City Water Resources Bureau 2019 work plan


The working idea of ​​the Water Resources Bureau of the year is: "After a center, highlight two key points, implement four major projects, and do a good job in four jobs."
First, around a center. Guided by the important ideas of “xxxx” and the scientific outlook on development, we will focus on the work of the municipal party committee and the municipal government, closely connect with the reality, contact the interests and requirements of the masses, combine the urbanization of the city and take the lead in realizing the grandeur of agriculture and rural modernization. Goal, carry out various water conservancy work.
Second, highlight two key points. It is necessary to highlight the two key points of strengthening water safety and improving water environment. Through the unremitting efforts of water conservancy work, we will build a high-standard water conservancy project system and a water eco-environmental protection system, and continuously improve the safety of water, water safety, ecological safety and other water safety. The urban water environment, the rural water environment and the water ecological environment of Dongyang City will promote the transformation of water conservancy work in the city to urban water conservancy, environmental water conservancy, resource water conservancy and benefit water conservancy.
Third, the implementation of four major projects. That is to say, we will do a good job in the construction of water conservancy projects focusing on reservoir preservation, Qingshui River, farmers' drinking water and irrigation district reconstruction.
1. Grasp the reservoir preservation project and improve the safety of the reservoir in our city. The estimated investment of the ×× reservoir dam reinforcement project is 95 million yuan. It has been included in the second batch of reinforcement plan for the Ministry of Water Resources and will start construction next year. ~ There are 8 projects in the “Thousands of Databases” that are reported to be approved for approval in the province, with a total investment of 24 million yuan.
2. Building farmers' drinking water projects and working hard to improve rural water use conditions. ~ The annual investment project of “10 million farmers drinking water” in our city is about 35 million yuan. Focus on the construction of the ×× reservoir to the ×× water supply project. At the same time, we must continue to solve the problem of drinking water for farmers in some mountainous areas.
3. Carry out the construction of Qingshui River and actively promote the pace of water ecological environment construction. In the year, the city plans to carry out the construction of the “Wanli Qingshui River Road”. The length of the river is about 25km and the investment is about 50 million yuan. The main projects include dike project and comprehensive remediation project, 4km embankment construction of the fourth phase of the city defense, Jiangxindao landscaping project, and Jiangbin Park agricultural mechanization school section.
4. Implement water-saving supporting renovation project in irrigation district to improve water utilization coefficient of irrigation district. Next year, the city will implement a comprehensive water-saving project for agricultural comprehensive development ×× irrigation district, with a total investment of 22.4 million yuan, and the first phase of channel construction next year will be 51.27 kilometers; XX irrigation district water-saving renovation project, with a planned investment of 7.441 million yuan Next year, 13 kilometers of anti-seepage reinforcement channels will be completed. In addition, we must do a good job in the development of the XX River Basin and the water diversion project to the XX Reservoir, the Ganxikeng Reservoir Project in the XX Town, and the ecological restoration project in the XX Reservoir Area. Hydropower development should complete the ×× power station, ×× power station, ×× power station, and × information command system, strengthen the reservoir management and dispatch, and ensure the safety of the water conservancy project. At the same time, we will do a good job in drought prevention and drought relief for the problems that occurred in the drought last year and this year.
5. Strict water law and fishery law enforcement. Strengthen water laws and regulations and water project safety publicity to raise public awareness of water law. Focus on standardizing management and investigating cases, and do a good job in water law enforcement management. Seriously do a good job in approval, supervision and management, collection of fees, and resolution of major water disputes. Increase the intensity of crackdowns on illegal activities, effectively stop and investigate violations of water and fishery.
6. Deepen the reform of the water conservancy system. The system reform of the five pilot reservoir management units was implemented. Actively promote separation of custody, further deepen internal management and personnel system reform, strengthen internal target assessment, and put all reform measures in place.
7. Accelerate the development of water conservancy economy. We will implement various systems for safe production, scientifically and rationally regulate and control the water resources of the reservoir, and generate as much power as possible while ensuring agricultural water and domestic water. The water supply department is doing a safe water supply and has more benefits. Give full play to the role of the aquatic industry association, take the project as the starting point, and use the base as the carrier to promote the fishery production in our city to a new level.