Secretarial knowledge > commitment

Civilization Construction Commitment


At the time of submission of the design file to be completed by the contractor allowed by the design qualification level and business scope

Between: The contractor must provide the relevant design files 30 days before the start of the project requiring secondary design, without ensuring that the construction period is not affected.

The name of the plan and the report and the time of completion shall be provided: a. Within 5 days after the signing of the contract, the contractor shall provide the supervisor and the contractor with a plan for the overall progress of the construction; b, to the supervisor on the 25th of each month and The contractor and the agent will report the project progress report and the next month's construction progress plan, the material plan and the fund use plan.

Responsibility and requirements for construction safety and non-night construction lighting: The contractor is responsible for all work and bears all costs, and all consequences arising from the contractor's reasons are borne by the contractor.

Requirements for office and living houses and facilities provided to the contractor: 2 on-site office space, 20 square meters each, 4 sets of office furniture, 1 set of file cabinets; 1 room of 40 square meters, conference tables and chairs 1 set; 2 on-site dormitory, 20 square meters each, 4 sets per bed. The above requirements are included in the total contract price.

Procedures for construction site traffic, sanitation and construction noise management required by the contractor: The contractor shall be responsible for handling the relevant provisions of Xiamen City and bear corresponding responsibilities. The expenses shall be implemented in accordance with relevant regulations, and the expenses are included in the total contract price. In the middle, the package is used.

Special requirements and cost commitments for finished product protection: The contractor is responsible for protection before the completion of the project is handed over to the contractor. If the completed project is damaged during the protection period of the contractor, the contractor shall be responsible for repairing and bear the corresponding expenses; if the contractor uses the completed project that has not been handed over in advance and causes the project damage, the contractor shall promptly repair the work, and the relevant expenses shall be The contractor bears.

Protection requirements and cost of underground pipelines and adjacent buildings, structures and ancient and famous trees around the construction site: The contractor is responsible for the protection of buildings and structures around the project. This part of the cost is included in the total bid price of the contractor. in. The contractor shall report the protection plan for the protection of underground pipelines and ancient and famous trees around the construction site. After the approval of the engineer and supervision engineer dispatched by the contractor, the contractor shall do the protection work, and the protection fee shall be reviewed and approved by the contractor. The contractor shall bear the responsibility. If the contractor causes damage, the repair cost shall be the responsibility of the contractor.

Requirements for cleanliness of construction sites: The contractor shall ensure that the construction site is clean in accordance with relevant regulations and civilized construction requirements of Xiamen City. The construction shall strictly abide by the “Regulations on Quality, Safety and Civilized Construction Management of the Automobile City Comprehensive Service Building” to achieve safe and civilized construction. Vehicle access passages in the yard shall be provided with car wash tanks and other facilities as required; the site shall be cleaned up to meet the requirements of municipal environmental sanitation before the handover, and the construction site shall be clean and tidy. The costs incurred shall be borne by the contractor, as the contractor violates the relevant regulations. The losses and fines are borne by the contractor.

Other work that the contractor agreed to by the parties should:

a. The underground pipeline information provided by the contractor to the contractor is only the information that the urban construction archives can provide. The contractor should verify the authenticity of the information and all the problems caused by the contractor's unverified clearness are the responsibility of the contractor.

b. The contractor shall effectively protect the level points, coordinate points and control points provided by the contractor. If the contractor is damaged or lost during the construction process, the contractor shall contact the original flat-loading unit for resetting, and the expenses incurred shall be borne by the contractor.

c. If necessary, the contractor must cooperate with the construction of power supply, water supply, municipal, cable television, telecommunications, and internet.

d. Handle the project construction report and start-up procedures to the construction administrative department of Xiamen City in time to ensure that the construction starts on schedule.

e. The contractor must be responsible for coordinating and handling the surrounding local relationships and ensuring the smooth completion of the project. All consequences arising from the adjacent relationship are borne by the contractor.

f. Temporary land use, occupation of roads, temporary water use, etc. required for construction shall be handled and assumed by the contractor.

cost. The contractor is responsible for protecting the water meter and electricity meter handed over by the contractor and paying the water and electricity expenses on time according to the contract.

g. The project that the contractor separately issues is: municipal, power supply, water supply, gas, green, cable TV, communication,

Visual intercom, elevator and other professional projects. The contractor is responsible for the management and coordination of the general contract during the construction, and the total package management fee and cooperation fee

It is included in the total price of the contract. The contractor in the construction shall not take the total package management fee and the matching fee to the contractor. The contractor shall bear the

Responsible for providing vertical transportation and coordination with related majors. Use of the above subcontracting unit

The water and electricity fee shall be collected by the contractor from the relevant subcontractor and the contractor shall provide assistance.