In the xxxx year, in addition to the normal maintenance work in accordance with the annual work plan, the hotel engineering department actively completes the reconstruction project under the premise of ensuring the normal operation of all systems, so that the equipment and facilities can be in the best state, as summarized below. :
I. Equipment operation
1 Mains electricity; the high-voltage cabinet is operating normally, five transformers are running well, no abnormal situation occurs, the outlet cabinet switches are intact and damaged, and the double power supply boxes are intact and no faults.
2. Water supply and drainage: The three sets of cold water pumps are running normally, the frequency converter is running normally, the hot water circulation pump and the return water pump are normal, and can generally meet the operational requirements. The drainage pump of the 6 collecting wells in the basement is normal, the pump does not rust and does not turn. The usual inspection is also in the jog operation, and the drainage of the rainwater pipe is smooth without damage and leakage.
3. Boiler room: The operation of the three boilers is basically normal. There is no big fault after the last maintenance of the controller. The air conditioner No. 1 boiler sometimes has an over-temperature phenomenon and the medium is overheated.
4. Refrigeration unit: The screw machine is maintained and cleaned before starting this year, and the approach value is controlled within 2.0. This year lays a good foundation for energy saving and consumption reduction of cold air conditioning.
Second, the maintenance project:
The engineering department completed more than 15,480 maintenance tasks this year. . In the whole year, there were more than 20 leaks in the pipeline. More than 300 valves have been repaired and replaced, and more than 1200 lamps have been replaced. More than 500 pieces of wood products and furniture were repaired, and more than 200 pieces of various fittings were replaced. Ppr hot melt pipe more than 100 meters, pvc pipe more than 250 meters. Replace 50 hoses. More than 40 leaks in the bathroom, repairing more than 100 square meters of peripheral granite pavement.
Under normal circumstances, the maintenance tasks of the engineering department are mainly determined by the needs of the front-line business departments. However, for various reasons, some emergencies still occur from time to time. A total of 8 exposures occurred in xxxx years. In June, the copper pipes in the central area were partially replaced. In response to the problems of the system, we began a comprehensive inspection of the hot and cold water system piping from October, the maintenance of the repair, the replacement of the replacement. Appropriate decompression of the water pressure in the central area. Therefore, it is very important to strengthen the maintenance of equipment, improve the service life of the equipment, and formulate a scientific and reasonable operation plan to ensure the normal operation of the engineering department.
3 energy saving and consumption reduction;
The total cost of the xxxx building was 4.616 million yuan, which reduced the rent-free and outsourcing area of 1,447,700 yuan, and the actual hotel expenses was 3,170,300 yuan. The total electricity consumption is 3.342 million kWh, the air conditioning power consumption is xx million kWh, the outsourcing area uses 479,900 kWh, the parking garage electricity consumption is 530,200 kWh, and the total water consumption is 73,500 tons, of which no anti-rental The water consumption in the outsourcing area is 286,000 yuan, and the gas consumption is 261,300 cubic meters. The highest average energy cost per room is 40.02 yuan, and the lowest average energy cost per room is 18.73 yuan.
Four human resources;
The department has 21 staff members and 1 external staff, including 4 electricians, 4 plumbers, 5 universal workers, 4 network managers, and 1 Anhui project.
Although in the work of xxxx, the hotel has successfully completed the maintenance and maintenance tasks of the hotel and the tasks assigned by the leadership, and achieved certain results, but it also exposed many problems and unsatisfactory places, the specific performance is;
1 The staff's hotel awareness is not strong, lack of team spirit, low work enthusiasm, and less communication with other departments.
2 The level of technology is uneven, the skills of individual employees are poor, lack of independent work ability, and strong work dependence.
3 Insufficient work initiative, low work efficiency, lack of ownership, and awareness of energy conservation need to be strengthened.
Hotel project management is an art. In addition to the technical understanding and proficiency of various equipments and various types of work, it also needs to have the ability to communicate and coordinate with the superiors and subordinates, carry forward the team spirit, strengthen the education of dedication and professional ethics, and strive to Improve management.
The competition of modern hotels has evolved from the front desk to hardware, sales, and services to the management of back-end engineering, mining, and energy consumption. The engineering department is a logistics department in the hotel, and it is a department that spends money in the eyes of people. We will work hard to learn the engineering management experience of advanced hotels, improve the preventive maintenance system, keep the equipment in an efficient working state, completely reduce energy consumption, slow down the growth of maintenance costs, and extend the service life of equipment, thus saving money. Every penny saved by the engineering department will become the net profit of the hotel. Building the engineering department into a new profit-making department of the hotel and creating higher economic benefits for the hotel is the goal we strive for! Enable equipment facilities to operate at optimum conditions.
recommended article
- Summary of the work of the Agricultural Machinery Bureau in 2019 and work in 2019
- Summary of 2019 water administration and water resources management work
- Summary of work for disabled people in 2019 and work in 2019
- Radiology year-end summary essay
- Township town year-end summary commendation speech
- Summary of the work activities of the city's style of work construction
- Warehouse manager work summary
- Summary of the work of the Street Work Committee in 2019
- Summary of the 2019 year-end work of the Provident Fund Management Center
- Summary of the annual work of the company's party branch
- Year-end summary of engineers in 2019
- Company year-end summary
popular articles
- Year-end summary report
- Thanks to the friend's words 2019
- Bing Xin’s famous words
- Total migrant population planning work in 2019
- Summary of the work of state-owned forest farms in 2019
- Deaf people jingle 2019
- Du Yuexi's famous sayings
- Summary of the work of the 2019 toll station
- Injured sentence
- 2014 is very touching words
- Tao Xingzhi's famous sayings
- Describe the fast time sentence 2019
- Strong words
- I want to say something to the teacher.
- Korean swear words
- College entrance examination inspirational quotes
- Taizai’s famous sayings
- Sad love sentence 2019
- Classical life motto
- 2012 Party Branch Work Summary
- Summary of Party Building Work in 2019
- Teacher's famous saying
- Summary of Party Committee Work in 2019
- The latest high school inspirational maxim
- Summary of family planning work in 2019
- a good saying that loves labor
- English famous words
- Summary of 2019 Ideological and Political Work
- Summary of the work of the Party Committee in 2019
- Qq space mood phrase