Fan Wen Daquan > Contract Model > Tendering Contract Model

Construction and installation project bidding


In order to improve the construction speed of construction and installation projects and improve economic efficiency, _________ will approve the entire project of ______ construction and installation project.

First, the preparation conditions for the bidding project

The following tender conditions for this project are available:

1. This project has been included in the national annual plan;

2. Construction drawings and budget estimates from design units approved by the state;

3. Construction land has been requisitioned and all obstacles have been demolished; water, electricity, road and communication conditions for on-site construction have been implemented;

4. Funds, materials, equipment distribution plans and coordination supporting conditions have been implemented separately to ensure supply, so that the proposed project can be constructed continuously during the scheduled construction period;

5. There is a building permit issued by the local construction authority;

6. The base of the project has been reported to the construction department and the construction bank for review.

Second, the project content, scope, engineering quantity, construction period, geological survey unit and engineering design unit:

________________________________________________________________________________.

Second, the site, water, electricity, roads, etc. available for the project:

____________________________________________________________________ ___________.

Third, the project quality grade, technical requirements, special requirements for engineering materials and bidding units, engineering acceptance criteria:

____________________________________________________________________ ___________.

Fourth, the project supply method and the price of the main materials, the settlement method of the project price:

________________________________________________________________________________.

V. Organize the bidding unit to carry out the site survey of the project, explain the time when the bidding file is submitted, and the location:

____________________________________________________________________ _____________.

Sixth, registration, bidding date, bidding file transmission method:

Registration date: IX ______ year ____ ____ ____ day;

The bidding period: from _________ years ____________ to ______________________

Bidding file transfer method:

___________________________________________________________________.

7. Bid opening, time and method of bid evaluation, bid winning basis and notice:

Bid Opening Time: IX ______ Year ____ Month ____ Day.

End of bid evaluation time: ______ year ____ month ____ day.

Bid Opening and Bid Evaluation Methods: The construction unit invites the competent construction department, the Construction Bank and the Notary Office to participate in the public bid opening, review the certificate, and adopt the collective appraisal method for bid evaluation and calibration work).

Basis and notice of winning the bid: The basis for the bid evaluation unit of this project is that the project quality is excellent, the construction period is appropriate, the bid price is reasonable, the social reputation is good, and the lowest bidding unit is not necessarily winning the bid. When the bid price of all bidding enterprises is higher than the bottom price, if it is a wrong calculation of the bottom, it should be adjusted according to the actual; if the bottom of the bid is correct, the unreasonable part is removed by the evaluation, and the reasonable price and the winning bidder are determined. Within five days after the end of the assessment, the bidding unit will send the notice of winning the bid to the winning bidder by mail, and sign the ______ construction and installation contract with the winning bidder in January.

Eight, other:

____________________________________________________________________ ___________.

The bidding party promises that once the bidding document is issued, the contents of the original bidding file shall not be changed. Otherwise, the losses caused to the bidding unit will be compensated. The bidding unit shall, at the expense of the requirements of the bidding documents, participate in the bidding preparation work and bidding at its own expense. The bidding documents shall be filled in according to the prescribed format, the writing shall be clear, and the seals of the unit and the representative shall be affixed. The tender must be sealed and must not be overdue. Once the tender has been issued, it shall not be requested to be recovered or altered for any reason.

In the process of bidding, if there is any dispute between the two parties, the department responsible for the bidding management shall mediate the arbitration and dissatisfied with the arbitration, and may appeal to the court.

Construction unit:___________________

address:_________________________________

Contact: ____________________

phone:____________________