings provided by the owner and the specific requirements of the owner, according to the relevant national building regulations and technical standards, design files and construction contracting contracts. The whole process is supervised in terms of cost and other aspects.

After the unit entered the site, we actively investigated the construction site and surrounding environment, and informed the construction unit of the safety responsibility, and assisted the construction unit to timely handle the safety supervision procedures of the project. After the construction unit entered the site, it reviewed the safety production licenses of general contracting, professional subcontracting, labor subcontracting units, and mutual security agreements. The number and qualifications of the main responsible person, project leader, full-time safety production management personnel and special operation personnel of the construction unit were examined, and the construction site safety production guarantee system of the construction unit was inspected. The safety technical measures or safety special construction plans in the construction organization design were reviewed, and combined with the construction site crash, the safety supervision work of the construction units was organized, and the minutes of the relevant meeting were carefully completed.

While reviewing and assisting other parties, our unit has compiled safety supervision plans and implementation rules for lifting and hoisting safety supervision. Supervisor personnel are pre-post safety education and equipped with necessary safety protection articles;

At the first site meeting, we focused on safety supervision objectives, work requirements, and safety supervision personnel.

The on-site supervision organization of the unit has entered all the construction machinery and equipment on the construction site and the safety facilities built on the site, including the electric welding machine and the lifting machinery, which have passed the on-site safety supervision and inspection before they are put into use.

Assist the construction unit to establish and effectively adhere to the weekly regular meeting of the construction site, as well as the irregular construction safety regular meeting system, and actively coordinate, check, supervise and implement the relevant work arrangements, planning requirements, and handling opinions of relevant issues. Our company has established and implemented the 'Monitoring Work Monthly Report' system to conduct relevant comments and reports on construction progress control, quality control, safety management, and implementation of supervision work.

The professional supervision engineers of our unit will issue the supervision engineer's notice and supervision work contact list to the construction unit in time for the various hidden dangers discovered during the construction process, and submit the report to the owner. All kinds of special inspections organized and implemented in response to the safety situation in the construction process are reported in the form of 'supervisory inspection special report', on the specific problems found in the inspection, the specific requirements and completion of the rectification, and timely report to the owner. For the part of the project with high risk, the full-time safety supervision personnel shall implement the supervision of the side station. If any hidden dangers are found during the construction process, the relevant units may be actively inspected and urged to implement the rectification, and the completion of the rectification shall be reviewed and confirmed. If the situation is serious, the construction unit is required to temporarily stop the construction and report the construction unit in time. If the construction unit refuses to rectify or does not stop the construction, the project supervision unit shall promptly report to the relevant competent department.

During the inspection and side-by-side inspection, safety hazards, hidden dangers, and timely instructions were resolved to eliminate unsafe factors in the bud.

During the construction process, supervise the operation of the construction site safety production assurance system of the construction unit and its full-time safety production management personnel to arrive in time and effectively carry out the work. At the same time, it supervises the implementation of safety special construction plans or safety technical measures focusing on the more dangerous sub-projects. Supervise the construction unit to strengthen the scientific management of safety production from the system and organization. Supervise the construction unit to establish and improve the safety production system.

Participate in the special safety inspection and safety supervision department organized by the construction unit to comment on the safety production status after the project safety inspection.

In terms of safety information, our company is staffed with full-time information staff. It will regularly organize and collect image data and related materials, and make a backup. The safety supervision materials that have been completed will be archived.

The unit project organization of our unit, the unified use table meets the data management and form requirements of the construction supervision supervision standard of Jiangsu Province.

The safety supervision personnel of our unit recorded the safety production and safety supervision work of the construction site on the same day in the supervision diary, and recorded the safety construction problems found and handled. The Director reviews and signs comments on a regular basis.

In order to better fulfill the supervision services entrusted by the owner and successfully realize the project construction quality objectives, construction period objectives, investment objectives and safety objectives, our company will continue to work hard, adhering to the "service integrity, supervision, careful, pragmatic, continuous improvement Based on the quality policy, we will establish a service aim that allows the owners to be 100% assured. High quality, high level and high efficiency reflect the value of supervision work.