Summary of the third phase of work on special rectification of safety production


Through the special inspection and classification and rectification of 6 months, the special work plan for safety production was implemented. On the basis of the first two phases, all the work of the third phase has been completed in accordance with the requirements of the third phase of the work plan for the special rectification of safety production. In the third stage of work, the company and its branches were carefully organized and carefully arranged to conduct on-site investigations and review of safety hazards, and to classify and rectify the problems identified. The summary of the third phase of the special rectification of safe production is as follows:

First, carefully organize and carefully arrange

According to the requirements of the “Notice on the Special Rehabilitation of Safety Production in the Whole Company”, the “Work Plan for the Third Phase of Special Rehabilitation of Safety Production” was first formulated, and the duties and tasks of various functional departments and branches in special rectification were clarified. Schedule the deployment. The company specially convened the third phase special rectification work conference, clearly put forward the rectification requirements and objectives. The company's monthly and branch-level safety production meetings will be used as a return for special rectification work. All departments and branches must report the special rectification situation. In the third phase of the special rectification work of safety production, all departments and branches have carefully arranged and conducted on-site investigations, and achieved organization, arrangement, progress, and implementation.

Second, special investigation and classification

According to the work plan of the third stage, we mainly classified and rectified the management and use of civil explosives, mine ventilation, tunneling, electrical equipment, lifting transportation, mining engineering, mine recovery, underground drainage and tailings pond management. .

In the special inspection of the classification, the production department was responsible for special inspections such as underground ventilation, excavation and upgrading, and went deep into the underground inspection for more than 70 times. 57 problems were found, including 15 ventilation, 9 mining operations, 10 excavation works, etc. Formulated 24 rectification plans. In the third phase, the Ministry of Safety conducted a total of 68 inspections and found more than 100 problems, and supervised the special rectification of the branch. The Ministry of Technology and the Ministry of Safety conducted more than 30 investigations on the tailings ponds of the first to fourth branches, found 24 problems, formulated rectification plans for major problems, and supervised the implementation of rectification. The Ministry of Security, the Assets Department, the Supply Department and other departments and departments have conducted investigations on the branch offices and the competent work sites according to the requirements of the program. Among them, 29 civil explosives were detected and 16 equipment management were found. The problems found were carefully corrected. . The accidents are eliminated through fines, rectification within a time limit, and partial shutdowns. In particular, the major accidents are ordered to suspend production, and the technical department formulates rectification plans and the branches implement rectification. After review by the safety management department of the company and the branch, all the rectifications have been completed.

Third, eliminate hidden dangers and ensure safety

Through the special inspections from May to October, a total of 256 safety hazards were identified, including 64 mine ventilation, 29 civil explosion management, 57 mining, 36 electrical equipment, 20 lifting and transportation, tailings storage. 24, the other 26 places. The general problems were rectified at the scene, and rectification plans were formulated for the major safety hazards found. A total of 24 rectification plans were formulated, and all rectifications have been completed. After special rectification, we have eliminated many safety hazards, created a safe and healthy working environment for safe production, and ensured the safety of operators.

The special rectification work of the third stage has been completed, but with the continuous deepening of production, the continuous changes in production operations and the environment, new insecurities will emerge, and the security problems we face are still very serious. Therefore, we must always put safety work in the first place, and we must not relax at the moment. We must adhere to the special work of safety production.