Fan Wen Daquan > Contract Model > Tendering Contract Model

Power Engineering Equipment Tendering Procedures and Tender File Model Part V (Sectional Provisions)


Power engineering equipment tendering program and tender file model

Part V Supplementary Provisions

1.0.1 This specification is prepared according to the on-site delivery of the project. According to the specific conditions of the project, the project legal person can also adopt the on-board/onboard delivery method of the originating station/terminal. If this delivery method is adopted, the relevant provisions should be adjusted accordingly. At this time, the bulk transportation is in accordance with the State Power Corporation. The bidding procedures for large-scale equipment transportation of engineering shall be carried out in the Model Document of Bidding Documents.

1.0.2 Considering the current actual situation, the performance bond shall be gradually implemented in place, and now it is temporarily tested at 2%, and Zop is executed at 10% in the future.

1.0.3 This Code shall be implemented as of the date of promulgation.

1.0.4 The right to interpret this specification belongs to the Office of the Leading Group for the Examination of Power Engineering Equipment of the Ministry of Electric Power/National Electric Power Company.

recommended article

popular articles