On the day of the month, our project department conducted five days of intense training under the organization of the four company training group. After the training, all the staff of our xx project have gained a lot, and we have given us a strong booster, so that we have more confidence in doing a good job. At the same time, we also felt that the company cares and helps our project personnel. We firmly believe that with the help and guidance of the company, the Lezi project will surely achieve excellent results, and will give the head office and the Sichuan people and Shandong Express Group a satisfactory answer.
In this training, we have studied engineering management, equipment management, material management, financial management, labor management, party style and clean government construction, roadbed construction contract signing and management, and safety management and construction staff training. Let us have a good understanding of the work and the nature of the work of each functional department, and let us understand how we can work together in the work to maximize the cost-effectiveness of the target. In the course of the training, in order to enable each of our staff to understand and understand, each of the lecturers has detailed their explanations and attached cases, which are vivid and vivid.
Especially in the training of engineering management, construction and construction workers, I feel that I have benefited a lot. Let me know a lot of things that should be paid attention to during the construction process, the connection and handover between the process and the process; teach me how to control the quality and cost during the construction process, and also teach me how to avoid the appearance in the construction Various risks. As a member of the quality inspection department of Lezi Project, I think this training has given us a lot of help. The Quality Inspection Department is the department with the most staff and the most responsibility. It is the department that works in the first line of construction and faces the whole project. It shoulders both engineering management and construction, and also undertakes important work of project quality supervision. Through this training, we pointed out the direction of work for our quality inspection department, so that each of us is more familiar with the construction process and construction process of each process, and made a detailed technical explanation for our future work. We are more assured and practical in our future work and management.
From the time I joined the work to the present, I always thought that the backfilling of the back of the back was only 30 cm per layer, and the layers were filled and layered. It was through this training that I discovered that I was so ignorant. Backfilling has so much experience and things to be aware of. Once a process is not completed, it will cause irreparable damage to the entire project and seriously affect the quality of the project, resulting in rework and damage to the company's interests.
In the future work, I will strictly follow the requirements of the company's training, strictly control the quality, supervise the quality, and strictly follow the company's system to constrain myself and the people around you. In each period of settlement of the external construction team, the construction contract is strictly implemented, and the measurement data provided is timely and effective. The amount of work for each structure is carefully checked, and it can be settled by the external construction team after repeated verification. Do a good job in their own work, complete the various tasks of leadership and confession on time, learn from the advanced figures around you, strengthen their business capabilities, maintain the advanced nature of party members, and strictly demand themselves in accordance with the standards of party members.
In this study, we studied engineering management, equipment management, material management, receiver training, labor training, quality management, financial management, safety management, construction staff training, party affairs and clean government construction, party class learning, and some of the head office. system. After a few days of intense study, I learned a lot. Not only knowledge, but also the attachment to work.
We have studied engineering, materials, equipment, finance, and other departments. I have basically mastered their rules and regulations and some programs, as well as the relationship and connection between some departments. Knowing the reasons for the unfinished project progress plan is analyzed and analyzed by the engineering department. After the summary, the engineering department is responsible for feedback to the relevant departments and simultaneously submits the next month's plan. According to the engineering department's material demand plan, the materials department organizes extensive market research. The unit price of the target cost material of the collective decision of the project team and the grassroots team will be reported to the materials department of the head office. After the approval of the materials department, the unit price and supplier of the material will be determined, and the material cost plan for the materials department will be used as the project control cost. According to the contractor, after the completion of the qualified project volume every month, the quality inspection team and the supervision engineer signed by the contractor, the quality inspection department of the project manager department, the engineering department, and the relevant leaders review and approve the report, and pay the project according to the owner. The progress of the payment shall be made, and the payment shall not exceed 80% of the settlement of the current period; and the principle of “four not letting go” in the handling of accidents, the cause of the accident must be kept unchecked, and the person responsible for the accident and the public are not educated. There are no rectification measures, and the responsible persons and leaders of the accident will not handle it. There are many, many, I am very fortunate to have such an opportunity, so that I have accelerated the pace of chasing dreams. After a few days of study, I deeply realized that the project is huge and complicated, and I have felt it in a few days. It makes a lot of sense, knowing the work and programs between the various departments, so that I have laid the groundwork for future work.