Equipment Department Management Year-end Work Summary


Under the leadership of the company's leadership for a year, under the leadership of Mr. Yue, the equipment department completed the equipment maintenance, equipment maintenance, and equipment management in 2019 under the joint efforts of all the staff of the equipment department and the support of various departments. . Ensure that the equipment is functioning properly and meets the needs of production tasks. Below is a summary of the equipment department in 2019 and a plan for 2019.

2019 is an important year. The old factory moved to the new factory. After several months of intermittent operation, it was carefully measured and planned before the equipment transfer. The equipment base reserved hole was well prepared for the transfer of equipment in advance. The basics. From the disassembly of the equipment to the handling and installation of the equipment, a lot of rest time was sacrificed in advance to achieve safe, accurate, timely and smooth moving to the new factory. All the construction workers are not afraid of dirty, not afraid of the cold, not afraid of tired, and work together to successfully complete the equipment relocation task. As of April 12, a total of 45 installation equipment were relocated.

For the newly purchased equipment, precision measurement, precise construction, and proper arrangement have been made to ensure the accurate installation of new equipment. As of December 12, 12, a total of new equipment including "large coiling machine, digital display pair of trampolines, etc.", and self-designed, built a 2400t press brake.

In the second half of the year, under the guidance of xx teacher, a new equipment management process was established, which greatly improved the equipment management work, and made the equipment environment of the factory area look new. The equipment of the old factory was dirty, chaotic, and poor. Back, showing the face of the Dongfeng factory is booming.

In the maintenance work of the equipment, it is done, on call, on call, and the problems are solved in time, and the safety hazards are dealt with in time, which does not affect the normal production tasks of the workshop.

The new year is coming, new and old equipment has been put into normal work, and the main task next year is to maintain and maintain the equipment. The maintenance level of the equipment department personnel is improved. Our equipment department must be not arrogant, not dry, and continue to complete the maintenance and maintenance tasks in the factory. To provide the perfect service for the production of the first line.