2014 Engineering Department Personal Work Summary


Engineering Department Personal Work Summary

One year spent similar, each year is different. The 2019 year of fear is about to pass, and the more challenging 2019 is beckoning to us. After this year's busyness, I have gained a lot of joy and happiness, and I have discovered some shortcomings of my own existence. Now I will be in Nanjing this year. The personal work of the Lukou International Airport Foundation Engineering Project Department is summarized below.

In 2019, for me, it was also a meaningful, valuable and rewarding year. In this year, we completed the construction task of the Nanjing Lukou International Airport Foundation Project. This is a breakthrough for me who first engaged in airport construction for a road and bridge technician. Since entering the Nanjing Airport project in September 2019, with the guidance of the project leader and the help of my colleagues, I have met the Nanjing Airport Project Department in a short period of time and have been well integrated into the project team. Various work. Here, I would like to thank the project leaders for giving me this opportunity to work and study. I would like to thank my colleagues for their help and support in my work and life. I will continue to work hard, be proactive and do better.

Since entering the project, the main tasks I have completed are: reviewing the construction drawings and calculating the engineering quantity; assisting the chief engineer of the project to prepare the construction plan, technical disclosure and operation instructions, and carrying out the work of drawing and technical and programwork; assisting the project chief engineer and Supervision, design, communication and communication of the owner; do a good job in the management and preparation of the project construction materials, and be responsible for the completion of the project data volume, acceptance; assist in cooperating with other departments to carry out work. details as follows:

I remember that when I first started work, the leader arranged me to review the construction drawings. At first, I didn’t care much. I thought that I was born in the civil engineering industry. There was no problem in looking at the pictures, but when I got the first construction drawing, I found out that the building The picture is not as simple as I imagined. In the face of complicated construction drawings, I have no way to start. I don't know the anchor length and arrangement of some steel bars. I don't understand the relationship between the tension of the prestressed anchor cable design and the locking value. In particular, without the reference to the engineering quantity schedule and the unfamiliar construction construction specifications and acceptance criteria, I am more aware of the arduous task. However, in the face of difficulties, I did not back down. By consulting professionals and seeking help from colleagues, I found a large number of specifications, regulations and national architectural standards design atlas on the Internet. In the slow exploration, I finally got some clues, and reviewed the errors, omissions, inconsistencies and unclear design problems in the drawings. After receiving the design reply, I calculated the demand for the project materials and successfully completed the leadership. The work delivered. Through this work, I not only learned to look at the construction drawings and calculations, but also had a deep understanding of the construction and technology of the building construction, which laid a solid foundation for future work.

With the initial completion of the review work, I gradually shifted my focus to follow-up on engineering technology management and service, assisted the project chief engineer in preparing the construction plan, technical disclosure and operation instructions, and carried out drawings, techniques and plans. Work as a cross-border; assist the project's chief engineer with the supervisor, design, and owner's communication; do a good job in the management and preparation of the project's construction materials, and be responsible for the completion of the project's volume, acceptance; assist in cooperating with other departments to carry out work. Through the above work, I realized the importance of the engineering department. Because the engineering department is the most direct technical service and management, we must do things well and be beautiful. At the same time, under the guidance of department heads, I learned some aspects of construction technology management and organization, and can initially carry out some engineering technology management and organization work. I know that focusing on the company's future development needs, this alone is not enough. It also needs to strengthen learning and exercise to meet the company's requirements and meet the needs of the company.

At present, the experience and professional knowledge of the project technicians are relatively weak. Some things must be completed through various efforts. Here, it is very important to assist the cooperation. Through mutual help with other colleagues, I learned a lot of ways and principles for people to live.

The hard work and always pay off. With the joint efforts of all of you, the basic project of Nanjing Lukou International Airport successfully completed the construction task and won the approval of the project leader. Of course, I also had some minor mistakes and problems in my work, but the department heads pointed out to me in a timely manner and promoted the maturity of my work.

In 2012, this has brought doubts and fears to many people. The year that the Maya called the end of the world is about to pass. Looking forward to the beautiful 2013 is a year full of opportunities and challenges. It is a year of development and growth. In the face of various unknown difficulties and challenges in the future, I will never back down, go forward, summarize past experiences, and work hard to correct the deficiencies in the past work. In the future work, I will strictly demand myself and do my job well. Continuous learning and accumulation, constantly asking questions, solving problems, constantly improving ourselves, ensuring high efficiency and high quality. Do our best for the company's development.

Engineering Department Personal Work Summary

I have been working for 5 months in the blink of an eye. Looking back at the work over the past few months, I have experienced many and grown a lot. In the company's vigorous development, as an employee of the company, I am excited and proud of the company's leap-forward development, but at the same time I feel deeply that I have to keep up with the times. The company's glory is inseparable from the leadership of the right decision-making and the hard work of every employee. Only by being good at summing up past achievements and mistakes can we improve our working ability.

When I first entered the company, I really had no confidence in the non-engineering profession. I was afraid that I couldn’t do the task that the leader gave me. I was troubled by the company. The most obvious thing was that when I first attended the company’s regular meeting, I couldn’t understand the company. The department heads report what the work report is, let alone the many technical terms that our engineering department is involved with. But the manager is really a good leader or a very good teacher. When she was officially working, she gave me some very simple jobs, but for those who have a basic gap. There are still some difficulties, so I make a lot of mistakes and waste my time. When she knows that my foundation is particularly bad, I will patiently teach me how to do it, even the most basic EXCEL function. The CAD function is indispensable to teach in place, but also boldly let me draft the contract, do some budget, calculate the amount of engineering, etc., but also hand over the process of the signing contract and the payment process to me to let me be responsible. The company's engineers also gave me a lot of help. He has rich experience and professional knowledge. He gave me a lot of guidance in his work and is also a good teacher for my progress. Now I can not only complete the tasks assigned to me by the leaders independently. The most obvious progress is that now I can not only understand what the various departments report, but also find out what they need to do next. Work, what needs to be done in conjunction with other departments, and this is due to the help of the company leaders and colleagues.

After half a year of work, although the results have been affirmed by the leaders and colleagues, the lack of work also requires leadership and colleagues to criticize, I also realize that I have many shortcomings, the biggest drawback is carelessness. Usually I do the most is the statistics and payment of engineering quantities, but I often do less calculations, wrong calculations or decimal points, wrong numbers, etc. Many of them are good when I wait for others to review these small errors. However, the appearance of a small mistake is equivalent to the work of my work. It not only wastes time but also delays the company's work process, and even worse, it may bring economic losses to the company. Therefore, no matter whether you do any work or not, you must be careful. First, make sure that the self-test is correct and then hand it over to the relevant leaders to try to minimize the error rate. I also have a shortcoming that I don't like to do the work I don't like to ask others. Maybe I am afraid that the question I asked is too simple and embarrassing, so I will try to check it online, but this method is a waste of time, even Sometimes the method of querying the Internet is wrong, and it also delays the work process. So in the future I should discard this shy mind and be brave enough to learn from others, and I can progress faster.

In the work, I will always maintain a strict working attitude, a strong sense of responsibility, loyalty to the job, and the highest priority of the company's interests. Although the work I do is a simple and basic job, only doing these simple and trivial tasks is the best way to support leadership and contribute to the company's development. It is like a building that cannot be separated from the foundation. Like a small brick, I have to give full play to the role of such a brick and contribute to the steady development of the company. But a building can't be built with only one brick, and a company can rely on teamwork to develop better. So I am honored to be part of the company's team and to build a good team. The team enables our company to face the wind and rain more calmly. The team makes our department work more complete and faster. Therefore, I can unite my colleagues in the work and work closely with my colleagues to do my best for the smooth completion of the work.

Looking forward to 2019, I will be more diligent in my job and at the same time work hard to learn professional knowledge. As long as the tasks assigned by the leaders in the work, they will be resolutely completed on time, in quantity and accurately, and provide a satisfactory result of the leadership without any reason, excuses and conditions. This is also very helpful for my personal growth! In addition to my work, I have to study hard to make up for the serious gaps in my professional knowledge and lay the foundation for a better job. Only by working hard can the company develop faster. Only by studying hard can we improve the work level. Only by summing up our own gains and losses in time can we better improve our own deficiencies.

Engineering Department Personal Work Summary

Xxxx years, I am also the second year of my work in the engineering department of xx Property Co., Ltd. During this year, I am law-abiding, study hard, study hard, work hard, and treat my duties with diligence and dedication. The maintenance work has played its due role in the foreman of the engineering department. The summary is mainly as follows: 1. Familiar with geographical location and computer room in each area, equipment room

When I first came to the engineering department, I was completely unfamiliar with the environment and equipment here. Under the patient guidance of Li, the experience was explored, thought and summed up, and Li’s supervisor led many times to explain and train on the spot. Now I am right. The geographical location, electrical equipment, high and low voltage circuit systems, fire protection systems, domestic water and elevator system maintenance and maintenance work are all well understood. Second, do a good job in the management of the maintenance team, do a good job of the task of the superior and the call center repair work of the customer service center. I lead by example, the class members are required to abide by the law, comply with the company's rules and regulations, do not be late, do not leave early, strengthen The duty of the class members is trained, and the inspection and operation records of the equipment are carefully done. Arrange the work arranged by the superiors, arrange the arrangements, transfer the class members, and deal with them quickly. Calling for repairs in the customer service center, listening carefully, recording the unit of the call, the content of the repair and the location of the fault, etc., quickly mobilized the class staff to deal with it quickly, and explained and reported the problem to the customer with large faults or problems that could not be handled. 3. Formulate the annual maintenance work plan and maintenance work standards

On the basis of last year's work, the engineering department formulated a detailed facility and equipment maintenance plan, and decomposed the plan into each month. The detailed maintenance work content and standards were formulated, and the implementation was carried out to ensure the quality of the work. And efficiency. 4. Pay attention to the safe operation and inspection of equipment and facilities to ensure the safe operation of equipment and facilities.

The Engineering Department has always placed the safety of facilities and equipment in the first place. Every week before the holidays, it will formulate safety inspection, maintenance and repair work meetings for holiday facilities, formulate work plans, implement project plans, completion time and responsible persons, and Check the time, clarify the key points of work, and check afterwards to ensure the safe operation of the building's facilities and equipment. In daily work, emphasize the safety operation and self-safety awareness during maintenance work, and prevent the occurrence of work-related accidents.

Operational safety: Due to the special nature of the department's work, employees in this department often need to contact electric appliances, electric welding, open fire, climbing and other operations. In order to ensure the personal safety of the operators, the employees are often given safety education before the class to strengthen the safety awareness of the employees. When there are dangerous operations such as moving electricity and climbing, make sure that someone is on duty. There were no safety incidents in the department staff throughout the year. The staff of the department was trained in the common sense of equipment safety, which raised the awareness of safety of all employees.

Safety of equipment and facilities: Regularly carry out special safety inspections on various equipments, and carry out safety inspections on building distribution wells and pipeline wells every month; carry out safety inspection and dust removal on transformers and low-voltage distribution cabinets of power distribution rooms in the spring and autumn. Every time before the holidays, we must organize a safety inspection of the facilities and equipment of the hotel headquarters and offices. In the rainy season, safety precautions were taken throughout the building to ensure the safety of the building during the rainy season; a once-a-day safety inspection of key operating equipment was carried out, and the accident was discovered and dealt with immediately. The equipment type, origin and quantity of the six pairs of buildings are recorded in detail. The seven departmental engineering departments complete the main work items:

1. Complete the electrical maintenance work of the life pump and its control cabinet.

Complete the spring and autumn seasons to the transformers of the power distribution room and its high and low voltage busbars, porcelain dedusting and busbar bolting work.

3 peripheral floor tiles are repaired. 4 The public walkway wall is repaired.

5 All strong electric wells are cleaned and cleaned, and dust maintenance work. 6 All public walkway lights are retrofitted for energy saving. 7 Check and seal all fire hydrants.

8 Clean and sanitize all the weak electric wells, and carry out dust removal maintenance work.

9 Complete the survey of the water, electricity and gas pipelines of the building, and regularly check and fasten the distribution terminal of each floor of the office building/residential building to prevent accidents.

10 Completed regular maintenance and replacement of public walkway lighting in the building. 11 completed the rust and renovation work on the building's surface, 14th floor and negative 2 fire fans. 12 Complete the inspection and maintenance of the door, door closer and door lock of the floor fire escape passage. 13 Complete the annual maintenance and dust removal maintenance work of the low-voltage power distribution room of the power distribution room.

14 Completed the dust removal of the A office building/B residential building and the fastening of the busbar bolts. 15 Completed the removal and inspection of the hood of the A office building/B residential building walkway. 16 completed the layout of the new management office desk and the layout of the network cable. 17 Complete the festival's lantern arrangement for the A/B lobby. 18 Complete the fixing of all the ladder doors of the mall 6F~1F.

20 completed a test call to the A office building/B residential building and the negative one minus two fire calls

21 Inspection, tracking and maintenance of the remaining problems of the project, water leakage in the main power distribution room and leakage inside and outside the house. 22 In addition to completing the work of the above projects, complete routine maintenance work. During the year of xxxx, I led the engineering staff to inspect and maintain the electrical equipment and public facilities of the building.