Work Summary > Safety Work Summary

Summary of construction safety experience work


The distribution center always attaches great importance to the safety management of the contractor, and firmly grasps the safety construction education to ensure that the project is safely constructed without accidents.

First, strict screening of the construction team

According to the “ Safety Management Regulations for Construction Sites of Shandong Petroleum Branch”, the distribution center will strictly screen the construction team and prohibit the contractor from subcontracting and subcontracting the project; the special operations personnel without qualification and no operation certificate shall not participate in the construction. Homework; construction workers engaged in operations must not be over 60 years of age.

Second, strengthen construction workers safety education

The distribution center starts with the characteristics of the company, combined with the “I want to be safe ” activity, focusing on the possible hazards and hse precautions in the construction, and using safety accidents as a warning, on the one hand, the safety education is targeted, on the other hand It also sounded the alarm for the construction workers. After the safety education is over, the trainers must complete the safety education questionnaire independently. After passing the exam, they will sign a Safety Commitment with the distribution center. The “double insurance” will ensure that the operators strengthen their construction safety awareness.

Third, strengthen the safety supervision of the construction site

The distribution center will issue the library entry permit for the foreign construction workers. After entering the factory, the gatekeeper must verify the documents and keep the fireworks, mobile phones and other items unrelated to the construction.

During the construction, the full-time safety supervisor will guide the on-site workers wearing labor protection articles and conduct full-process monitoring of the entire construction process, and propose rectification opinions on the hidden dangers in the construction operations, and supervise the rectification. After the completion of the construction, the power supply should be cut off in time, and the construction site should be cleaned and closed.

Since the beginning of this year, the Shidao Oil Depot of Weihai Distribution Center has carried out construction work such as renovation of fire pools, anti-corrosion of pipelines outside the reservoir, and renovation of fences in the reservoir area. The distribution center has submitted three suggestions for rectification, such as “the protective net is not installed in place, and the cable passes through the road without casing”, effectively urging and ensuring construction safety .