Contract model: tender for construction and installation projects


In order to improve the construction speed of construction and installation projects and improve economic efficiency, _________ approved _________ to tender all the _________ construction and installation projects.

I. Preparation conditions for the bidding project:

The following tender conditions for this project are available:

1. This project has been included in the national annual plan;

2. The construction drawings and budget estimates of the design units approved by the state;

3. The construction land has been requisitioned and all obstacles have been demolished; the water, electricity, road and communication conditions for on-site construction have been implemented;

4. The funds, materials, equipment distribution plans and coordination supporting conditions have been implemented separately, which can guarantee the supply, so that the proposed project can be constructed continuously during the scheduled construction period;

5. There is a building permit issued by the local construction authority;

6. The base of this project has been reported to the construction department and the Construction Bank for review.

Second, the project content, scope, engineering volume, construction period, geological survey unit and engineering design unit: _________.

3. Sites, water, electricity, roads, etc. available for the project: _________.

4. Engineering quality grade, technical requirements, special requirements for engineering materials and bidding units, project acceptance criteria: _________.

V. Project feeding method and price of main materials, settlement method of project price: _________.

6. Organize the bidding unit to carry out the site survey of the project, explain the time when the bidding file is submitted, and the location: _________.

7. Registration, bidding date, and bidding file transmission method:

1. Registration date: _________ years _________ months ______ days;

2. Bid period: _________ years _________ months _________ to _________ years _________ months _________ days.

3. Bidding file transfer method: _________.

8. Bid opening, time and method of bid evaluation, bid winning basis and notice:

1. Bid opening time: _________ years _________ month _________ days.

2. End of bid evaluation time: _________ years _________ months _________ days.

3. Bid Opening and Bid Evaluation Methods: The construction unit invites the competent construction department, _________ and other units to participate in the public bid opening, review the certificate, and adopt the collective appraisal method for bid evaluation and calibration work.

4. Basis and notice of winning the bid: The basis for the bid evaluation unit of this project is that the project quality is excellent, the construction period is appropriate, the bid price is reasonable, the social reputation is good, and the lowest bidding unit is not necessarily winning the bid. When the bid price of all bidding enterprises is higher than the bottom price, if it is a wrong calculation of the bottom, it should be adjusted according to the actual; if the bottom of the bid is correct, the unreasonable part is removed by the evaluation, and the reasonable price and the winning bidder are determined. Within five days after the assessment, the bidding unit will send the notice of winning the bid to the winning bidder by mail, and sign the _________ construction and installation contract with the winning bidder with the winning bidder within one month.

Nine, other:

The tenderer promises that once the tender has been issued, it shall not change the contents of the original bidding file. Otherwise, the losses caused to the bidding unit will be compensated. The bidding unit shall, at the expense of the requirements of the bidding documents, participate in the bidding preparation work and bidding at its own expense. The bidding documents shall be filled in according to the prescribed format, the writing shall be clear, and the seals of the unit and the representative shall be affixed. The tender must be sealed and must not be overdue. Once the tender has been issued, it shall not be requested to be recovered or altered for any reason. In the process of bidding, if there is any dispute between the two parties, the department responsible for the bidding management shall mediate the arbitration and dissatisfied with the arbitration, and may appeal to the court.

Construction unit:_________

address:_________

Contact: _________

phone:_________

_________year month day

Subsidiary file

Construction drawings, surveys, design materials and design specifications

Building installation project contents list