Architect job responsibilities


Part 1: Architectural responsibilities

1. Complete the overall design of the architectural style and shape according to the design requirements;

2. Provide various architectural main design, exterior wall design, landscape design, etc.;

3. Assist in solving various construction technical problems during the construction process;

4. Participate in the review of architectural planning and design plans, and the revision of architectural drawings.


Part 2: Architectural Designer Job Responsibilities

Under the leadership of the project manager, specific and responsible for the preparation of the overall construction schedule, and according to the objectives of the overall progress plan, prepare the construction operation plan, participate in the preparation of the labor force required to plan the mechanical equipment, the construction of materials and components Project and fund balance plan.

Participate in the preparation of construction organization design, timely grasp the information of labor, material supply, mechanical configuration, etc., and pay attention to flexible use.

Coordinate the relationship between various plans, pay attention to the overall progress plan as the leader, and other resource allocation plans to ensure the overall progress plan.

Pay attention to the collection of construction project visa information, dynamically manage the construction period, adjust the overall progress plan and track.

Prepare the construction work plan for the ten months, and do a good job in reporting the project, participate in the production coordination and participate in the coordination of installation and other units.

Under the guidance of the leaders in charge, do a good job in the construction, completion, image progress, output value, and physical quantity of the project.

Do a good job of accumulating engineering materials, set up statistical accounting accounts, and timely log in to guide construction workers to remember the construction diary.


Chapter 3: Architectural Designer Job Responsibilities

1. Develop a design progress plan according to the arrangement of the professional person in charge, and complete the design tasks undertaken on time.

2. Seriously study the basic design data, understand the design intent, master the design standards, do a good job in the design of the part responsible, and solve related technical problems.

3. The design calculation conforms to the unified technical regulations of the project, and the calculation is accurate and in accordance with the quality requirements of the calculation book. Whether it is hand calculation or computer calculation, the designer should be responsible for the accuracy, safety and economic rationality of the calculation results.

4. In the construction drawing stage, under the leadership of the professional responsible person, it is responsible for solving the job relationship of the responsible part, providing conditions for other professions, and participating in the summary of each stage. The construction drawing should meet the design depth requirements and the structure is reasonable. The picture is compact, clear, clean and easy to read.

5. Calculate the book and drawings seriously and improve the quality of the shots. The opinions of the proofreaders, professional leaders and reviewers should be carefully revised, and the handling opinions should be written on the school record record.

6. Organize the design files according to the archiving requirements of the design files, and file them together with the professional responsible person.

7. Cooperate with the professional person in charge to do the design work and participate in the site service.

8. For the drawings of the construction drawings and the students who graduated from the internship, the designers carefully check the proofs and submit them to the school for proofreading.

9. Responsible for the design quality, drawing quality and calculation data of the design files and drawings according to the principles set by the superior review;

10. Responsible for coordinating the work done with other professions;

11. When there is disagreement with the proofreader and the reviewer, the right to request the higher level until the general division makes further arbitration, and if there are still different opinions on the final decision of the arbitration, the record may be retained, but must be implemented;

12. If the designed work is responsible for the quality accident due to non-compliance with the regulations, it shall report to the higher level in time, analyze the reasons, summarize the lessons, and conduct inspection and handling.


Chapter 4: Architectural Designer Job Responsibilities

(1) Responsible for the design and construction technical work of the construction project under the Ministry of Design, conscientiously implement the national “Inspection and Design Specifications and Construction Technical Standards”, and assume overall technical responsibility for the quality of the competent projects.

(2) According to the national fire protection construction engineering design laws and regulations, design norm standards, bidding archives content and on-site field survey results, organize the design of the architectural design bidding plan and the deepening design of the construction drawing.

(3) In the process of carrying out the architectural design plan, it is closely integrated with the relevant departments of the company. While considering the design effect, the plan design should consider the requirements of Party A, the progress of the project and the investment situation to ensure that the design of the plan is optimized and pragmatic.

(4) Responsible for the review of the building design files and design drawings. According to the investigation and construction survey work of the participating projects, the screen will be finalized for the engineering drawing design, and responsible for the construction of the project and the engineering team.

(5) Responsible for reviewing and determining the project quantity and all consumables list according to the construction design files, drawings and on-site investigation data, and preparing the application plan for engineering materials, equipment, materials and equipment.

(6) Participate in the construction quality inspection and quality accident investigation and analysis of the competent building design, check the implementation, propose the treatment plan for the quality accident, and correct and formulate the protection and prevention measures at different stages of the project.

(7) In-depth inspection of the construction site, revision of the design problems existing in the construction drawings and related design problems arising during the construction of the project, organization and handling of design issues in the construction, organization of relevant design changes and negotiation procedures.

(8) Responsible for the implementation of new technologies, new materials, new processes, new standards and new specifications in the design of buildings. When the situation changes, adjust them at any time to participate in the commissioning, acceptance and delivery of the competent projects.

(9) Responsible for the supervision of building quality records, technical materials, and completion materials, do a good job in building engineering summaries and special technical summaries, do a good job in training talents, and complete the temporary phased tasks of leadership distribution.


Chapter 5: Architectural Designer Job Responsibilities

1. According to the product function positioning and urban planning requirements, prepare a design task book or design power of attorney, organize the design project bidding work, and provide advice on the optimization of the program design.

2. Participate in the formulation of the terms of the design commission contract; participate in the negotiation of the design commission contract as needed.

3. Participate in the control of the target cost, design quality and design progress of the project; and supervise the implementation of the contract and agreement by the design unit, and report it to the department manager in time.

4. Track the market requirements for real estate products, pay attention to the latest practical technologies of this profession, and make recommendations to the company on the use of new construction technologies.

5. Organize and supervise geological survey and control measurement work, and host the signing of design contract and survey contract.

6. Organize technical program review, including major technical problems such as design specification standards, pile foundation and foundation pit support, structure selection, etc., and report to Panyu project manager for unexpected situations.

7. Follow up the design work, put forward professional review opinions for the unreasonable situation in the design, and urge the follow-up design revision to prepare a monthly report on design quality issues.

8. Organize the construction drawing to review. Review the depth of the design, the safety, economy, and rationality of the building.

9, design change management.