Personal year-end summary of employees


Ruixue Yingfeng years, a heavy snow just past a few days ago told us that another cold winter has arrived. The arrival of this winter also indicates that the brilliant XX year has come to an end, as if in a blink of an eye, we sent this away. The auspicious mouse ushered in the hardworking cow of XX.
XX years is closely related to the grand development of our electrical company, and it is inseparable for one year. During this year, our organization carried out major reforms. This is a great reform. Many of the mainstays in the company have been used in key positions in recent years, playing an important role in the company's long-term development. They are both the company's new force and the leader of our progress. Under the leadership of the new leadership team and under the command of these young people who have made great achievements, our company has achieved one after another in this year's work.
I, as a member of the electric company, made great progress this year as the company grew. Learn at work and grow in learning. After finishing the task assigned to me by the superiors, I also increased my technical level. My year is a year of hard work, a year in which the company has done its job well and fulfilled its duties. It is a year that has grown stronger than last year. During this year, I participated in the construction of the new construction project of the Second Chemical Plant, and also directed the external force team to carry out the construction in the large ethylene project. This year's work trained me from a labor-intensive front-line staff. It has become a labor-management talent that leads others to complete the work, and has learned a lot from it, which has better enriched my personal qualities and made me better for our company in the future work. Development creates greater benefits. Learning will improve, although I have not managed construction before, but I will start from scratch. In the construction process, my work partners and I have been sticking to the front line. They work with tools on the spot. I bring drawings to guide each of their construction sites. Although I have not been in this profession for a few years, I still use my experience to help them complete all the work. When they have any difficulties and troubles, I know that they will share them with them and make them faster and better. Complete the construction task. Therefore, although I did not directly participate in the construction, but the successful completion of the project also has a credit for me, but also the result of my hard work.
In the first half of the year, I directly participated in the construction of the Dilute-1 project. Our project team is responsible for the construction of the two main plants in the dilute project—the compressor plant and the main plant. The two plants have a total of 28 electric motors. There are 21 wind turbines and hot air curtains, 7 accidental fans and more than 60 sets of lighting fixtures. The required piping tasks are heavy, and the conditions on the site are still very difficult. Some of the pipelines are not straight, and some other facilities need to be avoided. For these problems, I work with the construction personnel every day to conduct research and measurement until the most Good route to lay our steel pipes. Especially when we have finished the pipe, some process pipelines pass through our pipes, and we cut our pipes, so we have to find a new way to re-equate our pipes. For the sake of the overall situation, we have no hesitation. In addition to piping, we also have an important job, which is to organize their wiring after wearing the cable. This is also an important part of our installation work. Many of the previous work is cumbersome, but there are not too many technical requirements. Wire wiring requires the construction personnel to have sufficient technical skills, and can not be misconnected and blindly connected, and can not correct a line, otherwise all the work done for it will lose its meaning. This is also a weakness of those outsiders. When they are on the school line, I have to go to the scene for guidance and supervision to ensure that the cable of each motor is correct, so as to ensure a successful test, in order to complete the task with quality and quantity. Although there is no need to study at this stage, it is also very important to teach them the meaning of drawing and wiring. Some of them are savvy and will teach, but most people need you to explain patiently. Until he understands the principle of the motor drawn on this drawing, understands the role of each line in the loop, you can safely hand over this motor to him, and experience the fun of teaching and teaching. .


In the second half of the year, we invested in the construction of the large ethylene project. In this project, we have to dismantle the 11-face low-voltage disk, and the old 6-sided disk cabinet, and remove the bismuth catalytic substation in the butyl octanol plant of the second chemical plant. All motor cables that are fed out are re-applied to the old low-voltage disk. Among them, we need to reverse the motor load of 13 units. Although this work does not need piping, the original cable protection tube is used, but the working environment is very complicated. There are both inflammable and explosive places, as well as dangerous places that are toxic and harmful. A little bit of care can lead to a fatal danger like a gas leak. This requires us to take safety measures at the scene. As a safety officer, I must supervise whether the construction personnel have violated the regulations, and also have the construction conditions on the work site to urge our staff to enter the site. My duties give me supervision of construction safety and guarantee that life and property will not be unnecessarily lost. I am responsible for the brethren who share my hardships with me, and I am responsible for the goal of zero accidents and zero injuries for my unit during the year. Therefore, we must not be taken lightly. We must familiarize ourselves with each site and make safety measures and communicate them to each team member. They should be familiar with the risk factors at the scene and the escape route after the danger. They need to confirm the construction conditions at the site before work, do all the procedures and do the oxygen measurement and explosion work. Although this process is very cumbersome, it is the only choice to ensure safety. There are still many complicated factors in this project. Our construction must be synchronized with the overhaul of the installation. Since this year is not overhaul, the construction period of the inspection is relatively short. After we have re-designed the construction coordination, we must arrange for the work class members to work overtime. Invest in the construction, grab the time to grab the progress. The old low-voltage disk incoming line was taken from the butanol substation. The construction unit required us to work only at night during the docking. For the adjustment of the construction time, we also made corresponding arrangements. I led the working class members. From 6 o'clock in the evening until 2 or 3 o'clock in the middle of the night, drill holes in the busbars, make the cable heads and then dock them on the busbars. Although there are many problems in the middle, I have gradually solved them with the construction personnel, and We are very pleased to have achieved a successful power transmission. In the subsequent cable shifting project of the substation substation, our work class members still played a fighting style that was not afraid of being tired or tired. When the construction was done at night, they insisted on the points. We jointly completed the 1800-meter cable demolition. , re-applied more than 500 meters, 12 cable heads, two-stage incoming power supply was successfully delivered at one time. Therefore, it was jointly praised by the construction unit and the large ethylene project team.

Looking back at the work of the past year, I took a big step from an ordinary electrical worker to the construction management staff, but summing up the development of the past year, it has exposed many small problems. In the construction management, the requirements are not strict enough. Sometimes the external force personnel are not serious enough in the construction. I only saw it when I saw it. After the completion of the pipe, the two steel pipes were inconsistent in level, and they were ordered to rectify but delayed the construction period. Worm work. In addition, after the welding, the anti-corrosion treatment was not carried out in time. After I found out, I only reminded me that I did not urge them to perform immediately. As a result, the inspection team re-worked before the inspection. There are also some small dangerous links in safety that have not been corrected in time. Although there are no major safety incidents, they have put forward opinions on my work. As a safety officer, we must be not afraid of trouble. Some people violate safety regulations. Must be stopped in time.
In my work next year, I have to overcome the deficiencies found in my work this year. I have strict requirements on safety and quality for myself and the construction workers during the construction. We have carefully formulated the construction tasks for each day, and we will make progress and never let the workers work. And rework is happening. Strictly control the use of engineering materials, feel free to waste a screw, a cable tie, so that all engineering materials can make the best use, no unnecessary waste.