Fan Wen Daquan > Contract Model > Tendering Contract Model

Highway Engineering Construction Supervision Contract Attachment File


The form, scope and content of the auxiliary file A supervision service

First, the form of supervision services

1 service requirements

Example: Requirements for the qualification of the supervision unit, the main method of supervision service and the affiliation of the supervision work.

2 organization

Recognize the requirements for the establishment of supervision service agencies, the arrangement of work plans, and the qualifications of key personnel.

Second, the scope of supervision services

1 service range

Example: The scope of work and scope of work included in the supervision service.

2 service goals

Example: The nature, purpose and main objectives of the supervision service.

Third, the content of supervision services

For example, the specific supervision work in each stage of the supervision service listed in this article should be summarized mainly with reference to the contents of the “Code for Construction Supervision of Highway Engineering” and supplemented according to the specific conditions of the project.

1 Prepare a supervision plan or plan;

2Familiar with the contract file to understand the construction site;

3 Participate in the pillar and design work, review the retest results and construction drawing design submitted by the contractor;

4 supervise and inspect the contractor to establish a quality assurance system;

5 presided over the first site meeting and regular site meeting;

6 has announced the start of the project to approve the start of a single project;

7 to review the qualifications of the resident representative authorized by the contractor and the qualifications of other major technical and management personnel stationed at the site;

8 Accepting the contractor's site laboratory to review the qualifications of its personnel;

9 Establish a test and test work system for supervision, and independently carry out the test and test work of supervision in accordance with the prescribed frequency;

10 to approve the quality of the original materials and complete sets of equipment that the contractor intends to use in the project, as well as the process test and standard test;

11 to review the performance and quantity of the mechanical equipment that the contractor intends to use for the project;

12 to approve the construction plan and main methods or processes for the contractor to implement the project;

13 Review the subcontracting contract and subcontractor's qualifications to control the quality of important outsourced finished or semi-finished parts;

14 to approve the overall progress plan submitted by the contractor, inspect and supervise the contractor to implement the progress plan, and approve the contractor’s amendment plan;

15 The contractor is required to carry out construction according to the contract conditions, technical specifications and supervision procedures, and comprehensively supervise, inspect and control the quality of the project through means of side stations, inspections, inspections, tests and whole experience collection;

16 Issue the intermediate delivery certificate;

17 Investigate and deal with engineering quality defects and accidents, and when major quality accidents occur, urge the contractor to report to relevant departments as required;

18 issued a suspension order;

19 accurately measure the completed project;

20 issue an interim payment voucher;

ZI issues a change order;

22 Acceptance of the contract, and evaluate and deal with it according to the contract;

23 Dealing with breach of contract in accordance with the provisions of the contract, coordinating disputes, and giving evidence during the arbitration process;

24 Prepare monthly, quarterly and annual reports of supervision work;

25 to assess the contractor’s application for delivery and organize the inspection and acceptance of the proposed project;

26 Issuance of a delivery certificate;

27 supervise and inspect the contractor to prepare the completion file according to the requirements of the engineering management department and the industry student;

28 Prepare the completion files for supervision;

29 Supervise the contractor to conscientiously implement the work plan for the defect liability period, inspect and accept the remaining projects, investigate the causes of the defects and diseases that have occurred in the completed work, and determine the corresponding responsibilities;

30 issued a project defect to blame the termination certificate;

31 issue a final payment certificate;

32 cooperate with the owner's completion acceptance and project handover work;

33 other.

Fourth, the industry’s authorization to the supervision unit

For example, the industry is hereby clarified: the supervising unit shall grant the supervisory unit other powers according to the scope of duties and permission of the supervisory contract accompanying the supervision service, and according to the characteristics of the project or the project.

V. Basis for supervision services

Example 1: Supervision contract;

2 formal contracts, agreements and subsidiary files signed by the industry and third parties;

3 contract drawings and instructions;

4 contract engineering quantity list and description;

5 standard drawings, technical specifications, engineering quality inspection and evaluation standards, test procedures, etc.

6 Supervision regulations promulgated by the State, the Ministry of Communications, and the provinces and municipalities where the project is located;

7 other.

Sixth, other

Both parties may change the contents of this subsidiary file by signing a supplementary agreement.

Owner: Supervisor:
Authorized representative: Authorized representative:
Year month day year month day

Subordinate file B Owner's supervision work conditions

I. Archives and materials

Example: The owner provides the following files and materials to the supervisory unit free of charge within __ days from the effective date of the supervision contract:

1 The contractual agreement and conditions signed by the owner and the contractor __ copies;

2 The list of the number of projects that have been jointly confirmed by the owner and the contractor and their explanations__份;

3 contract drawings and related standard drawings and explanations __ copies;

4 technical specifications, inspection and evaluation standards, and operational remote procedures specified in the contract;

5 other.

Second, decision-making and decision

Example: Owner's consent: According to the request of the supervisory unit for major issues such as the project, quality, investment, contract and safety of the project or the project, and timely decision or decision.

The two parties hereby stipulate that the owner shall give a written reply to the above questions.

Third, assistance

Example: The owner provides the following assistance to the supervision unit at the project location:

1 Establish access channels for supervision staff and personal property;

2 Establish a financial channel for supervision service fees;

3 Establish the public relations and information channels required for supervision services;

4 to avoid the charges of third parties caused by the supervision unit to perform supervision services according to the supervision contract;

5 Resolving the repatriation of supervisory staff and related matters when an accident occurs due to the reason of non-supervising unit;

6 other.

Fourth, facilities and goods

Example: The owner provides the following facilities, equipment and articles to the supervisory unit free of charge, and bears the corresponding usage fees and maintenance costs.

The parties hereby stipulate that the owner shall provide the supervision unit with the variety, quantity, time of use and duration of the following facilities, equipment and articles;

2 living facilities;

3 office equipment;

4 living equipment;

5 overnight equipment 6 transportation equipment;

7 test and testing equipment;

8 office items;

9 other.

The two parties hereby stipulate that the following facilities, equipment and articles shall be provided by the supervision unit and the owners shall provide appropriate economic compensation.

List of facilities, equipment, articles and economic compensation provided by the supervision unit

V. Auxiliary staff

Example: The two parties agreed that the owner will send the staff ___ name to the supervisory unit free of charge, and the service personnel ___ name, assist the supervision unit to supervise the service work.

The two parties agreed that the following auxiliary staff members shall be employed by the supervision unit and the owners shall provide appropriate economic compensation.

The list of auxiliary staff employed by the supervision unit and the economic compensation method

Sixth, other

Both parties may change the contents of this subsidiary file by signing a supplementary agreement.

Owner: Supervisor:
Authorized representative: Authorized representative:
Year, month, day, year, month, day

Subsidiary file C Supervision service fees and payment

I. Supervision service fees

l the cost of normal service

Example: The calculation method, rate and price of the normal service fee of the supervision unit or other methods agreed by both parties.

The normal service fee of the supervision unit should generally include the following contents:

Resident supervision fee

--Basic wage

- overtime pay

- various subsidies

——All kinds of posts

--Personal Income Tax

--other

Site fee

——Aids, services, staff and other personnel hire fees

——Office supplies fee

—— Stationery paper fee

--Data fee

--Labour protection fee

—— Heatstroke prevention or winter heating fee

- a meal

- travel expenses

- coal, gas, water, electricity costs

——Transportation and communication resources

--other

Unforeseen expenses

Proposed ratio 10%-15%

Company fee

- statutory retention fund

- superior management fee

- statutory profit

- statutory tax

--other

2 additional service fees

Example: The basic calculation method for supervising additional service fees is determined by both parties through negotiation. Generally, the following methods can be used:

Additional engineering workload x basic rate;

Additional service working days X supervision service daily average cost;

Additional service work ratio X supervision service cost total.

Second, the payment of supervision service fees

Example: l mobilization prepaid

In order to enable the supervision service to be carried out in time, the owner pays the __ yuan mobilization prepayment to the supervision unit within __ days after signing the supervision contract and the supervision unit providing the performance guarantee.

2 performance guarantee

According to the provisions of Article 5.5.3 of the general conditions of the supervision contract, the owner shall confiscate all or part of the performance guarantee fund of the supervision unit, and shall not affect other payment that the supervision unit shall receive according to the supervision contract.

3 compensation

According to Article 4.1 of the General Conditions of the Supervisory Contract, the compensation unit shall deduct the compensation from the owner from the daily payment to the supervision unit.

4 payment time and payment content

According to the calculation method and payment time of the supervision service fee determined by the supervision contract, the industry pays the supervision unit the fee for the normal service and the additional service, and the compensation for the supervision unit determined according to Article 42 of the general conditions of the supervision contract.

5 payment methods

At the same time of each payment, the owner deducts the mobilization prepayment according to the proportion of the mobilization prepayment to the total supervision service fee; according to the general conditions of the supervision contract, Article 4.1 determines the financial compensation of the supervision unit to the business, each time the compensation The amount of deduction shall not exceed __% of the supervision service fee payable in the current period; when the payment amount of supervision service fee is less than _ yuan, the supervision service fee payable in the current period shall be merged into the next payment.

6 settlement

Within __ days after the issuance of the project delivery certificate, the supervision service fee of the corresponding project shall be settled, the balance of the mobilization prepayment and the compensation of the supervision unit shall be deducted, and the owner shall refund the performance guarantee fund of __% to the supervision unit; the termination of the responsibility for issuing the project defect shall be terminated. Within __ days after the certificate, the supervision service fee for the settlement project defect liability period and other balances that should be paid to the supervision unit shall be deducted from other funds that should be deducted from the supervision unit. The owner refunds the remaining performance bond to the supervisory unit.

Third, other

Both parties may change the contents of this subsidiary file by signing a supplementary agreement.

Owner: Supervisor:
Authorized representative: Authorized representative:
Year, month, day, month, day